Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Traffic Issues
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


251 Blog Posts Since 2003
Go to Page: 1 | ... 20 | 21 | 22 | 23 | 24 | 25 | 26
Search JDLand Blog Posts by Date or Category

The South Capitol Street Environmental Impact Statement project has posted its Winter 2006 newsletter with the latest updates on the study. Two build alternatives have been identified and are briefly described--the less costly one would keep the South Capitol and M intersection in two levels, and would create a "traditional" intersection at Potomac Avenue. The second and more wide-ranging alternative would reconstruct South Capitol and M to be "at-grade", and would create a traffic circle interchange at Potomac Avenue (there are differences in the two plans for east side of the bridge as well). The various plans (the two build alternatives, plus a "Transportation System Management" alternative and a No-Build alternative) will be presented at public meetings later this winter, then there will be ANC meetings, environmental analyses, and finally the preparation of the draft EIS. In the meantime, DDOT will be discussing this project as part of its Feb. 25 Open House. Also, both the South Capitol Street EIS and the 11th Street Bridges EIS teams will present their pedestrian and bicycle concepts to a meeting of the Bicycle Advisory Council on March 8. See my South Capitol Street and South Capitol Street Bridge pages for more details, photos, links, etc.
 

ANC 6D has released the agenda for its December 12 meeting. Items of Near Southeast interest include: an update from DDOT on traffic and parking and the new baseball stadium; an Office of Planning presentation on the proposed text amendment to the Capitol Gateway Overlay; a Public Space Permit Application for an emergency generator at Capper/Carrollsburg; and a ABC License Renewal for the 3rd and K Market. The meeting is at 65 I Street SW, at 7 pm. UPDATE: Agenda now posted. UPDATE II: You can read a report on ANC 6D's November meeting (with discussions of Capper/Carrollsburg, the stadium, and Florida Rock) in December's Hill Rag (page 5 of this PDF).

 

(UPDATED to fix address for Nov. 28 meeting) ANC 6D and the Southwest Neighborhood Assembly are holding a Baseball Stadium Update meeting on Monday, Nov. 28 at 7 pm at St. Matthew's Lutheran Church, 222 M Street SW. They are working to get city officials, Sports Commission officials, and others to attend to discuss "traffic, construction, zoning and other important issues." This was announced at the ANC 6D meeting on Nov. 14. Also at that meeting, the ANC voted to support the Florida Rock project; as for Capper / Carrollsburg, while the ANC voted to support the alley closings/street openings portion of the zoning application, they are for now opposed to the second-stage PUD. ANC Commissioner Williams is trying to organize a special meeting to hear more from the community so that another vote can be taken by the commission before the zoning deadline (former residents are complaining they are having problems with the developers about their potential return to the development).
More posts: ANC News, Capper, Florida Rock, Nationals Park, Traffic Issues, zoning
 

I will admit that I have tended to focus on news west of 7th Street, SE, ignoring the small additional sliver of Near Southeast south of the freeway between 7th and the 11th Street Bridge. (Some would argue that the land east of the 11th Street Bridge, including Maritime Plaza, is also part of Near Southeast, but I'm putting my foot down and deeming that Hill East.) But I promise now to add those few blocks to their rightful place on this site (if not on the map at right, at least not yet!). So, with that, a few items:
· The land at 801 Virginia Avenue (the southeast corner of the 8th and Virginia intersection, currently occupied by an auto repair shop and a gas station), was bought in early August for $2.5 million. According to August's Voice of the Hill (see page 5) (along with a correction on page 3 in its September issue), the developer is planning a four-story building with 15 residential units, with retail spaces along 8th Street. ANC 6B has approved the project along to the Historic Preservation Review board. More as I get it.
· The DC Department of Transportation has scheduled two public meetings on the East Washington Traffic Relief Program, a six-year, $263-million project to build four ramps on the east side of the 11th Street Bridge, two of which will provide direct connections between the 11th Street Bridge and the Anacostia Freeway. The meetings, Oct. 5 and Oct. 6, are both "scoping" meetings to begin preparing an Environmental Impact Statement for the project (the Notice of Intent to prepare the EIS was published in the Sept. 13 Federal Register).  See the EIS project web site (which was just launched sometime in the last 12 hours, it was "coming soon" when I first looked this morning!) for more information. This March 26, 2005 press release from the mayor's office gives more details on the project, as does the Middle Anacostia River Crossings Transportation Study site.
More posts: 11th Street Bridges, 801va, 8th Street, Traffic Issues
 

Speaking of bridges and environmental impact statements, I've only now stumbled across both the South Capitol Street Bridge Study web site and SouthCapitolEIS.com,  two efforts that ran concurrently over the last six months as part of the project to replace the Frederick Douglass Bridge. (I've only been checking the DDOT Public Meetings page on a daily basis for weeks now, sure would have been nice if one of their announcements had ever mentioned these URLs!) Both sites have lots of links and information, and should be required bookmarks for anyone interested in the replacement (and most likely realignment) of the South Capitol Street Bridge. Materials from the summer meetings of these projects are available, as is a mammoth, crash-your-computer PDF showing two of the proposed alternate alignments. I believe these two stages are pretty much over, so I'll try to keep you posted on the next phases.

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

The DC Department of Transportation will hold a public meeting regarding Early Right of Way Acquisitions on the South Capitol Street Bridge Alignment Study Project, Tuesday, August 16, 2005, at 10 am, at the Reeves Municipal Center at 14th and U, NW. According to the press release, the "purpose of this meeting is to provide the landowners and other interested persons with an opportunity to receive information about the project, DDOT's Early Acquisition Program, and to submit written and verbal comments." The realignment of the South Capitol Street (Frederick Douglass) Bridge is part of the huge plans for the redesign and redevelopment of South Capitol Street, as detailed in both the New Vision for South Capitol Street (NCPC), and DDOT's South Capitol Gateway Corridor and Anacostia Access Study. (UPDATE: Bumped up as a reminder.)

More posts: Douglass Bridge, Traffic Issues
 

The mammoth transportation bill that's making its way through Congress contains a few nuggets for Near Southeast--$123 million for the rehabilitation of the South Capitol Street Bridge, and $17.6 million for upgrading of the 11th Street Bridge and construction of new ramps for access to M Street, SE.

More posts: 11th Street Bridges, Douglass Bridge, Traffic Issues
 

The National Capital Planning Commission has released its New Vision for South Capitol Street, a beautiful brochure giving more details on how they foresee the redevelopment of South Capitol Street into a grand boulevard, from a new Frederick Douglass Bridge northward to Virginia Avenue. As always, visions and realities are two very different things, but there is strong backing from the federal government (mainly in the persona of Maryland Rep. Steny Hoyer), and now with the baseball stadium poised to be built along South Capitol, the interest in making this street into a showcase approach to the Capitol is considerably heightened. But don't look for any of it to happen next week, there's a 10- to 15-year timeline on it all....

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

Federal and local leaders have signed an agreement to pledge to rebuild the Frederick Douglass Bridge and to redevelop the South Capitol Street corridor as a grand gateway into the District from Prince George's County (more). Does it actually mean anything? Hope so!

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 
251 Posts:
Go to Page: 1 | ... 20 | 21 | 22 | 23 | 24 | 25 | 26
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.