Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Traffic Issues
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


251 Blog Posts Since 2003
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 26
Search JDLand Blog Posts by Date or Category

UPDATE: This planned closure for this weekend has been cancelled because of the rotten weather forecast. Original entry:
Once again, the outbound side of the Douglass Bridge will be closed this weekend; here's the scoop from DDOT: "Improvements to the Frederick Douglass Memorial Bridge (sometimes referred to as the South Capitol Street Bridge) will continue this weekend, as crews continue repairs on the southbound or outbound lanes. Following the evening rush hour on Friday, May 18 at 10 pm, the District Department of Transportation (DDOT) will temporarily close the southbound (outbound) lanes on the Douglass Bridge. All lanes will be reopened in time for the Monday (May 21) evening rush hour. Outbound bridge drivers will be directed to follow signed detours to I-395 South across the 11th Street Bridge to I-295 South. Drivers also may consider taking either New York Avenue or Benning Road as alternate routes." This is of course all in preparation for The Mother of All Bridge Closures, coming in July and August when both sides of the bridge will be shut down to demolish the northern 800 feet of the viaduct, and lower the exit of the bridge so that it reaches ground level at Potomac Avenue.

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

New from DDOT: "The District Department of Transportation (DDOT) today started an innovative program to spur greater use of transit and ridesharing by commuters affected by this summer's repairs of the Frederick Douglass Memorial Bridge (sometimes referred to as the South Capitol Street Bridge). The program will help commuters affected by DDOT's planned July-August closure of the bridge. Modeled after a successful similar effort carried out by the Woodrow Wilson Bridge Project, DDOT's 'Bridge Bucks' program will provide $50 per month toward transit fares and vanpool fees to encourage commuters to switch out of their cars and into an alternative travel mode." There's a Bridge Bucks web page with more information. Or you could just take that eight-week summer vacation!
UPDATE, May 8: Here's a WTOP piece on the Bridge Bucks plan, and The Post's Dr. Gridlock (Bob Thomson) is addressing the program and the concerns from commuters about the plan to close the bridge in his Get There blog today.
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

From DDOT: "Improvements to the Frederick Douglass Memorial Bridge (sometimes referred to as the South Capitol Street Bridge) will continue this weekend, as crews begin repairs on the southbound or outbound lanes. Previous recent weekend closures affected inbound lanes only. (View a map of weekend detours) Following the evening rush hour on Friday, May 4 at 10 pm, the District Department of Transportation (DDOT) will temporarily close the southbound (outbound) lanes on the Douglass Bridge. All lanes will be reopened in time for the Monday (May 7) evening rush hour. Outbound bridge drivers will be directed to follow signed detours to I-395 South across the 11th Street Bridge to I-295 South. Drivers also may consider taking either New York Avenue or Benning Road as alternate routes. Following this weekend's closures, the outbound lanes on the Douglass Bridge again are scheduled to close on the weekends of May 19 and June 2. Closure of the bridge's outbound lanes follows six previous weekends of closing the bridge's northbound or inbound lanes. The off-peak weekend closures and repairs are needed to prepare for a major rehabilitation that will take place on the Frederick Douglass Bridge in July and August--at which time all lanes on the bridge will be closed in both directions."
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

A reminder that the inbound lanes of the Frederick Douglass Bridge will again be closed this weekend (from 10 am Friday, April 20 until before the Monday, April 23 morning rush hour). In May and June, the weekend closures will be shifted to the outbound lanes. And, of course, in July and August, the bridge will be shut down completely for Extreme Makeover: South Capitol Street, aka the demolition of the northern end of the bridge to allow for the bridge to arrive at ground level at Potomac Avenue.
Also, see my previous entry about various Earth Day-related activities around Near Southeast and the Anacostia River. Alas, my calendar has an unmoveable commitment for Saturday, otherwise I was all ready to make the Canal Park cleanup a JDLand meet-and-greet. But don't let that stop you from participating; and be sure to ask the organizers if you can help them move the school buses (heh heh).
More posts: Canal Park, South Capitol St., Douglass Bridge, Traffic Issues
 

Just a reminder, for the next two weekends (April 13-16 and April 20-23), the inbound/northbound lanes of the Frederick Douglass Bridge will once again be closed between 10 am Friday and 4 am Monday. Read DDOT's initial release on the project or my last entry on it for the hows and the whys, and see my page with additional info and photos on the lowering planned for the northern end of the bridge over the summer.

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

With thanks again to DDOT, I now have all of the slide presentations from last week's public meeting on the stadium Transportation Operations and Parking Plan (TOPP). The new ones are the WMATA Slides on Navy Yard Station Upgrade and the DDOT Slides on Douglass Bridge/Other Improvements. The documents I posted last week were the slides by Gorove/Slade describing about the TOPP; with maps and charts listing expected transit/auto/pedestrian traffic volume and flow; an FAQ on parking, traffic, and other issues for Southwest and Near Southeast residents; an FAQ on the Douglass Bridge improvements going on over the next few months; and DDOT's display boards with information on the plans for the South Capitol Street corridor and other regional traffic issues.
Repeating what I said last week: If you live in Southwest, or Near Southeast, or Capitol Hill, or Anacostia, or even Prince George's County, or if you're a baseball fan planning to come to the games, I suggest taking a close look at these.... (Some of them are kind of big files, be patient if they take a moment to load.) Comments can be sent to the the DC Sports and Entertainment Commission, and cc ANC 6D (office@anc6d.org) so that the ANC can track the feedback. And read my summary of the main bullet points from the meeting. Let's not all wait until March 2008 to suddenly figure out that there's a new baseball stadium at South Capitol and Potomac that has 40,000 fans trying to get there.

 

It was a tough call between swallowing a couple of bottles of hydrochloric acid or attending tonight's public meeting on the stadium's Transportation Operations and Parking Plan, but luckily for you my JDLand duties eventually won out. I'm hoping to get electronic versions of the slide presentations, so I'm going to just type up my notes for now, and hope that the details come later; besides, much of it will sound familiar to folks who read this blog regularly. There were presentations by DDOT and WMATA about their plans for the area, as a warm up for the discussion by traffic planners Gorove/Slade on the TOPP.
DDOT gave an overview of all of its near-term plans for Near Southeast--this includes the additional ramps to be added to the 11th Street Bridges, which already has funding and is moving at (bureaucratically speaking) lightning speed, and should be done by 2010. Then the planned improvements to South Capitol Street and the South Capitol Street Bridge were profiled, including this summer's festive demolition and lowering of the northern portion of the bridge. The current bridge itself will also be painted, and will get new lighting and pedestrian rails (more like the Pennsylvania Ave. bridge). Then there will be the streetscape improvements to South Capitol, Potomac, N, 1st, and I Streets, SE, all before Opening Day 2008, with resurfacing, new streetlights, curbs, etc. There will also be some small changes to the South Capitol and I intersection to try to improve the flow, although there are no current plans to expand the ramps to/from the freeway.
Next up was WMATA, giving a description of what's being done to expand the Navy Yard Metro station in advance of the throngs of baseball fans. The station's capacity is being upgraded to 15,000 customers per hour (the same as Stadium-Armory) from the current 5,000, turnstiles and Farecards machines will be moved to street-level, elevators will be added to the west entrance, and more, all while Monument Realty's 55 M Street office building is built on top of the station. The west entrance will be one-way outbound before games and one-way inbound afterwards, while the east entrance will remain two-way. Metro will also put in place the same plan of 9-13 extra trains after each game that they currently do for games at RFK, and that the system's recent receipt of nearly 190 new rail cars will also help increase capacity over the next 18 months. They are also looking at shuttles to other stations after games, and that the possibility exists that DDOT could expand the DC Circulator bus routes that currently end in SW to include the stadium area, with a route down M Street, up 8th, and over to Union Station, but that's not decided yet.
Gorove/Slade went through a lot of numbers, but I think in some ways didn't quite emphasize what the people attending wanted to hear most, which is that non-resident gameday street parking will be prohibited in basically all residential areas in Southwest and Near Southeast south of the freeway, and they'll be using the model that's been being refined in the Hill East neighborhood around RFK for the past few years (residents receive Event Parking permits to display, and also one guest parking permit per household). They estimate that for a sellout crowd 19,000 people will come via transit (16,000 through the Navy Yard station), 750 will arrive by charter buses, 400 by taxi, 3,400 on foot or bike, and 13,600 by car (in 4,700 vehicles). They indicated that the Nationals themselves are in charge of coordinating the parking negotiations with various sites, and a slide showed that the Nationals have identified about 5,200 parking spaces that can be available (well above the 4,700 vehicles anticipated to be coming to games). Only 185 of these spaces are in Southwest (between Half and South Capitol north of M); the rest are all in Near Southeast. While there are possibilities for parking in Buzzards Point, currently it appears the Nationals are not anticipating using that area for parking. No decision has been made yet on using the RFK parking lots and shuttle buses.
In terms of pedestrian flow at game time, many of the surrounding sidewalks are to be upgraded as part of DDOT's streetscape improvements. There will be traffic control officers at the major intersections, and Half Street SE south of M will be closed entirely to vehicle traffic, while some lanes on N will be closed; also there will be no parking at all on M Street or on 1st Street north of M on gamedays.
But what all the planners want is for people to come to games via public transit.
The questions from the audience centered mainly around the impact on the residential streets of Southwest and Capitol Hill, with great concerns about parking for visitors ("what if I'm having a party?") on game days. I imagine there will be more of the meetings, with more consternation, yet to come. And I also imagine that Opening Day 2008 will be rife with tales of traffic back-ups, transit snafus, and lost suburbanites unable to find their parking lots. And then the plans will be tweaked and re-tweaked, just as they have been around RFK for the past few years.
As I said, hopefully I'll have the slides and some other materials to pass along within the next few days. If you have concerns that you want to air, be sure to contact the DC Sports and Entertainment Commission, and cc ANC 6D (office@anc6d.org) so that the ANC can track the feedback.
UPDATE: See my entry with the slides from the meeting, now posted on my site.

More posts: ANC News, circulator, Metro/WMATA, parking, staddis, Nationals Park, Traffic Issues
 

From DDOT, a drill everyone should be getting familiar with: "As part of ongoing improvements to the Frederick Douglass Memorial Bridge (sometimes referred to as the South Capitol Street Bridge), the District Department of Transportation (DDOT) will continue bridge repairs this weekend, starting Friday, March 30. Following the morning rush hour this Friday, DDOT will temporarily close the inbound lanes on the Frederick Douglass Memorial Bridge. Inbound bridge drivers will be directed to follow signed detours on Interstate 295 North to the 11th Street Bridge - providing direct access into the District. The inbound lanes will be closed beginning on Friday, March 30 at 10 a.m. until as late as Monday, April 2 at 4 a.m. All lanes will be reopened in time for the Monday morning rush hour."
Why? (in case you're just joining us) "The off-peak closures and repairs are needed to prepare for a major rehabilitation that will take place on the Frederick Douglass Bridge in July and August - at which time all lanes on the bridge will be closed in both directions. [...] The one-direction-only weekend closures on the Frederick Douglass Memorial Bridge are necessary to allow workers to safely replace bridge expansion joints with new joints (joints allow a bridge to flex when temperature changes occur). Joint replacement work requires extended periods of uninterrupted work hours, as it involves removing existing joints from the concrete bridge deck, making necessary repairs, installing new joints and placing concrete to reconnect the existing bridge deck to the new joints. Under-the-bridge steel repair work and painting also will occur. The weekend closures and repair work, which are scheduled to conclude in early June 2007, also may require periodic single-lane closures during weekday non-peak travel times.
"During the July-August closure, the northernmost portion of the bridge will be lowered to become an at-grade roadway with a new intersection at South Capitol Street and Potomac Avenue. Nearly three blocks of elevated roadway - which currently act as a barrier to access across South Capitol Street - will be removed and replaced with at-grade intersections that will help knit the neighborhood together. Additional improvements will occur such as paving and painting the entire bridge."
See my Upcoming Events calendar for the planned closures from now through June.

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

The closure of the inbound lanes of the South Capitol Street/Frederick Douglass Bridge planned for this weekend has been postponed until next weekend (March 30-April 2) because of tomorrow's National Marathon, which has the bridge on its route.
More posts: Douglass Bridge, Traffic Issues
 

From DDOT: "As part of ongoing improvements to the Frederick Douglass Memorial Bridge (sometimes referred to as the South Capitol Street Bridge), the District Department of Transportation (DDOT) will continue bridge repairs this weekend, starting Friday, March 9. Following the morning rush hour this Friday, DDOT will temporarily close the northbound (inbound) lanes on the Frederick Douglass Memorial Bridge. Inbound bridge drivers will be directed to follow signed detours on Interstate 295 North to the 11th Street Bridge--providing direct access into the District. The northbound (inbound) lanes will be closed beginning on Friday, March 9 at 10 am until as late as Monday, March 12 at 4 am. All lanes will be reopened in time for the Monday morning rush hour." This work is part of the preparations for the planned demolition of the raised portion of South Capitol Street (north of Potomac Ave.) this summer.
More posts: Douglass Bridge, Traffic Issues
 
251 Posts:
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 26
Search JDLand Blog Posts by Date or Category