Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Parc Riverside Apts
See JDLand's Parc Riverside Apts Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


30 Blog Posts Since 2003
Go to Page: 1 | 2 | 3

I fear I am going to be run ragged by the scope of construction 'round these parts over the next few years. Fitbit tells me I took about 15,000 steps across two outings to snag this slew of photos, and I still didn't quite get everything I wanted. But let's see what's going on. (As always, click on any image to enlarge it, and then page through the slideshow of all of them).
At 1015 Half Street, the new CBS Radio space along L Street is moving along, with a ticker now hung on the building (below left) and the ground-floor studio space being built out (below right).
There's four holes in the ground in various stages of construction, though alas I missed getting pictures of the Arris apartment building at the Yards, which has reached ground level and so should be starting the showy part of its progress within the next few weeks. The Lofts at Capitol Quarter are about at ground level on the east end of their not-at-all-level footprint at 7th and L (left), while digging down down down continues at 800 New Jersey/Whole Foods (right). (The third one, the new 1111 New Jersey apartment project, isn't all that much of a hole just yet.)
(Speaking of 800 New Jersey, I noticed that the rebuilt-but-not-open H Street has had its asphalt laid and is now a good nine inches or more higher than where it meets 2nd Street. Preparation for that intersection and Virginia Avenue to be bumped up with the construction of the Virginia Avenue Tunnel?)
Getting close to topping out is the Hampton Inn at 1st and N (left). And, apropos of nothing (but needed here for layout purposes), a photo of the signage for the Subway Café at 20 M Street, which sounds to not be too long from opening.
And wrapping up the tour, here are the two buildings nearest to completion, the Parc Riverside at 1st and K (left) and the Park Chelsea on New Jersey Avenue (right), seen from one block to the south because it's So Freaking Big.
Now, everyone chime in and tell me what I missed.
If you want more photos of these projects (and who wouldn't?), just follow the links to the project pages.
 

The final installment of this week's Fence Peeking is a bit more haphazard. Let's start with looking on fences:
(Left) The new Parc Riverside signage has been hung along 1st Street by the sales trailer, though at least I have the River Parc signs recorded for posterity.
(Right) There's a bunch of new signage on the black fences along Half and N, presumably to at least in part draw attention away from the big hole in the ground behind them. One portion of the sign is a map of places to see things, eat food, drink beverages, and spend money, placed by the Capitol Riverfront BID. And it helpfully provides confirmation of the Unleashed by Petco coming to the Boilermaker Shops, and lets the cat out of the bag (ahem) that the pet hospital at Twelve12 will be a Banfield.
(Left) While we wait to see when Willie's is going to open, I did at least finally get a photo of the ready-to-go interior. (Yeah, yeah, the glass isn't technically a fence, but work with me here.)
(Right) Speaking of the spiffy new signage on the black fences across from the ballpark, I finally got an updated photo from on high of exactly what those fences are hiding. Let's imagine the potential interim uses while Jair Lynch and MacFarlane Partners decide what to build -- Urban campground? ATV track? Wildlife sanctuary?
 

It always seemd a little odd that Toll Brothers chose "River Parc" as the name for the new apartment building now in its final stages on the southwest corner of 1st and K--after all, there's been the mid-century goodness of the River Park townhouses and apartments over in Southwest since, well, the middle of the 20th century.
A few weeks ago, promotional signage went up across street from the new building, trumpeting RiverParc.com, and all systems seemed go. However, a reader passed along the news today of an e-mail from Toll Brothers announcing that River Parc is now the Parc Riverside.
River Parc/Parc Riverside, which according to the e-mail is now expected to deliver in November, does now have a functioning web site, with floorplans, lists of amenities (hey, everyone gets a garbage disposal!), and a few new renderings, but not the rental prices that I'm sure people would like to see at this point.
And now I shall go do a River Parc/Parc Riverside search-and-replace all across my site.
UPDATE: And, oops, I guess I should have included that the leasing office will open this coming Monday, Sept. 22.
Comments (9)
More posts: Development News, Parc Riverside Apts
 

Some photos from Saturday, taken before I melted into a puddle. (Anything over 80 degrees is kryptonite to me.) Click to enlarge and view as a photo gallery, if you're on a desktop machine, that is.
At Twelve12, where the first residents have begun moving in and Sweetgreen is now open, TaKorean looks to be making progress toward its own launch:
Up above TaKorean, VIDA Fitness's signs have gone up, with an opening looming probably in August.
(And, no photos, but 100 Montaditos at the Boilermaker Shops appears to finally have its building permit.)
Over at 1st and L, fence signage has sprouted for the River Parc apartment building (announcing a web site at, you guessed it, riverparc.com, though there's nothing pertinent there just yet). Plus the leasing trailer is now landscaped and outside the Akridge fence.
In grocery store news, I haven't yet posted photos of the fun artwork hanging on the historic brick wall outside of Harris Teeter's space at 4th and M (below left). And below right, the Whole Foods/800 New Jersey hole in the ground is indeed being dug. (Never say I withhold important information.) Teeter is expected to open this fall, while Whole Foods is not going to be seen before 2017.
But of course, the showiest action in the neighborhood continues to be the long (LONG) farewell to Spooky Building 213, which is starting to edge into How Can We Miss You If You Won't Go Away? territory. But the very south end of the structure began its march into the sunset this weekend, which means that, yes, the bat is about to vanish.
Finally, given the vagaries of both Mother Nature and the summer calendar, it's possible I might not get too many more shots of St. Matthew's church at New Jersey and L, with its raze permit now approved and demolition expected to get underway in the next couple of weeks to make way for 1111 New Jersey. So, maybe a final before-and-after, comparing the view eight years apart:
 

First off, you may have noticed that Saturday was a lovely day. The neighborhood's waterfront was most definitely in use:
Not far away, at the Yards' Parcel N, concrete has appeared in the large hole in the ground (left), meaning that the digging down is almost over, and the rising up should start before too long (its tower crane permit application was approved not too long ago). And in a totally different illustration of progress (right), the sales-trailer-to-be for the River Parc apartment project appears to now be in its proper place.
(I wanted to get a photograph of the outdoor patio signage at the soon-to-arrive Ice Cream Jubilee at the Lumber Shed, but the hordes standing in line on Saturday to get into the Jazz Fest completely blocked the view.)
I recorded the current state of the Florida Rock site across from the ballpark {insert Logan's Run reference here}, because the developers have now filed applications for both sheeting and building permits for the site's first-phase apartment building. This doesn't necessarily mean the project is close to getting started, but it deprives me of my snarky "they haven't even applied for their permits yet" response whenever someone mentions that it might get underway soon.
Finally, I present to you official evidence of the new 11th Street SE exit from the freeway, which I'm doing mainly as a mea culpa for not having gotten over there to photograph the ramp and environs, and to hopefully shame myself into action.
I also deserve additional shaming, or at least parallel shaming, for not yet documenting that the Southeast Freeway signage I have griped about for years has been fixed.
Comments (3)
More posts: Florida Rock, photos, Parc Riverside Apts, Traffic Issues, Arris/Parcel N/Yards
 

It was Saturday. It was beautiful. I wandered.
(Click on any of the photos and get a pop-up gallery of all of them--at least for non-mobile, non-RSS, non-email readers)
First, the obligatory Building 213 demolition shots. Let's compare the state of things on June 2 (left) and June 14 (right):
It's also fun to move back a block and get a better view from the east side, from November 2007 to this weekend. Where did all that sky come from?
And of course there's your basic Om Nom Nom shots:
There's also more peeks at other spots. First, I bring you the holes in the ground at the Hampton Inn on 1st Street (left) and the new residential building at Yards Parcel N (right):
Next, the still-papered over Sweetgreen at Twelve12, in advance of its opening this week, and a nose-pressed-up-against-the-dirty-window shot of the progress at the Harris Teeter in the same block, scheduled to open Oct. 1:
And I'll wrap up with the two photos below. At left, Twelve12's all-but-completed new service nestled between the new building and Building 202. And at right, on 1st south of K, the trailer that arrived this week, which is the one I posted about on Friday--and my guess that it is to be the leasing office for River Parc across the street has been confirmed.
The links to the project pages will show you these photos and many more....
 

Way back when, the Cohen Companies' plan on Square 699N was to build the Velocity condo building at 1st and L and then almost immediately start work on a twin residential building directly to the north.
Velocity went up, but the twin did not follow for nearly four years--after Cohen sold the empty lot to Toll Brothers, which is now building the River Parc apartment building on the site. And having a different developer build the twin has brought about a sticky situation.
Within recent days, Velocity residents have discovered that Toll's layout for the River Parc roof includes a wall that completely obscures the formerly expansive Capitol dome views from Velocity's roof deck.
This Facebook page shows the old view from Velocity's roof--and the photo below, provided by a resident, shows the new one.
In addition, the new building's design appears to place the building's 237 air conditioning units on the south side of the concrete wall, facing Velocity.
A recent e-mail to Velocity residents informed them that "[T]he ANC Commissioner, The Department of Consumer and Regulatory Affairs and the offices of Planning and Zoning have all been contacted and we are being told that all construction is being done in accordance with all plans, permits, zoning, and easements" and that "Every avenue is being pursued to somehow make this situation better for us." Alas, "[A]s long as they are within all legal parameters of their construction of this building, there is little we can do."
Capitol Dome views are a sticky wicket in the neighborhood, since almost all of the buildings that have already gone up stand to eventually lose their panoramic vistas as newer projects continue to fill in the empty spaces. (Just ask Nationals Park!)
The exceptions are 70/100 I (aka the Jefferson and Axiom) and the about-to-be-built 800 New Jersey, all of which border the freeway and so will likely keep their views pristine, as long as Capitol Hill north of the freeway doesn't suddenly start to allow 13 stories of construction.
But an impenetrable concrete wall certainly puts an exclamation point on the issue.
Comments (12)
More posts: Development News, Parc Riverside Apts, Velocity Condos
 

I've got a few more itty bitty items, so let's have another tidbit go-round:
* LOT LAYING: Enough people have written (and progress has been so slow) that I finally have to post that the work many of you are seeing on the Congressional Square block at 1st and I isn't the beginning of development there--the word is that the parking lot on the west side of the block is being extended eastward.
* PILE DRIVING: Pile driving has started at 800 New Jersey/Whole Foods, if your ears haven't already alerted you.
* TRAILER PLACING: A building permit just came through the pipeline for a temporary sales trailer at 1000 1st St. SE. The land. owned by Akridge, is unlikely to be about to see any large-scale construction, so might this instead be the beginnings of a leasing center for Toll's River Parc across the street?
* FERRY DOCKING: Following up on the ferry news from last week, I finally heard back from the office of Frank Principi in Woodbridge--it sounds like the routes and docking locations are still not 100 percent decided on. There is a stakeholder's group that will ultimately make the decisions, and it is meeting later this month to work on the project. So reports of a "Navy Yard" destination or a St. Elizabeth's destination or a Bolling destination appear to be premature.
 

Finally, the weather and the calendar cooperated, and I spent Saturday taking a slew of photos around the neighborhood. To whit:
* HAMPTON INN: I can report that dirt is indeed being moved (if not necessary removed) from the site of the Hampton Inn on the northwest corner of 1st and N. This is the L-shaped hotel that will wrap around a planned two-story retail building right on the corner (which is not yet under construction). But, in case you weren't around pre-2008 and want to know what this hotel is "displacing," I give to you a peek at the hotel's N Street and 1st Street frontages in their previous lives:
* YARDS/PARCEL N: Men in hard hats operating heavy equipment are now found on most of the block where Forest City's next residential project is planned, south of Tingey and west of 4th. The new photos aren't really all that interesting other than as another tick on the historical timeline, so how about a shot of what the Parcel N lot looked like in 2004 (right), before any of the work on The Yards began.
* PARC/PARK: Toll Brothers's River Parc apartment building at 1st and K is almost topped out (below left). A couple blocks away, WC Smith's Park Chelsea has reached the halfway point of its vertical construction (below right).
* ST. MATTHEWS: While all sorts of newness is erupting around the neighborhood, there is one farewell worth noting, as St. Matthew's Baptist Church as New Jersey and L has left the neighborhood that had been its home since 1905 and the building that had been its home since 1972. Compare how it looked in 2006 (left) to today (right):
This site is part of the footprint for Donohoe's 1111 New Jersey apartment building, and with a raze permit application filed, this corner will probably be emptied before too many months go by. The church has found temporary quarters in Ft. Washington as it looks for a new permanent home.
 

After not having a new high-rise residential project under construction in the neighborhood since spring 2009, it's sort of amazing to realize there are now three such buildings up out of the ground, with more than 900 new rental units in the pipeline for delivery within the next year to eighteen months. (And there could be another 650 units added to tally if both the Yards/Parcel N and 800 New Jersey/Whole Foods projects get going as expected in the coming months.)
The farthest along is the Twelve12 building at 4th and M, SE, at the Yards, which has its two residential towers topped out and its Harris Teeter space glassed in. Plus, it is also now seeing the glass being hung on the Vida Fitness/retail area at 4th and Tingey:
It will have 218 units, and the first move-ins are expected to happen by mid-year. This project is also where Sweetgreen and TaKorean will be located.
Meanwhile, the Toll Brothers building dubbed River Parc is racing right along, with five-plus of its 13 stories completed, helping to make the southwest corner of 1st and K look a teensy bit different than it did seven years ago:
This building will have 277 units, and is expected to begin leasing toward the end of 2014.
And up near the freeway, at New Jersey and I, the Park Chelsea is moving along, though the vertical progress of this 433-unit building is a bit slower than its smaller brethren. But as of now neighborhood eyes are probably more fixed on the completed paving of the new block of I Street between 2nd and New Jersey, though when the street will actually open to the public is not being trumpeted. (Spring 2014? Late 2014? We shall see!)
I think that, of the three, the Park Chelsea will have the biggest impact on the neighborhood skyline, both from on the ground (as you can now start to see in the various vantage points in the project's expanded before-and-after archive) as well as when looking into Near Southeast from the freeway. (And then it won't be too long until the Chelsea's sibling 800 New Jersey sneaks in just to its north and tweaks the views even further.). The downside is that a lot of views of the Capitol dome from Canal Park and Capitol Hill Tower are going to be lost to progress....
For more information/renderings for each project, and for more photos showing how these construction sites looked before work got underway, check out the Twelve12, River Parc, and Park Chelsea project pages. And join in with me in looking forward to the days starting to get longer, so that I can stop having to deal with the rotten winter sun angle and shadows.
 
30 Posts:
Go to Page: 1 | 2 | 3