Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: streetcars
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


13 Blog Posts Since 2003
Go to Page: 1 | 2

I just can't bear to go completely dark for too many days in a row, so here's some light reading for your post-turkey haze:
* These are almost a month old now (oops), but the Hill Rag has an opinion piece on the plans for the 11th Street Bridges, plus an article on the community concern on Capitol Hill and in Southwest over the planning for ballpark parking.
* Today's Washington Business Journal looks at the plans for the return of streetcars to DC, a very long-term project that could eventually have light rail running down M Street SE and across both the 11th Street and Douglass bridges. But that's a loooong ways off--first they have to finally get a long-delayed test line in Anacostia off the ground, and then the H Street NE corridor would be next. There used to be a good web site on the project at DCTransitFuture.com, but that site is now hijacked with a fake blog, so the best I can give you is this DDOT page with a few links.
* There's also a WBJ article on PNC Bank securing the naming rights to the Diamond-level seats (the second priciest) and the club lounge at the ballpark. Still no word on naming rights for the stadium itself, though a few weeks ago we heard that there might not be a sponsor during the inaugural season.
 

UPDATE, 1/5: Adding a link to this piece in today's WashTimes on the Anacostia trolley pilot, which doesn't include much new info, but the Bloomberg piece linked to below has disappeared, so this is good to have; in the meantime, be sure to ignore other pieces like this one that try yet again to say that the Bolling line will connect riders to the baseball stadium by 2008, which is just patently false.
Hat tip to the CHT Shareholder Community blog for finding this Bloomberg article, "Washington Trolleys Go Back on Track in Mass Transit Encore," which discusses the plans that have been in the works since 2003 to bring light rail to DC. One thing that the article doesn't quite make clear--when it's talking about building the first 2-mile line (describing it as "pass[ing] near the Washington Nationals' new downtown ballpark"), it's glossing over the fact that this test line is being built in Anacostia, along the east side of the river, whereas Near Southeast and the stadium are on the west side of the river. You can go to the DC Transit Future web site to learn more about the Anacostia Streetcar Project (the test line) and about the long-range plans. The planned corridors do include M Street SE, the 11th Street Bridges, and South Capitol Street. But this project has had many delays over the years (see my first post on it, from October 2003), the Anacostia test line is already at least three years behind schedule; but at least back in October the Transportation Planning Board allotted $3 million to the Anacostia Streetcar Study and added the first phase of construction to the Constrained Long Range Plan, so it's finally getting some funding. But, In other words, don't plan on buying your tokens just yet :-).
 

Monday's DC Examiner reports: "The Transportation Planning Board added more than $1 billion in projects for the District to the region's long-range transportation plan, according to officials. The stratagem, called the Constrained Long Range Plan, estimates about $4.5 billion will be available each year for the next 24 years to complete projects in Maryland, Virginia and the District. Projects can only be added to the board's long range plan if there is a solid funding mechanism in place. " Three of the DC projects will impact Near Southeast: the rehabilitation of South Capitol Street including transformation of the street into an at-grade boulvard from I Street to N Street and the construction of a new Frederick Douglass Bridge (costing $625 million and completed in 2015); the reconfiguration and reconstruction of the 11th Street Bridges (costing $377 million and completed in 2011); and $3 million for the Anacostia Streetcar Study, which would run light rail across the 11th Street Bridges from Anacostia down M Street SE to South Capitol Street. (The first phase of actual construction of the Streetcar Project has been added to the CLRP as well.) Here's an explanation of the CLRP as well as the Transportation Improvement Plan, which describes the schedule for federal funds obligated to state and local projects.
 
13 Posts:
Go to Page: 1 | 2