Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Traffic Issues
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


251 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 26
Search JDLand Blog Posts by Date or Category

Just a reminder that Thursday night (Jan. 12) is the first public meeting for DDOT's M Street SE/SW Transportation Study, from 6:30 pm to 8:30 pm at Westminster Presbyterian Church at 400 I St., SW.
As the meeting announcement says, "The purpose of the public meeting is to provide an overview of the transportation study, outline the study process/schedule and gather public feedback. Following a brief presentation, attendees will be asked to help identify concerns and issues on maps of the study area and also via a brief survey."
It isn't just about the six lanes on M Street, either: the study area goes from the Southeast/Southwest Freeway south to the Anacostia River and Washington Channel, from 12th Street SE all the way to 14th Street SW.
So, if you think there should be fewer lanes, more lanes, less parking, more parking, more bike lanes, fewer bike lanes, more pedestrian-friendly changes, fewer pedestrian-friendly changes, or just like watching people with wildly divergent views all trying to get their position to be the "right" one, come on down.
(You can also read my post on the last M Street traffic meeting, back in 2010, though note it was not part of this current official nine-month study by DDOT.)
Comments (0)
More posts: Pedestrian/Cycling Issues, meetings, M Street, Traffic Issues
 

ANC 6D has sent around (and posted! yay!) the agenda for its January meeting, scheduled for Monday, Jan. 9 at 7 pm at 1100 4th St., SW in DCRA's second-floor meeting room.
The Near Southeast items of interest could mostly be looked at as sneak previews, or perhaps as items that could be missed if you are better able to fit other upcoming meetings into your calendar (especially, if, say, you were looking for an escape hatch because you'd kinda rather be watching the BCS championship):
* There's a M Street SE/SW Transportation Study agenda item, in advance of the DDOT public meeting on the study coming three days later, on Jan. 12;
* There's an update on Capitol Riverfront BID doings, in advance of the BID's annual meeting three days later, on Jan. 12; and
* There's the application for historic landmark status for the DC Water main pumping station, which will be heard by the Historic Preservation Review Board at its January 26 meeting.
There's also an update on the ANC 6D redistricting outcome, various Southwest-related items (including the big Maryland Avenue SW Draft Plan, and whatnot. And, since it's the first meeting of the new year, there will also be the election of commission officers.
 

Just sent out by DDOT:
"The District Department of Transportation (DDOT) will hold the first in a series of public information meetings for the M Street SE/SW Transportation Study from 6:30 to 8 p.m. on Thursday, January 12, 2012 at the Westminster Presbyterian Church, 400 I Street SW.
"The nine-month study, being conducted as part of the larger Anacostia Waterfront Initiative, seeks to identify current and future transportation issues and possible mitigation strategies along the M Street SE/SW Corridor and Southwest/Southeast Waterfront areas from 12th Street SE west to 14th Street SW and from the Southwest/Southeast Freeway south to the Anacostia River/Washington Channel.
"The purpose of the public meeting is to provide an overview of the transportation study, outline the study process/schedule and gather public feedback."
Comments (6)
More posts: Pedestrian/Cycling Issues, meetings, M Street, Traffic Issues
 

The agenda for Monday's ANC 6D December meeting is now available (and actually posted on their web site, too!). My hopes for a pre-holiday pass from this have been dashed, though, since there are a number of Near Southeast items on the agenda:
* There is an application pending for landmark designation for the historic 1905 DC Water Main Pumping Station, to which I'm sure we all say, "What do you mean it isn't already designated?"
* CSX will give an update on the Virginia Avenue Tunnel NEPA process. (Or you can just read my summary of last week's public scoping meeting.)
* The new partners in the RiverFront/Florida Rock project will be giving a presentation on their new zoning filing, which I'll be writing more on shortly.
* There's also going to be an update(?) on the long-desired Maine Avenue/M Street comprehensive traffic study, which we haven't heard much about in a while.
You can check the agenda for the other items. (it's a pretty long lineup. Yay. As always, December seems to be the ZOMG WE HAVE TO DO SOMETHING portion of the year, not just for ANCs but throughout the development/bureaucratic sphere.) The meeting is at 7 pm in the DCRA offices on the 2nd floor of 1100 4th St., SW.
 

Just sent out by DDOT: "Today the District Department of Transportation (DDOT) announced the start of land acquisition and preliminary design work for the South Capitol Street Project, which includes replacement of the current Frederick Douglass Memorial Bridge. [...] While the Record of Decision (ROD) is still pending, the Federal Highway Administration signed the project's Final Environmental Impact Statement (FEIS) following the requisite 30-day public comment period that ended in May."
I'm posting quickly, so I shall now crib unabashedly from my post on the Final EIS, from back in April:
If you are interested in this subject, there is more verbiage and documentation accompanying the plans than you could ever dream of. (Traffic studies! Environmental consequences! Technical reports!) And I've written a lot about the process, which began more than a decade ago with other studies before the EIS got underway. And I'm sure there will be posts on other blogs delving more specifically into portions of the plans. But, since most people probably want to know "what does this mean for me?", you can see this graphic (from the 224-MB chapter 2 of the FEIS) giving a quick overview of what changes are planned along South Capitol Street if the final EIS is signed off on (and, more importantly, if funding is secured). The short version, for the west side of the Anacostia:
* Add "pedestrian amenities" and enhance the streetcape along South Capitol north of I and along New Jersey Avenue SE north of the freeway.
* Replace the existing ramp to the freeway from South Capitol and I with an at-grade intersection. (This would be a left turn onto a ramp to the freeway from under the freeway, near the current Nats HH economy parking lot.)
* Bring New Jersey Avenue SE back to a 160-foot full right-of-way, and add streetscape enhancements.
* "Reconstruct South Capitol Street as an urban boulevard." This means bringing M Street up to an "at-grade" intersection (no more tunnel), and would include new signalized at-grade intersections to allow traffic to cross South Capitol on K and L streets. (M Street would also get reconstructed between the Halfs [SE and SW].) The section of South Capitol north of M would have the same streetscape that the south portion received during its 2007/08 makeover, with wide sidewalks and a tree-lined median.
* Build a traffic oval at South Capitol, Potomac, Q, as the gateway to a new arched bascule-design Douglass Bridge that would have wide "multi-use trails" (i.e., sidewalks!) in both directions. The existing bridge would be demolished, after the new bridge is built somewhat downriver of the current location.
The Executive Summary (220 MB PDF) gives a good overview of the FEIS and preferred alternative (as it should!), but I also suggest wandering through the Chapter 2: Alternatives section, especially if you came to the neighborhood or JDLand after 2008 and didn't get to follow along during the EIS process, or if you're interested in the additional plans for east of the river, which I'm going to leave to others to discuss. My previous posts on all of this may be of interest as well. If you're wanting to see some of the earlier studies referenced in the FEIS, there are links to them at the top of my South Capitol Street project page.
How much would this all cost? The preferred alternative is priced in this final EIS at $806 million in FY 2014 dollars. (New bridges are expensive, you know.) Note that nothing in today's statement from DDOT says anything about funding, or a construction timeline.
You can also check my South Capitol Street and South Capitol Street Bridge page for all the info about the plans, along with my scores of posts over the past few years.
Comments (6)
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

It's been so long since I've written about this that I forgot it was even still in progress, but DDOT has announced two public meetings to present the "preferred alternative" and the Final Environmental Impact Statement for the South Capitol Street Corridor, first on April 26 at Amidon-Bowen Elementary School in SW and then two days later at Savoy Elementary School in SE. This is the long-term study of how to improve South Capitol Street on both sides of the Anacostia River to better address safety, traffic, pedestrian, and streetscape issues, and includes the construction of a new Frederick Douglass Bridge.
If you are interested in this subject, there is more verbiage and documentation accompanying the plans than you could ever dream of. (Traffic studies! Environmental consequences! Technical reports!) And I've written a lot about the process, which began more than a decade ago with other studies before the EIS got underway. And I'm sure there will be posts on other blogs delving more specifically into portions of the plans. But, since most people probably want to know "what does this mean for me?", you can see this graphic (from the 224-MB chapter 2 of the FEIS) giving a quick overview of what changes are planned along South Capitol Street if the final EIS is signed off on (and, more importantly, if funding is secured). The short version, for the west side of the Anacostia:
* Add "pedestrian amenities" and enhance the streetcape along South Capitol north of I and along New Jersey Avenue SE north of the freeway.
* Replace the existing ramp to the freeway from South Capitol and I with an at-grade intersection. (This would be a left turn onto a ramp to the freeway from under the freeway, near the current Nats HH economy parking lot.)
* Bring New Jersey Avenue SE back to a 160-foot full right-of-way, and add streetscape enhancements.
* "Reconstruct South Capitol Street as an urban boulevard." This means bringing M Street up to an "at-grade" intersection (no more tunnel), and would include new signalized at-grade intersections to allow traffic to cross South Capitol on K and L streets. (M Street would also get reconstructed between the Halfs [SE and SW].) The section of South Capitol north of M would have the same streetscape that the south portion received during its 2007/08 makeover, with wide sidewalks and a tree-lined median.
* Build a traffic oval at South Capitol, Potomac, Q, as the gateway to a new arched bascule-design Douglass Bridge that would have wide "multi-use trails" (i.e., sidewalks!) in both directions. The existing bridge would be demolished, after the new bridge is built somewhat downriver of the current location.
The Executive Summary (220 MB PDF) gives a good overview of the FEIS and preferred alternative (as it should!), but I also suggest wandering through the Chapter 2: Alternatives section, especially if you came to the neighborhood or JDLand after 2008 and didn't get to follow along during the EIS process, or if you're interested in the additional plans for east of the river, which I'm going to leave to others to discuss. My previous posts on all of this may be of interest as well. If you're wanting to see some of the earlier studies referenced in the FEIS, there are links to them at the top of my South Capitol Street project page.
How much would this all cost? The preferred alternative is priced in this final EIS at $806 million (not billion! yeesh) in FY 2014 dollars. (New bridges are expensive, you know.)
(I know that this is a very quick overview of a big study and plan, but there will be plenty of time to talk more about it, especially with the upcoming public meetings.)
 

Last missive from Monday's ANC 6D meeting..:
* It's apparently going to be "Neighborhood Day" at Nationals Park on Saturday, April 16. The Nationals said in a press release on Monday that residents will be able to purchase discounted tickets, but you apparently have to be in the know to find the nationals.com/neighborhood ticket sales link. (ANC commissioners got their free tickets for Saturday handed out at the meeting, since they'll be introduced on the field before the game.)
* With a unanimous 7-0 vote, the commission passed a motion authored by David Garber to request that DDOT fund a "comprehensive" traffic study of the M Street corridor and its neighboring streets in both Southeast and Southwest. Much of the discussion ended up centering around the wording of the motion (as is so often the case), with much concern about whether Maine Avenue should be specifically mentioned, especially given that the developers of the new Southwest Waterfront will be undertaking their own traffic study along Maine and Water Street. Commissioner Andy Litsky wondered about the traffic study in Southeast that the Capitol Riverfront BID is looking to fund, and Michael Stevens of the BID said that they would support a "holistic" approach to combining the various studies already done or on the boards (including the one CSX has apparently completed to look at the impact of their planned construction along Virginia Avenue, plus the reports done for the 11th Street Bridges EIS and the in-progress 14th Street Bridges EIS).
The motion was then amended to say that the ANC supports directing DDOT funds "to conduct a comprehensive traffic study and plan for the M Street SE/SW corridor and its feeder and surrounding streets and that all other area studies be integrated for DDOT's review in order to produce a comprehensive study, and that ANC 6D urgently supports the subsequent design process and implementation of a 'complete streets' plan to decrease the speed and volume of automobile traffic, and increase multi-modal transportation safety and efficiency as neighborhoods in 6D continue to evolve and develop."
(If you want to know more about the concept of Complete Streets and how it might inform a redesign of M Street, you can read my report on last year's public meeting held by Tommy Wells to start an "initial dialog" on the subject.)
* The commission also voted 7-0 to support the Pacers Home Run Classic 10K race, to be run on Saturday, June 18. Original plans to start and end the race at the Yards Park ran into some issues with the city's Emergency Management folks not wanting the race to run by the DC Water/WASA plant (and there was no explanation beyond that). So the race will now start and end at Half and N, across from the ballpark, then circle the ballpark down to South Capitol and Potomac before crossing the Douglass Bridge, running along Anacostia Drive in Anacostia Park to the skating pavilion, then doubling back. It's expected there will be 2,000 runners for the 8 am race. (Next year they expect to be able to start and end at the Yards Park and use the new floating bridge to Teague Park to get to Potomac Avenue and the Douglass Bridge.)
* In liquor license matters, it was reported to the commission that Das Bullpen did end up needing to get a new liquor license separate from that of The Bullpen 1.0, and that a new voluntary agreement was written up as well. This was all apparently done very hurredly, on the Tuesday before Opening Day, in order for ABRA to approve the new license on Wednesday in time for Opening Day on Thursday (though as we know Das Bullpen didn't open that day anyway). There's a full hearing on the license scheduled for May 31. If you haven't followed the Twitter flurry, Das Bullpen opened Tuesday (April 13) for the Nats/Phillies game.
* Also on the alcohol front, apparently both Harry's Reserve and Cornercopia are inquiring as to the possibility of the sale of "singles," in their cases to be the sorts of higher-end European beers that typically come in 20 oz or larger bottles. Coralee Farlee, who chairs the 6D ABC subcommittee, asked for some guidance as to whether the ANC is wanting to continue to not consider any exceptions for single sales, as has been the practice. David Garber and other commissioners expressed their support for the higher-end type of sales, and Andy Litsky said that 6D never really had the "singles" problem that lead the H Street NE corridor to ban those sales. Chairman Ron McBee instructed Farlee to check how other ANCs are handling the issue (apparently 6B allows sales of the 20-oz. bottles?), with an eye toward reexamining 6D's stance.
 

There's nothing I like more when fighting a cold than to think about an upcoming ANC meeting, but these are the sorts of sacrifices I make for you people. Miraculously, ANC 6D has already posted the agenda for Monday's meeting, which is chock-full of Near Southeast-related items and is coincidentally being held in Southeast this time around, at the Courtyard by Marriott at New Jersey and L. Up for discussions and/or votes:
* The Market Deli historic landmark application, which will get a vote from the ANC as to whether or not to support it (and of course we know that at least one 6D commissioner will be voting for it!). The hearing in front of the Historic Preservation Review Board is scheduled for April 28.
* A presentation on the zoning request to allow Forest City to "temporarily" include office space in the Lumber Shed building in the Yards Park. I've written about this Lumber Shed request before, and in fact Forest City did a information presentation on this at last month's ANC meeting, but I was hoping to get copies of the new pretty renderings of the buildings before writing anything, and that never happened, and I knew they'd be back again in order to have a vote on whether the ANC will support the zoning request, so.... I promise to write about it this time.
* A resolution on a long-term traffic and transportation study for M Street SE and SW, also to include a "complete streets" plan, according to David Garber. This would appear to be wider in scope than the transporation study discussed in the draft Performance Parking report I wrote about recently that seemed to only cover the east side of South Capitol, but I imagine all will be clarified at the meeting.
* It turns out that Das Bullpen needs a new separate liquor license rather than operating on the Bullpen 1.0 license, so that's on the agenda as well. The hearing for that is scheduled for May 31, but the ANC will be voting on a "stipulated license," which I believe means that the bar could operate while waiting on the full license hearing. (And no, I haven't heard when they might be opening, though it wouldn't be before the next Nats home game, on April 12 vs. the Phillies.)
* And the BID is looking for support for the "Home Run Classic Pacers 10K Race" on June 18, that appears to start and/or end at the Yards Park and which I would guess (but don't know for sure) would involve some street closings.
The meeting begins at 7 pm, and does allow for short audience questions/statements on any agenda item where a vote will be taken, just in case there's any particular agenda item that people may feel strongly about one way or the other. (And all of this assumes that a government shutdown wouldn't affect an ANC meeting? Anyone?)
 

Michael Perkins at GGW got his hands on the draft version DDOT's 2010 Ballpark District Performance Parking Report, and while I'll leave it to him to handle the in-depth discussion of pricing and meter use in Near Southeast as well as other neighborhoods, there are a few action items in the report that might be of general interest (you should read all 31 pages if you want the nitty-gritty).
Now, this is a draft report, but assuming it becomes final...:
Revenues from the parking program have been able to provide $812,100 for "non-automotive transportation improvements" in 2011, which will include a new Capital Bikeshare location at the Yards Park and $135,000 for a new fence along New Jersey Avenue by the railroad tracks (presumably it won't hide the "Water Pylons" public art coming to the freeway underpass). There will also be two or three other new bikeshare stations somewhere in the Ballpark District parking zones (Near Southeast, Southwest, and southern Capitol Hill), but those haven't been announced.
There will also be a $70,000 grant to partially fund a Capitol Riverfront BID Transportation Study, which the page 25 of the report says will happen during this fiscal year and will look at:
* The need for additional traffic signals and stop signs based on pedestrian and vehicular patterns (and recent accidents);
* Neighborhood traffic circulation patterns including one way street circulation and freeway access and turning movements onto the freeway frontage roads;
* How the CSX tunnel reconstruction will impact traffic flow and SE/SW freeway access/egress;
* Existing and future parking demand and the proposed parking supply to meet that demand;
* On street parking strategies and supply for commercial, residential and visitor populations;
* Optimum Circulator routes and hours of operation;
* Recommended routes for bike lanes that tie into the Riverfront Trail system;
* The optimum route for a streetcar line in the M Street right of way and how it would service the Buzzard Point subdistrict; and
* How M Street is designed and works as a multi-modal transit corridor while exhibiting a high quality of design in the public realm.
Gosh, I'm just not sure if residents will be interested in any of these! If perchance a reader or two might have an idea or data point for the above items, feel free to discuss in the comments.
Note that this study doesn't quite seem to match the overarching Near Southeast/Southwest combined traffic study that got some discussion late last year, but perhaps there's more going on than what's mentioned in the DDOT report.
DDOT is also proposing that non-gameday parking rates at the multispace meters between South Capitol and 2nd Streets from the freeway to M Street go up to $6 for three hours (first hour $1.50, second hour $2.50, third hour $3). Plus, the boundaries of the parking zone will move eastward to 11th St. SE from 9th St.
By the way, if you have a fab idea for how some of the proceeds from the parking revenue can be spent on the aforementioned non-automotive transportation improvements, you can submit a written proposal to DDOT (further information on page 26 of the report). And if you want background on how the Performance Parking Pilot came into existence back in 2008, my Stadium Parking page can help with that.
 

I know one of my big complaints about St. Patrick's Day festivities has always been that there just aren't enough civic forums included. But that's not the case this year!
* This is late notice (my bad), but on Thursday night (March 17) DC Water (aka WASA) is holding a Ward 6 Town Hall Meeting to talk about all manner of water- and sewer-related issues. Both Tommy Wells and George Hawkins (general manager of DC Water) will be there, and no doubt one of the topics of discussion will be the multi-billion-dollar Clean Rivers Project to fix the combined sewer overflows that result in sewage emptying into the Anacostia River. I have done a wonderful job of avoiding writing about this project, and I will do so for a while longer, except to note that it will eventually mean construction work along M Street east of 9th and along Tingey Street, but not before next spring (and continuing until 2017), so I have a little more time to get with the program. The town hall is from 6:30 to 8 pm at Watkins Elementary, 420 12th St. SE.
* Unfortunately, the DC Water town hall is scheduled at the exact same time as the "First Semi-Annual DC Circulator Public Forum," which is being held right in the neighborhood at the Courtyard by Marriott at New Jersey and L SE, and which is expected to include a discussion of a possible expansion of service on the Union Station-Navy Yard line, perhaps by expanding hours of operation to 9 pm Monday-Saturday during baseball season. (There is, however, no truth to the rumor that the route is going to be renamed the Dubliner-Molly Malone's line.)
Comments (1)
More posts: circulator, meetings, Traffic Issues, DC Water (WASA)
 
251 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 26
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.