Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Traffic Issues
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


251 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 26
Search JDLand Blog Posts by Date or Category

Apologies for the late notice, but tonight ANC 6D is having an "presentation meeting", to break out the issues that people and organizations want to bring in front of the ANC but which don't require an official vote. This is an attempt to shorten the monthly business meetings, which can run for hours and kill numerous brain cells of all in attendance. The meeting will be at 25 N Street, SW, at either 7:00 or 7:30 pm (now confirmed). Items on tonight's agenda include WASA talking about lead pipe replacement in the neighborhood and an update on Arena Stage construction and schedule.
There's also going to be a presentation by a group called the Coalition of Concerned Citizens of Eastern Washington, who are raising questions about the various road and bridge projects planned along the Anacostia and who have been contacting city officials over the past few months requesting that a new "traffic mobility study" be undertaken. (Here's their flyer and a copy of a letter to Mayor Fenty they sent back in August.) I imagine this group will also be interested in the Nov. 16 hearing before the City Council's Committee on Public Works and the Environment on "Major Bridge Construction Projects in the District".
More posts: 11th Street Bridges, ANC News, Traffic Issues
 

DDOT has cancelled plans to close two outbound lanes on the Douglass Bridge from 7 am to 5 pm on Saturday and Sunday (Nov. 3 and 4). So now you can take a weekend jaunt and buzz the new South Capitol Street and its renovated bridge without backups!
More posts: Douglass Bridge, Traffic Issues
 

The Post's Dr. Gridlock has a blog entry today about the work that continues on the Douglass Bridge: "Out of sight below the deck, in a big box-like area of pale gray steel, workers are riveting new bolts into place while either refurbishing or replacing aging parts of the structure across the Anacostia River. Aside from making the whole thing look better as a southern gateway to central Washington, the work will extend the life of the bridge until it can be replaced by a new structure the city plans to build right nearby." DDOT hopes to wrap up the work on the bridge, and on the streetscape improvements to South Capitol, Potomac, First, and I, by February.
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

Another few days' worth of lane closures on the Douglass Bridge this weekend, this time the outbound/southbound lanes, according to a DDOT press release. The outbound lanes of the bridge will be closed beginning on Friday, October 12 at 9 p.m. until as late as Monday, October 15 at 4 a.m. They're working on the swing span area in the middle of the bridge, repairing the steel framing. And apparently they're expecting the work on the bridge and the accompanying streetscape improvements to South Capitol Street to continue through February.
UPDATED to add link to press release.
More posts: Douglass Bridge, Traffic Issues
 

Oct 5, 2007 6:10 PM
Here's some late Friday news for you: the 11th Street Bridges Environmental Impact Statement has been completed, and a preferred plan for the reconfiguration of the bridges has been chosen, at an estimated price of $465 million, taking an estimated five years to complete. No start date has been announced.
You can read the summary, check out the Preferred Alternative and the other alternatives, plow through the entire thing at once (36 MB), or pick and choose the sections you want to read. When even the summary is 24 pages long, it's hard to give a quick description of what is being recommended, but here's my best shot:
* There will be two new bridges built on exactly the alignments of the existing two bridges, allowing the use of the existing piers but requiring their widening to allow for wider bridges. Two new ramps will be built on the east side of the Anacostia River, providing access at last to the northbound Anacostia Freeway from the Southeast/Southwest Freeway and to the freeway from the southbound Anacostia Freeway. One of the two bridges would be dedicated to freeway traffic, and the other to local traffic, with the total number of **freeway*** lanes unchanged, but with four new local lanes and with added paths for bicyclists and pedestrians, as well as "accommodations for transit," such as the proposed light rail system.
As for what would happen to the interchange with the bridge in Near Southeast, it's hard to digest, but this is what I'm seeing by looking at the diagrams in the Alternatives section (here's a Google Maps satellite view of the current bridges, which you might need):
* The current on/off ramps at N Street would be moved to M Street (see page 15), with local traffic and paths to and from Anacostia being routed on the western of the two bridge spans (officially known as the Officer Welsh Bridge), and traffic bound for the Anacostia Freeway routed onto the 8-lane eastern span. This also means that the local traffic coming north from Anacostia would be routed along a newly two-way portion of 11th Street up to M.
* The exit ramp now between Ninth and 10th streets would be moved to Ninth Street.
* There would also be a new entrance to the westbound freeway from 11th Street (perhaps taking some of the pressure off the Third Street ramp?).
(In a separate project, the existing Southeast/Southwest freeway between 11th Street and Barney Circle is apparently going to be downgraded to a new Southeast Freeway Boulevard, which would be accessed by exiting the freeway and going across 11th Street at-grade. As part of this, the sneaky little route to Pennsylvania Avenue from 9th Street and Virginia Avenue would be removed, too.)
As for the impact of the reconfigured bridges on the boathouses nestled between them on the west side of the river, the EIS says that "it has been determined that construction of any of the build alternatives, including the Preferred Alternative, will not require the whole or partial demolition of either of the two ACBA buildings." Boathouse operations would have to be relocated during construction, but the documents state that DDOT is committed to maintaining the operations during this time, having agreed to provide temporary structures on a Washington Gas-owned space a few hundred yards to the north. (See Section 7.3 for more about the boathouse impact.)
Finally, the document states that the bridges project will not impact the Virginia Avenue Park at 9th and Virginia.
I doubt anyone is still reading at this point, so I'm going to quit while behind and hope that all sorts of media outlets give some real coverage, and take me off the hook. If you're at all interested in this, especially in the impacts east of the river that I haven't addressed, I suggest browsing the entire document. You'd be amazed how much detail is in there.
There's now a public comments period, through November 20. See the EIS web site for more about the entire study process.
If you're not real familiar with this area of Near Southeast, visit my East M Street page for photos and links.
UPDATE, 10/11: I erred in this above item when stating that the total number of lanes would be unchanged from the current configuration; having misread the EIS wording that referred to the number of freeway lanes being unchanged. The two spans currently have eight freeway lanes, which will be the case with the new bridge; but those eight lanes will be carried on a widened version of the upstream span, and the downstream span will carry four local lanes.
More posts: 11th Street Bridges, Boathouse Row, Traffic Issues
 

Sep 25, 2007 11:40 AM
While the worst of the Douglass Bridge Extreme Makeover pain is now over, there's still some work to be done, and this weekend the inbound lanes of the Douglass Bridge will be closed starting Friday, Sept. 29 at 9 pm, until as late as Monday, Oct. 1 at 4 am. Here's the DDOT press release with details. Quote: "The second phase of construction includes additional work on the swing span area of the bridge and streetscape improvements along South Capitol Street. Upgrades include new environmentally sensitive lighting, pedestrian access improvements such as handicap ramps, pedestrian traffic signals and new sidewalks. Resurfacing work will also take place this weekend on the inbound lanes on South Capitol Street up to N Street."
More posts: Douglass Bridge, Traffic Issues
 

Aug 30, 2007 9:11 AM
As expected, the Douglass Bridge did indeed reopen overnight, at approximately 4 am, and the traffic cameras at South Capitol and M and at the Suitland Parkway show vehicles moving across newly laid pavement. Channel 4 has a piece on the reopening, as does Channel 5, Channel 9, WAMU (audio only) and WTOP (though it's mostly an updated version of their it's-going-to-open piece from yesterday). And since I missed them yesterday, here's Channel 7 and Channel 4's it's-going-to-open stories.
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

Aug 29, 2007 3:48 PM
This afternoon there was a ceremony marking the pending reopening of the Douglass/South Capitol Street Bridge, with remarks by Mayor Fenty, DC Delegate Norton, Council Member Barry, and others. I'll post photos in a little while, but did want to get the news bullets out first:
* They will start opening the bridge around midnight tonight, but it will take a little while to coordinate the opening of the various intersections on each side of the bridge.
* For the first week or so, no left turns will be allowed through the intersection at South Capitol and Potomac, and the intersection stoplights will be a constant flashing yellow. They want people to get used to the new configuration at its most basic before adding in some of the new "options."
* The intersections with O and P streets probably won't be opened for another week or so as well.
* Work on the medians and sidewalks on South Capitol Street, the railings on the bridge, and other improvements will continue for a few more weeks. The emphasis was on getting the roadway back open, but there is still additional work to be done that can be handled while traffic flows. (But watch for some lane closures during off-hours.)
* (Added) The streetscape improvements along South Capitol won't be completely finished until spring, when the stadium is ready to open.
* Everyone still wants a new bridge. This is stopgap work while the city tries to get the funding for a completely new bridge. Congresswoman Norton remarked that the city's performance in getting this project done early and on budget has not gone unnoticed on Capitol Hill as she works to get the new bridge fully funded.
UPDATE: I've now added a bunch of photos of the new South Capitol-and-Potomac intersection to my Douglass Bridge Extreme Makeover page, and there's also additional photos in the Extended Archive. (Didn't take any new shots further up South Capitol; I'll wait until the streetscape improvements are farther along.) And here's the DDOT announcement of tonight's reopening.
UPATE II: I'll put the links to news coverage of the ceremony here. (There will be a new post tonight/tomorrow for the actual opening.) Here's WTOP's piece. And Channel 9.

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

Word is out that the Douglass Bridge will be reopened early Thursday morning. More soon.
UPDATE: Here is the media advisory from DDOT; there will be a ceremony with invited speakers on Wednesday afternoon, and then sometime during the overnight hours, before Thursday morning rush, the bridge will be opened to vehicles and pedestrians. It was originally scheduled to reopen Sept. 6, so for those of you counting at home, that means the work will have been completed a week ahead of schedule.
UPDATE II: And here come the torrent of news stories: WashPost, WTOP, Channel 7, Channel 9, Channel 4, Examiner. With more to come, I'm sure.
If you're wandering through here from a web search about the bridge, be sure to check out my Douglass Bridge Extreme Makeover page to see photos from before and during the bridge's rehabilitation.
More posts: Douglass Bridge, Traffic Issues
 

With Saturday being one of those glorious clear days, I of course raced out with camera to make the rounds. 70/100 I, Onyx on First, and 100 M continue to rise, so the usual photos of those are now posted. The Stadium Construction Gallery is updated with views of the ballpark's northern and western vistas, which are changing markedly thanks to the work being done on the parking garages and on South Capitol Street in conjunction with the Douglass Bridge work.
And while you might think it's pretty much become rote for me to watch these changes, I must admit that when I scurried very briefly out into the middle of South Capitol Street at P Street to grab a shot or two, I was just about overcome by what it's all starting to look like. The holes are cut for the new South Capitol median, the curbs are being put in place for the new wider sidewalks, and the stadium's fake-limestone (I'm sorry, "precast concrete") exterior just pops in the late afternoon sun. Check my Douglass Bridge Extreme Makeover page photos that try to capture the new vista, along with a new Expanded Project Archive that I built if you can't get enough of looking at the before-and-afters of this stretch of road.
UPDATE: Oops, forgot to add the obligatory link to all the new photos on one page. There are also some additional here-and-there shots of spots that needed fresh photos.
More posts: 100 M, 70/100 I, jpi, Onyx, Douglass Bridge, Nationals Park, Traffic Issues
 
251 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 26
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.