Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Traffic Issues
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


251 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 26
Search JDLand Blog Posts by Date or Category

The Post's Dr. Gridlock has a blog entry today about the Maryland Transit Administration's plans for how MTA commuter buses will be diverted during the two-month shutdown of the Frederick Douglass/South Capitol Street Bridge that begins on July 6. Quoting: "MTA says that after listening to passengers, it has decided to bring some of its routes into the Branch Avenue and Suitland Metrorail stations for those who wish to transfer to the subway, but continue in and out of dowtown Washington for the other riders willing to tough it out through the congestion. (The buses will be stuck in the same congestion as the cars.)" See the entry for specifics on each bus route. Metro's bus route changes were announced a few weeks ago. (And thanks for the link, Dr. G!)
More posts: Douglass Bridge, Traffic Issues
 

This morning DDOT had a big press briefing about the plans for the coming Douglass Bridge "Extreme Makeover"; there was a gaggle of media in attendance, so I imagine there will be lots of play on TV tonight and in tomorrow's papers, so in the interest of time (mine, not yours), I'm going to hit the high points right now and wait for the reports from the big players to roll in for additional detail.
*The bridge will be shut down on July 6 (after the July 4 holiday). As soon as it's closed, crews will be on site beginning the demolition of the viaduct from Potomac Avenue northward, using "big shears" (DDOT's description) to drop it down. At the same time, the existing South Capitol Street will be ripped up, with infrastsructure and utility work done, and with the streetscape improvements started as well, which will include new "globe" lighting, a median with trees, etc. (Incidentally, by spring 2008 there will also be some sprucing up of the M Street overpass, with the chainlink fences removed and new historic iron railings installed.)
* It is expected that the 580 feet of the bridge from the Anacostia River to Potomac Avenue will begin to be lowered on July 20. They are going to put jacks under the bridge, cut the existing columns, and then lower it down. They should sell tickets for this part.
* The bridge itself will see its roadway milled, and the existing rails and chainlink fences replaced with a new special fancier railing; this railing will be affixed to the outside edge of the bridge, allowing the sidewalks on both sides of the bridge to be widened. (The bridge has already gotten a new paint job, have you noticed?)
* DDOT is creating an additional lane on I-295 between the Suitland Parkway and South Capitol Street to help improve the traffic flow.
* The closure of the bridge is planned for 60 days; however, the contractor (Corman) can receive up to $1 million in incentives if the work is finished sooner.
There are some new before-and-after renderings of what the approach to Potomac Avenue will look like, and I've added those to my Douglass Bridge makeover page, along with some photos taken on a barge tour today beneath the bridge. (You get to see the osprey nests!)
DDOT has also produced a spiffy video about the plans for the bridge (as well as information about a new Douglass Bridge, which is a few years and $300 million away from now); when they post it on their site, I'll link to it (UPDATED: now online). You'll probably see portions of it in tonight's media coverage. And just to warn you, a certain Near Southeast blogger puts in a very brief appearance, but don't let that prevent you from watching.
I'll update this entry as the day goes on with other media coverage.
UPDATE I: .... such as Dr. Gridlock's posting on the briefing, discussing the commuting impact of the closure. And the DDOT press release.
UPDATE II: And WTOP. And NBC. And ABC. But not a lot of news in any of them.
UPDATE III: Here's the Post and the Examiner.
UPDATE, 6/11: And another Examiner piece, focusing a bit more on the eventual new bridge. (But I wish their headline writer had correctly spelled "South Capit*ol*.")

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

I gave you the short-and-sweet update yesterday on the progress at the Nationals ballpark, but if you want the real nitty-gritty of all aspects of the project, here's the 10-page Monthly Report submitted by the DC Sports and Entertainment Commission to the City Council on May 14 (posted on Councilmember David Catania's ballpark page). It describes the current state of the schedule, budget, procurement, design, construction, coordination, and public outreach. For example, you can learn from it that approximately 65% of the stadium's structural steel and concrete is now in place, as well as 58% of the precast concrete. Typical daily manpower on the site in April? 432 workers.
One piece of development-type news in the report: the DCSEC is "drafting a request for proposals for the sale of the First Street retail development rights as a means to offset any hazardous material cleanup costs in excess of the budgeted amount and to provide the non-program retail required by the Zoning Commission final order while remaining in conformance with the Council cost cap legislation."
Also, as I've mentioned in other posts, it's expected that the draft Transportation Operations and Parking Plan will be released sometime in June.
But, if you're interested in the state of, say, the sand filters or the service level slab-on-grade concrete, this is the document for you.
UPDATED because the original headline made it sound like the DCSEC *might* report, as opposed to this being their report for the month of May. Oops.

More posts: parking, Nationals Park, Traffic Issues
 

From DDOT, a reminder that the last weekend closure of the outbound/southbound lanes of the Douglass Bridge (i.e., the South Capitol Street Bridge) is on tap, starting at 10 pm Friday June 1 and reopening sometime before the Monday June 4 afternoon rush hour. Of course, in a few weeks we'll all be dreaming of the days of mere weekend closures, when the bridge is closed in both directions for all of July and August for its Extreme Makeover, when "the bridge's elevated northern approach will be lowered to become an at-grade roadway with a new intersection at South Capitol Street and Potomac Avenue. Additional improvements will occur such as paving and painting the entire bridge. Ultimately, nearly three blocks of elevated roadway--which currently act as a barrier to access across South Capitol Street--will be removed and replaced with at-grade intersections that will help knit the neighborhood together."
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

For those of you who like to drive the loop around the stadium site to check out the latest progress, be advised that you can no longer go will often find the road closed north from Potomac Avenue on the mini-South Capitol Street that runs on the east side of the viaduct (pictures here); it's been closed as prep work gets underway for the lowering of the Douglass Bridge starting in July. The work now starting on the new Nationals office building that will run along the southern end of South Capitol Street (see my stadium renderings page for drawings) has spilled out into that access road from time to time over the past week or sol. If you don't make that drive yourself and are hoping for an update to my Stadium Construction Gallery, I'm somewhat hamstrung by the overcast weather this weekend (which makes for pretty icky photos), so unless there's a break in the cloud cover it may possibly be a few days before I add a new batch of shots.
Speaking of the bridge work, on June 7 DDOT is having a press briefing on the project, which they are now calling an "Extreme Makeover" -- hmmmm, I think I said that first ;-). The briefing will discuss traffic detours, construction plans and schedule, commuting solutions (such as Bridge Bucks), and the additional improvements to South Capitol Street that are coming. In other words, soon we'll finally get the details on how this is all going to shake out.
UPDATE: Apologies for the mix-up in the comments above about the street closure; it's open today, when no work is going on at the stadium site. And, just to repay you for that boo-boo, I went out and took pictures even though the sky is not bright blue; will probably have them posted tomorrow.

More posts: South Capitol St., Douglass Bridge, Nationals Park, Traffic Issues
 

I mentioned this in my preview of Thursday's WMATA board meeting, but then missed it in my summary of what happened, so we'll throw it over to the Post: "Fares on four Metrobus routes that will be detoured in July and August, when District officials will close the South Capitol Street Bridge for a major construction project, will be temporarily reduced, the Metro board said.The fare on the A9 route will go from $1.25 to 75 cents, and the express bus fare on the P17, P19 and W13 routes will drop from $3 to $1.25 during construction. The routes will temporarily end at Metrorail stations on the Green Line to help buses and commuters avoid traffic detoured by the bridge closing. The A9 (South Capitol Street Line) will end at the Anacostia station, and the P17, P19 (Oxon Hill-Fort Washington Line) and W13 (Bock Road Line) routes will end at the Southern Avenue Metrorail station."
The Post piece also briefly mentions the vote to move the Southeastern Bus Garage to DC Village, and you can read my entry from yesterday for more detail on how exactly the debate went, and also for links to various documents about the move. There was no word today that I've heard as to whether the city had reached a deal on moving the shelter beds currently at DC Village--remember, if that doesn't happen by Thursday May 31, the boards' approval vote of the move and the various next steps does not take effect. And you can listen to the archived audiocast of the meeting if you're especially interested.

More posts: Metro/WMATA, South Capitol St., Douglass Bridge, Traffic Issues
 

A couple weeks back I posted about DDOT's new "Bridge Bucks" program, which offers $50 per month toward transit fares and vanpool fees for people who will be affected by this summer's Extreme Makeover: Frederick Douglass Bridge. DDOT sent out a press release yesterday saying that the program has now launched, and you can visit the Bridge Bucks site for more details. Or, as I said then, avoid it all and just take a nice eight-week summer vacation; you could spend it camping at 4th and L.
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

On Thursday the WMATA board has on its agenda the approval of series of recommendations to continue moving forward on the plan to relocate the Southeastern Bus Garage from its current spot at Half and M to DC Village. The recommendations are the same as what came out of the Planning and Real Estate Subcommittee earlier this month to hold a public hearing on the project, advertise the Phase 1 construction contract, negotiate with the city to aquire the DC Village property, apply for a Federal bus facility grant, and authorize the sale of the garage and its parking lot (presumably to Monument Realty, though I've yet to see any official announcement that Monument was the source of the unsolicited offer in April for the property). The plan would then be to come back to the board in September with a land transaction agreement to be executed, and a construction contract to be awarded. As I've mentioned previously, WMATA is very much wanting to be out of the Half and M garage before the Nationals ballpark opens in March 2008. In addition to the documents for Thursday's meeting, the background documents from the May 11 subcommittee meeting also have lots of good detail on the proposed move, as do my last few entries on the subject.
And also on the agenda (good thing I scrolled down!) is a request to approve temporary changes in the routes and fares for the A9, P17, P19, and W13 bus lines during July and August's Extreme Makeover: Frederick Douglass Bridge. If you ride these buses, be sure to read what's being proposed, but the gist is that because the detour route's expected congestion would impact bus schedules, WMATA is proposing to temporarily end those bus routes at subway stations on the east side of the river, but reducing the fares to help offset the higher cost of riding the subway.
If you're really interested in this meeting, WMATA provides live streaming and archived audiocasts of its meetings. (Yay!)

 

Tonight the Zoning Commission approved with a 3-0-2 vote Case 07-08, the request to allow temporary surface parking lots (lasting no more than five years) on a number of parcels within walking distance of the Nationals ballpark. (I considered this hearing so important that I took off my fuzzy slippers and actually ventured to Judiciary Square to attend in person rather than watching Ye Olde Webcast.) Commissioners Mitten, Hood, and Turnbull voted for the action; Commissioners Parsons and Jeffries did not attend.
The Office of Planning, while making clear in its report that it strongly encourages the use of mass transit and other alternatives to cars and would not normally support surface parking lots, testified that these lots and the 3,775 maximum spaces they would provide (see my Stadium Parking page for a map that shows their locations) will help to alleviate the short-term shortage of available parking during the next few years until new developments with additional underground parking in the area are completed.
It was requested that the case be approved immediately, on an emergency basis, with the explanation that the sooner the Nationals know where their lots are going to be, the better they can tailor the assignments of season-ticket holders to different lots based on where they are arriving from. (It was also emphasized numerous times that the parking lots are just one part of the overall traffic planning for the stadium.)
The main opposition to the amendment came from residents of Southwest, and ANC 6D commissioner Andy Litsky testified that the neighborhoods were not so much concerned with the lots themselves, but how traffic would be directed to the lots, with the bulk of the consternation focused on 4th, P, and I Streets, SW, which the residents consider to be local roads but which were mentioned by a traffic consultant at the March public meeting as being likely routes to the possible lots in Buzzards Point. There was also a surprising moment when a representative of Pepco testified that there's no way that Square 665 at Buzzards Point can be considered an option for a surface lot, because there's a substation still in operation on it. The Office of Planning explained that this text amendment was merely identifying "potential" lots, and that it's assumed that not all squares will ever actually have surface parking on them, and in fact the presentation slides by traffic consultant Gorove Slade from the March public meeting indicated that most likely no parking would be created at Buzzards Point. Ken Laden of DDOT then testified that his agency has never considered 4th, P, and I in SW to be important streets, because the vast majority of the lot locations are on the east side of South Capitol Street and that DDOT is trying to keep the bulk of the traffic in Near Southeast (where there are currently very few residential developments).
This gave the zoning commissioners an opening they were looking for, and they crafted a pretty sweet way to take the residents' concerns into account: because each surface parking lot will still have to go through the normal DC approval process for a Certificate of Occupancy (environmental review, DDOT review, etc.), they ordered that the associated traffic plans submitted with the COO may not include directing traffic to/from the lots down local streets (specifically mentioning 4th, P, and I). With that, the amendment was approved on an emergency basis. Andy Litsky said he was "pleased" with the decision.
As for the overall traffic management plan, apparently DDOT was not real happy with the first draft that they received on April 30 from the DC Sports and Entertainment Commission (Laden said it wasn't "user-friendly") and are expecting a new draft in early June, which will then be put out for public comment (and I'm guessing there will be plenty of that). It will include the same sort of on-street parking restrictions that have been used around RFK, where no one can park during games without a special residential parking permit, although exactly how far the boundaries of that restricted area will reach is still under discussion.
And DDOT's Laden also said that an agreement is close to being reached that would add a Circulator bus line from Union Station to the new US Capitol Visitors' Center to the Capitol South and Navy Yard Metro stations, which would give direct access to the red, orange, and blue lines without having to change trains at L'Enfant Plaza.
Above all, it was repeated numerous times that this will be a work-in-progress, that the plans will be tweaked and massaged as the planners see what works and what doesn't. In other words, while traffic will undoubtedly be a nightmare on Opening Day 2008, that doesn't mean it will always be that way. And, oh yeah, take Metro.
For additional background, here's my post from when the zoning case first came up. And be sure to read the Office of Planning's report, Andy Litsky's testimony, and the presentation slides from the March public meeting. And all my other Stadium Parking and Transporation documents and links.
UPDATE: Here's the Post piece on the hearing.

More posts: ANC News, circulator, parking, Nationals Park, Traffic Issues, zoning
 

UPDATE: This planned closure for this weekend has been cancelled because of the rotten weather forecast. Original entry:
Once again, the outbound side of the Douglass Bridge will be closed this weekend; here's the scoop from DDOT: "Improvements to the Frederick Douglass Memorial Bridge (sometimes referred to as the South Capitol Street Bridge) will continue this weekend, as crews continue repairs on the southbound or outbound lanes. Following the evening rush hour on Friday, May 18 at 10 pm, the District Department of Transportation (DDOT) will temporarily close the southbound (outbound) lanes on the Douglass Bridge. All lanes will be reopened in time for the Monday (May 21) evening rush hour. Outbound bridge drivers will be directed to follow signed detours to I-395 South across the 11th Street Bridge to I-295 South. Drivers also may consider taking either New York Avenue or Benning Road as alternate routes." This is of course all in preparation for The Mother of All Bridge Closures, coming in July and August when both sides of the bridge will be shut down to demolish the northern 800 feet of the viaduct, and lower the exit of the bridge so that it reaches ground level at Potomac Avenue.

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 
251 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 26
Search JDLand Blog Posts by Date or Category