Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Traffic Issues
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


251 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 26
Search JDLand Blog Posts by Date or Category

It's the annual, non-April Fool's update to remind folks that the Navy Yard-Union Station Circulator route begins its summer hours today. Through September, the red buses will run Monday through Friday from 6 am to 9 pm, and on and on Saturdays from 7 am to 9 pm.
Plus, as in past years, the buses will have extended hours for Nats games: For every game beginning at 4:05 pm or later, the buses will run until midnight. For Sunday home games, this route will run from 10 am to 10 pm.
This route also stops at the Eastern Market station on the Orange and Blue lines, and also runs along Barracks Row, so your $1 gives you a lot of options.
Comments (2)
More posts: Traffic Issues
 

From DDOT:
"As part of the 11th Street Bridge Project, the District Department of Transportation (DDOT) will close 11th Street SE, between M Street and K Street, from 7 a.m. on Saturday, March 22, to 11 p.m. on Sunday, March 23, 2014. This closure will also take effect the following weekend, from 7 a.m. on Saturday, March 29, to 11 p.m. on Sunday, March 30, 2014. The 11th Street SE access ramp to westbound I-695 (Southeast/Southwest Freeway) will also be closed during these two closures. The work will allow crews to begin demolition of the existing inbound bridge structure over 11th Street. " See the map for details.
Comments (0)
More posts: 11th Street Bridges, Traffic Issues
 

On Sunday I ventured out for a long overdue survey of the 11th Street Bridges project. While I know that pictures of ramps and flyovers don't elicit quite the swooning that images of new residential buildings do, the changes at street level and above since this project began in 2009 are as wide-ranging as anything else in the area short of probably Nationals Park. Here's what I saw (click on photos to embiggen):
On 8th Street just north of Virginia Avenue, the new ramp to outbound I-695 (aka the 11th Street freeway bridge) looks pretty far along, as seen at right. This ramp has an "early spring" projected opening, and it doesn't appear to be too in danger of missing that.
The lanes to the left of this new freeway entrance carry the outbound I-695 traffic, while the ramp to the right that used to lead to the old outbound flyover and bridge will now be the new exit from the freeway to an intersection at 11th Street SE north of L. You can also see this new exit ramp from 8th and Virginia (below left), running next the footprint of the now-demolished old entrance ramp. The 11th Street interchange still has a ways to go (below right), but is projected to open in early summer.
I also finally checked out 12th Street, which no longer lives quite so deeply in the shadow of the ramp from the old inbound 11th Street Bridge to M Street. The in-water piers of the old bridge are still standing, as you see at left, but otherwise the ramp's footprint has been cleared. (I kind of miss the staircase, though.)
The 12th and O intersection still needs a lot of love even with the embankment gone, but it's at least somewhat less apocalyptic now (below left)--and it will be seeing more traffic with M Street east of 13th temporarily closed, which has also moved the Anacostia Riverwalk Trail route onto its "real" Water Street path. Meanwhile, one block to the north, there's about to be an actual intersection with N Street (below right), allowing for traffic to access 11th Street in either direction without having to go up to M. (You can see the rest of the new 12th and N angles and how they've changed, too.)
So many of the new 11th Street Bridges movements are finished--the bridges themselves, the new inbound and outbound flyovers, the two-way traffic up 11th Street from the local bridge, and the on- and off-ramps at M Street. This also means that the centipede-like old inbound flyover seen in the two photos below can now be demolished like three others before it (the RFK ramps and the outbound flyover), for one final change to the skyline above 11th Street.
It's pretty hard to pull together these changes into a single page, so if you really want to get a feeling for the progression over the past four-plus years, I'd dive into these parts of my photo archive:
* 12th and M, especially looking north and northwest;
* 11th and N, looking north and south; and
I know, it's exhausting. But for someone enamored of striking before-and-after shots, it's a goldmine.
Comments (11)
More posts: 11th Street Bridges, photos, Southeast Blvd., Traffic Issues
 

DDOT has announced that on (or about) March 7, inbound traffic on I-695 to the Southeast Freeway will shift over to its final alignment, onto the new flyover built as part of the 11th Street Bridges project.
This shift will also provide a third lane of inbound traffic, and clear the way for demolition of the old, now-somewhat-rickety-feeling, inbound flyover. (Yay!)
In order to complete the final prep for this switchover, the exit ramp from I-695 to M Street will be closed on Thursday, March 6, at 10 pm, until approximately 5 am Friday. If you need to get to M Street from 295, you can get off at the 11th Street local exits and proceed to M that way.
This alignment switch is the second in a series of traffic changes related to the 11th Street Bridges project on tap for the early part of 2014. Next in line should be the revamped ramp from 8th Street SE onto the eastbound freeway, sometime this spring, followed in the summer by the new ramp from the eastbound freeway down to 11th Street north of L.
However, as is so often the case, progess comes with a price: "Motorists seeking access to 8th Street SE and the Marine Barracks area from the inbound 11th Street Freeway Bridge (westbound I-695) will be detoured to M Street SE, then to 11th Street SE to I Street SE." See the map above for this detour route.
On the graphic released a few weeks ago about the 2014 openings (above right), there appears to eventually be a return of access from westbound I-695 to I Street SE, but is not part of the announced schedule. (It also appears to use the closed-for-security-reasons ramp that bisects the Marine Barracks on I Street, and I'm wondering about the machinations to reopen that.) There will eventually be other movements to and from 11th Street as part of the still-under-discussion Southeast Blvd.
Comments (4)
More posts: 11th Street Bridges, Traffic Issues
 

* CSX NEAR: The Kojo Nnamdi Show hosted on Monday a roundtable on the Virginia Avenue Tunnel project, with David Garber and others. You can listen to it here.
* CSX FAR: Heads will explode, but I will pass along that CSX's J&L Tunnel Modification project has recently won two engineering awards. What is this tunnel? "The J&L Tunnel was constructed in the 1880s as part of the Pittsburgh & Lake Erie Railroad to allow trains to run beneath the former J&L Steel Company’s Pittsburgh Works Southside facility." And what was the project? CSX "increased the vertical clearance of a 130-year-old tunnel running through Pittsburgh’s SouthSide Works, a mixed-use residential and commercial development. CSX worked closely with public officials, local businesses and residents to minimize noise and disruption during construction. Upon completion of the tunnel work, CSX restored trees and plantings, and invested in landscaping improvements that left the overlying Tunnel Park a more usable recreational space."
* HAMPTON: The building permit has been approved for the 168-room Hampton Inn just north of Nats Park. (The shoring permit was approved back in December.)
* THE MASTER PLAN: DDOT has officially released its update to the Anacostia Waterfront Initiative Master Plan. This covers projects like the new Douglass Bridge and South Capitol Street makeover, the Barney Circle/Southeast Boulevard redo, the M Street SE/SW transportation study, the Anacostia Riverwalk Trail, and all other manner of projects and studies for infrastructure updates and improvements in the area. (Though, at 194 pages, maybe the Executive Summary will be a good place to start.) If I were a good blogger, I'd write a big in-depth entry about this, but, well, we know the answer to that these days....
* POLITICS: The Post grades the recent Southwest/Near Southeast Mayoral Forum, and the Hill Rag looks closely at the Ward 6 council race. Primary day is now less than a month away, on April 1. And note that tonight (March 4) there is a forum with the candiates at 7 pm at Westminster Church at 400 I St. SW, and there will be a Ward 6 candidate forum on education issues on Thursday, March 6, at 6:30 pm at Stuart-Hobson Middle School.
* DE-W'ED: Have you noticed that the Curly Ws are gone from various freeway signs? Here's why.
* PASTOR MILLS: Unfortunately, a sad piece of news to mention is that Karen Mills, pastor of the St. Paul's church at 4th and I SE, passed away on Feb. 21. I only met her a few times, but she was a very welcoming and pleasant presence, and condolences go out to her family, friends, and members of the church.
Anything else catching peoples' eyes?
 

DDOT is announcing that the new eastbound/outbound flyover from the Southeast Freeway to the 11th Street Bridge (I-695) is opening Feb. 7, i.e., today, i.e., Any Minute Now. Maybe it's already open!
If anyone would like to weigh in with further details, please do.
UPDATE: It sounds like it is indeed already open. I will have to schedule a joy ride this weekend.
Comments (9)
More posts: 11th Street Bridges, Traffic Issues
 

Cleaning out the pending file:
* DIG IT: The shoring and sheeting permit has now been approved for the residential building currently known by the spiffy moniker of Parcel N at the Yards, which means that the parking lot on the southwest corner of 4th and Tingey should start being dug up any time now (beyond just the DC Water digging up that's been going on for a while). This building will have 327 residential units and 20,000 square feet of ground-floor retail when completed in either late 2015 or early 2016.
* MMMM, BEER: Bluejacket is going to start offering tours of its brewery, beginning Jan. 31. The offerings range from a free tour with one complimentary taste of a Bluejacket brew to a $22 "tasting tour" to the $75 "Beer and Food Experience Tour." See the web site for more details.
* A REVIEW: Alas, the Post's Tom Sietsema did not have particularly good things to say about the food at the Arsenal (but he did like Bluejacket's brewed offerings).
* ANC VACANCY: The Board of Elections has officially certified the vacancy in 6D02 after Ed Kaminski's resignation, and the wheels are now turning for a special election. Petitions may be picked up at the BOE and circulated until Feb. 3, with challenges to those petitions allowed through Feb. 12. If more than one person successfully makes it through the petition process, an election will be held, most likely at 6D's March business meeting. If only one candidate qualifies, that person automatically fills the vacancy. So, if you're itching to be an ANC commissioner and you live in Capitol Hill Tower, or Velocity, or 909 New Jersey, or across the way in the northeastern sections of Southwest, here's your chance.
* SOUTHEAST BLVD: ANC 6B's Brian Flahaven has posted the commission's draft comments on DDOT's initial plans for the rebuild of Barney Circle and Southeast Blvd. Spoiler: "The committee recommended a number of clarifying changes to the comments including the addition of an opening sentence that conveys the commission’s opposition to the design concepts presented to the community on Nov. 21, 2013. The committee also wanted to make it clear that other stakeholders besides DDOT need to be brought into the project discussion."
 

I've had some e-mails of late from readers eyeing the progress on the new outbound flyover from the eastbound Southeast Freeway toward the 11th Street freeway bridge (aka I-695). The flyover appears to be pretty close to opening, but as of now there's no official date-in-stone from the project folks.
However, they were nice enough to pass along this graphic showing the estimated dates that four of the ramps now under construction will open. And, because I know some of you just can't bring yourselves to click, I'll summarize:
* The new eastbound/outbound flyover from the freeway is expected to open sometime in the next six weeks or so.
* A third lane westbound/inbound is scheduled to open in the March/April timeframe.
* The new/replacement ramp from 8th Street onto the eastbound/outbound freeway has an "early spring" anticipated opening date.
* The ramp that will offer a new exit from the eastbound freeway directly onto to 11th Street just north of L is expected to open this summer.
And, while I invite you to check out my 11th Street Bridges project page for the background on this on-going project, I admit that I haven't been over there to take pictures since, ahem, October (it's cold! I'm busy! I'm tired! I'm lazy!). But now I will probably be guilted into it.
Comments (4)
More posts: 11th Street Bridges, Traffic Issues
 

DDOT is hosting another public meeting tonight (Thursday, Nov. 21) on its project to both turn the old sunken portion of the Southeast Freeway into "Southeast Blvd." and also to remake Barney Circle.
This meeting will "seek community feedback on updated design concepts" that "illustrate ways to transform the Southeast Freeway between 11th Street SE and Barney Circle into a boulevard that integrates with adjacent neighborhoods and provides new connections to the Anacostia River."
The meeting is from 6:30 to 8:30 pm at Payne Elementary School, 1445 C St., SE.
This is a study that I'm actually pretty interested in, but I missed the previous meeting and ensuing discussions owing to my Annus Horribilis, so I can't give you a whole lot of details on how it has all gone up to now. The project web site has the basics, including the presentation slides from the first meeting, and ANC commissioner Kirsten Oldenburg posted 6B's first comments on the concepts back in April.
Some of the work on Southeast Blvd. has of course already begun, with tons and tons of dirt already having filled in the former underpass beneath 11th Street, so that traffic coming from the freeway will be able to exit to a signalized intersection at 11th. But little work has been done east of 11th, which is good since it's this study that is to determine exactly what that work should be.
Also, if you can't get enough of public meetings on transportation issues, you can also mark your calendar for an upcoming DDOT meeting regarding updates to the Anacostia Waterfront Initiative Transportation Master Plan. It's on Dec. 12 from 6:30 to 8:30 pm at the Capitol Skyline Hotel at South Capitol and I streets, SW.
Comments (4)
More posts: meetings, Southeast Blvd., Traffic Issues
 

With the news that the window coverings had come off of the Osteria Morini space in the Lumber Shed, I went racing down there with hopes of pressing my camera up against all that glass to get some photos of the opening-any-minute-now restaurant from Chef Michael White. Alas, I arrived during training, and so was THWARTED (because I'm way too shy to have just gone ahead and taken the up-close shots with 40 people staring at me).
I did get at least a couple of surveillance-type shots from a respectable distance, which I posted in a new photo gallery you should check out, but here's a preview:
The restaurant is expected to open next week, perhaps the 19th or the 20th, but at this point we know it will open when it opens.
The photo gallery also has a few other fun shots from the other projects currently under construction (residential buildings Twelve12, Park Chelsea and Toll Brothers's River Parc), such as the turret at 4th and M getting quite a makeover:
Plus, the Park Chelsea has gotten new signage, but more interesting is the outlines now forming of the new stretch of I Street that will run between 2nd and New Jersey when it opens (probably not any sooner than spring 2014):
But just go ahead and check out the full gallery.
Also, while they aren't terribly showy just yet, I have built two more of what I call my Expanded Photo Archives for both the Park Chelsea and River Parc projects, to bring together more before-and-afters from a wider/farther array of angles than I usually display on the project pages. (Yep, I'm partying like it's 2007.)
 
251 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 26
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.