Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: toll
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


30 Blog Posts Since 2003
Go to Page: 1 | 2 | 3

Friday's print edition of the Washington Business Journal reports that developer Ron Cohen has purchased the entire block bounded by Half, K, L, and 1st Streets, SE (square 699N), for $55 million, with plans for a mixed-use project that may include 650 condos, a hotel with condos, a stand-alone 250,000 sq ft office building, and possibly retail as well. Tenants on the block--including the nightclubs Wet, Edge, and Club 55--have been told that the buildings will be razed in late spring 2006. Phase I of the project will have 250 condos, and hopes are to begin construction in October 2006, and to have the entire project completed in four years. A few pictures of the block in its current state are on my South Capitol Street Corridor page (you'll have to scroll down a bit for them--this project will eventually get its own page, but not just yet!).

 
30 Posts:
Go to Page: 1 | 2 | 3




                  © Copyright 2024 JD.