Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Nationals Park
See JDLand's Nationals Park Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1142 Blog Posts Since 2003
Go to Page: 1 | ... 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 ... 115
Search JDLand Blog Posts by Date or Category

My Ballpark and Beyond column in today's District Extra of the Post is an abridged version of my big summary of Friday's hearing on stadium parking issues, so if you're coming from the print version, read the blog version for lots of additional detail, along with my Stadium FAQ and Stadium Transporation and Parking page for more information and background on it all.
Comments (0)
More posts: parking, Nationals Park
 

A hearing is now scheduled for Jan. 30 at 6:00 pm on Tommy Wells's Performance Parking Pilot plan (B17-580), in front of the council's Committee on Public Works and the Environment. If you're interested in testifying, read the hearing announcement for instructions. And don't forget that two community meetings about the plan are scheduled for next week (Jan. 22 and 23). See my Upcoming Events Calendar for details; if you're not checking that calendar on a regular basis, you should!
Comments (0)
More posts: parking, Nationals Park
 

Your morning linkage:
* The Washington Times has "Parking a National Crisis", detailing what it considers to be the daunting challenges of getting to Nationals Park this year: "[The Nationals reported] that there barely will be enough parking spots (5,000) to accommodate season-ticket holders and that holders of single-game tickets probably won't find any spots in the neighborhood at all. That leaves walk-up fans and holders of single-game tickets with two choices: take the Metro or park at RFK Stadium and hop on the free shuttle. Now, neither of those options sounds all that terrible. But it's easy to envision thousands of stubborn (or clueless) fans driving to Southeast in their cars only to end up circulating around like Chevy Chase in 'National Lampoon's European Vacation.' "
You might want to read my detailed post on Friday's hearing as well as my Stadium FAQ's sections on transit and parking, for more information on the current state of ballpark-related transportation and parking issues. Also, I've posted a shiny new map showing the four zones where the Nationals are offering season-ticket-holder parking, along with the lots that may or may not end up being ones that the team has contracted with. Not an official map, just showing what's out there.
And, two items outside my purview from the past few days, but big enough to worth noting:
* Financing plans to move the redevelopment of the Southwest Waterfront have emerged, with the mayor seeking to provide up to $200 million in TIF and PILOT financing; the city also has agreed to lease 15 acres of land along the waterfront to developers (Hoffman-Struever Waterfront LLC). Here's the Post on the news and concerns about so much public financing as the real estate market appears to be teetering, as well as article by the Washington Business Journal and the city's press release.
* Last week the city dropped the group led by Mid-City Urban from the short list of developers who could be awarded Poplar Point, leaving three teams in the running, two of which include a soccer stadium as an optional part of their designs. (Mid-City's design was the one that included the "aerial tram" across the Anacostia to carry passengers to Near Southeast.) The city issued a press release about the narrowing of the short list last week, and Post wrote about the status of the competition on Monday. The city could name the development partner next week. Near Southeast behemoth Forest City (of The Yards and the Capper redevelopment, as well as the Waterside Mall project in SW) is one of the remaining three teams. You can see more about the proposals at And Now, Anacostia (which also got mentioned in the Post article).
Comments (0)
More posts: parking, Nationals Park
 

Metro has just launched a new web page to help stadium-goers plan their trips to Nationals Park via public transit. It's at wmata.com/nationals, and it gives links to Metro's Trip Planner, information on Metrobuses that stop near the ballpark, how to use the parking lots at Metro stations, and more. And, for you diehards: "Metro will soon be offering a choice of commemorative SmarTrip cards, available for a limited time only."
Also, the parking information for season ticket holders is starting to arrive in mailboxes around the area today. I'll link to the Nats' web site with the information once they've got it up, but until then, here's the map of the four parking zones and the prices per game that ticket holders will have to pay. (Note, none of the zones are in Southwest.)
I'll be updating my Ballpark FAQ and Stadium Parking/ Transportation pages with this new information as soon as I find the 25th hour in the day.
Comments (0)
More posts: Metro/WMATA, parking, Nationals Park
 

The official announcement will come soon, but Monument Realty has confirmed to me that today they are turning over to WMATA the west entrance of the Navy Yard Metro station --on schedule--so that "fare installation" can begin (i.e., making the entrance useable). Monument says they completed their building structural commitments to WMATA back on Dec. 21. (hat tip to Nats320)
If you look at the Half Street web cam, you can see that the station entrance at lower center does look like it's getting cleaned up somewhat. Monument's initial Half Street project--office, hotel, residential, retail--is not scheduled to be completed until the end of 2009, but the Metro station is expected to be reopened in time for the beginning of baseball. The 55 M Street office building is currently being built on top of the Metro entrance; the southern half of the block, which is currently a big hole but where a hotel and residential units will be offered, should see construction begin soon. Retail will line the ground floor (and some second-floor spaces) all along Half. No tenants have been announced yet for the retail spaces, and, as I mentioned this morning, Monument appears to be looking for a new chain to operate the 200-room hotel.
As for what Half Street will look like during the inaugural season of the ballpark while construction continues, the Office of Planning report on Monument's request for some minor modifications to their Half Street designs has a description: "As part of the original proposal, the applicant showed a covered walkway on the east side of Half Street as a temporary condition during construction. Present plans call for pedestrian traffic to be directed to the other side of Half Street on non-game days, and for the entire street to be opened to pedestrian traffic on game days. Therefore there is no need for a covered walkway. The applicant has committed, however, to maintain a decorative fence at the edge of their construction zone as generally shown in the original plans."
Comments (0)
 

I mentioned in my mammoth post on Friday's parking roundtable that a community meeting on stadium parking and traffic plans is scheduled for Wednesday, Jan. 16--although it was mentioned in a Kwame Brown press release as being a public meeting, it's actually just the monthly workshop for community leaders and city agencies trying to get all the plans figured out, and isn't quite meant for the huddled masses yearning to park free (or not free). When there's a plan, there'll be meetings for everyone. If you're desperate to get together with the community and discuss parking, there's still the public meetings on Tommy Wells's parking plans, on Jan. 22 and 23.
Comments (0)
More posts: parking, Nationals Park
 

Just a quick couple of links:
* The Washington Times profiles Steve Cohen of Opus East, who's been promoted to vice president of real estate. Opus's two current projects in the District are both in Near Southeast: 100 M Street and 1015 Half Street (not "1015 F" as the article says). The article touches a bit on how Opus plans to handle any slowdown in the commercial real estate market.
* A few days back the WashBiz Blog on washingtonpost.com featured a quick overview of Monument's Half Street project and an interview with the company's executive vice president, F. Russell Hines. No news in the piece to any regular readers of JDLand--it mentions Monument's lawsuit against WMATA over the Southeastern Bus Garage, but gives no status report on where it stands.
* This is also a few days old, but I can't let an entry go by without mentioning parking, so here's a link to a WUSA piece from last week that, in a stunner, finds baseball fans who are upset at the idea of Tommy Wells's Performance Parking Plan, given that it might prevent them from parking for free on neighborhood streets for three-plus hours 81 nights a year.
 

Comments (0)
More posts: Nationals Park
 

I've been told by "someone with knowledge of the Ballpark District" that demolition of the old buildings on the Willco Construction site bounded by M, N, Cushing and First is scheduled to start on Monday. And that a temporary surface parking lot is slated to be built in this spot, just north of the eastern garage at the ballpark. We shall see if this does indeed come to pass....
UPDATE: Seeing that there's no bulldozers in action on this block today, I'm officially never believing a start-of-demolition rumor ever again. Though I did see heavy equipment parked near one of the buildings a few hours ago.
Comments (0)
More posts: parking, staddis, Nationals Park, Square 701
 

Having just about reached my limit when it comes to writing about stadium parking, I'm going to cut to the chase and pass along the biggest items from today's hearing by the Committee on Economic Development on parking and traffic issues at the new Nationals ballpark. (It's a torrent of words, so I've bolded the most important items.)
The session began with ANC representatives testifying about the community's concerns that no traffic and parking management plan has yet been unveiled, and with not many days to go (no one was sure whether it was 82 or 81 or 80 days--it's actually 79, but I didn't pipe up), neighbors are getting increasingly nervous that plans and signage won't be ready by Opening Day. While Tommy Wells's proposed Performance Parking plan could eventually become the mechanism for handling on-street parking near the ballpark, it won't be able to be in place by Opening Day, and so residents want to know how parking is going to be restricted to prevent stadium-goers from descending on nearby streets in search of free parking and bringing what has frequently been referred to as "controlled chaos."
Kwame Brown became frustrated when trying to find out who is actually in charge of coordinating all the government agencies who have a hand in the ballpark and communicating information to the public--"Who do I call? Who's driving the train?" he asked a number of times. After much back and forth with Greg O'Dell of the Sports and Entertainment Commission and Judi Greenberg from the Office of the Deputy Mayor for Planning and Economic Development, it was finally agreed that DDOT is now in charge of organizing and implementing the stadium's traffic and parking plans.
Determining this was a good step for this hearing that had been convened to discuss those plans, except for one small detail--council member Brown's Committee on Economic Development does not have oversight responsibilities for DDOT, so no one from the agency was in attendance.
Oops. (Apparently there had been plans to hold this hearing jointly with Jim Graham's Committee on Public Works and the Environment, which oversees DDOT, but that did not come to pass.)
It was said that DDOT will be unveiling the traffic operations and parking plan next week, though of course no one from DDOT was actually there to confirm or deny this.
Greg McCarthy of the Nationals testified about the team's continuing efforts to plan for the onslaught of fans, ranging from the mailing next week of parking information to season ticket holders to a planned media onslaught beginning in February to educate stadium-goers about the best ways to get to the park. (Short version: Take Metro! Walk! Bike! Park in Metro parking lots! Don't drive to the ballpark unless you've already got a parking pass!)
There still is no signed agreement between the Nationals and the city for use of RFK as free satellite parking for non-season-ticket holders, though clearly both sides anticipate it will get done, especially since the Nationals are working out the best routes for the free shuttle buses they plan to provide from RFK to the new stadium. (But Kwame Brown did not seem too enthused that the city might not be getting any revenue from the parking spaces.)
The team anticipates having 5,000 spaces for season ticket holders available in lots within walking distance to the ballpark--and, other than one lot that sits on the west side of South Capitol Street underneath the freeway, all lots will be in Southeast and none will be in Southwest.
Tommy Wells focused a number of times on the idea of the neighborhood embracing the ballpark as part of its culture and part of the character of the community. How neat it will be for residents to be able to walk to games, he said, expressing his hopes that the ballpark is a positive experience for both fans and residents. (Putting the stadium there "was not a hostile act by the government," he said). He also spoke of how the stadium's on-time and on-budget completion should be a real celebration for the city, but that he doesn't want it to become known as the "ballpark with a traffic catastrophe."
My favorite moment of the hearing was when discussion turned to how exactly the onslaught of papal groupies will be handled when the Pope comes to the ballpark on April 17: I realized that all this time I had assumed Pope = Mass = Sunday, when in fact the event will be on a Thursday morning, which will make traffic and parking that much more of a challenge. Start planning your vacation day now.
Other items of interest:
* Charter buses are expected to be parked across the South Capitol Street bridge during games.
* The Nationals have secured 4,000 of the 5,000 spaces they are eyeing near the ballpark, and expect to have the other 1,000 by Opening Day. There will be about 3,000 spaces at RFK, in Lots 7 and 8, and the team will be running a test of the RFK shuttle buses on Friday.
* There will be 130 handicapped parking spaces in the two lots on the ballpark site.
* The Navy Yard Metro station is expected to be ready by Opening Day.
* The Nationals will be responsible for clean-up around the ballpark and surrounding streets after games, most likely through an augmentation of the Capitol Riverfront BID's "clean teams".
* There are still plans for two job fairs to be held in Southwest, perhaps on Feb. 9 and 23 at Greenleaf Rec Center.
There's probably other items I missed that some people might be interested in, but I think that's more than enough for a Friday night.
It's anticipated that a joint hearing of both the Committee on Economic Development and the Committee on Public Works and the Environment--which oversees DDOT--will be scheduled soon.
The broadcast of the meeting is already available on demand, if you have three hours of your life you're not doing anything with. I've also posted the prepared statements of the witnesses from today, which you should definitely read to get more information than I've been able to summarize here. Also available is a press release from Kwame Brown's office about the hearing, in which he calls for "enhanced coordination from DC agencies and increased public involvement."
UPDATE: Here's the WashTimes article on the hearing. And the Examiner's.
Comments (0)
More posts: ANC News, Metro/WMATA, parking, Nationals Park, Traffic Issues
 
1142 Posts:
Go to Page: 1 | ... 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 ... 115
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.