In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


96 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10

Today's demolition news: Edge/Wet and Food and Friends on Square 699N are just about gone. The Nexus Gold Club has lost its rear wall and its innards have been mostly scooped out. And a new entrant has possibly appeared in the Demolition Derby--innard-scooping appears to be going on as well at Nation/1015 Half Street (which now has a "Wrecking Corporation of America" sign hung on its fencing). I took photos of some of these sites this morning (although this 967th overcast day in a row hampered the results): check the New Jersey and I, New Jersey and K, and 1st and L angles in the Photo Archive to see the before-and-after comparisons of those corners, or see all the shots from today in a single group. I also skipped ahead a few hours and added the three all-but-gone structures to the Demolished Buildings Gallery--there must be something about April, because we've had 17 buildings bulldozed in the last 18 days (will Nation be added to the list before the month is out?). UPDATE: Just clarifying, there's no heavy machinery or obvious demolition going on at Nation yet--but a medium-sized hole has been punched in one outer wall, some doors were opened, and it looked like the interior has been newly stripped down.
And while it doesn't really qualify as a demolition, I'll also pass along that the temporary WMATA employee lot on the Monument Half Street site has now been closed and is being dug out (they received their Certificate of Occupancy for the new lot one block over on South Capitol last week)--this means that the entire Monument site on the east side of Half has now been cleared--and no time is being wasted with excavation, as you can tell if you go peek at the massive hole already dug around the Half and M Navy Yard Metro entrance or watch the digging at the lower left of Stadium Construction Camera #2.
 

The sudden whirlwind of demolition in Near Southeast continues, as today work started on bringing down the Nexus Gold Club, but not until after the bulldozing of its neighbor, the old Four Star Cab brick townhouse at New Jersey and K (whose own neighbors were demolished almost exactly a year ago). This block will be home to 909 New Jersey Avenue, JPI's 230-unit residential tower; it should be noted that the A1 Tires garage on the southwest corner of the block (at 1st and K) shows no sign of selling out to JPI, so it appears for now that 909's residents will have no problem getting car repairs. (Glass half full!)
In the meantime, across the way, demolition proceeds apace on Square 699N, as all buildings along 1st Street between K and L have now been brought down, including the festive gold, green, white, and cranberry garage on the corner of 1st and L. Only Food and Friends and Edge/Wet remain standing; if you have respects to pay to them or the Nexus, you'd better do it tonight or tomorrow morning.
All this means three new entries on my Demolished Buildings page, with space being saved for Nexus and the others. And as soon as Mother Nature remembers that it's April and not November, I'll post pictures of the new streetscapes.

 

This weekend has not lent itself to photography, but my schedule is going to be tight for the next couple of weeks and I couldn't bear to go a month between ballpark updates. So you can check out the latest updates to the Stadium Construction Gallery--I didn't update the entire set, because some of the shots on the southeastern side of the ballpark aren't changing as much now, so why replace pretty blue-sky shots with dreary overcast facsimiles? But I did also add some new "stitched-together" before and afters, to show panoramic shots of various intersections around the site. I'm not sure whether these will become a permanent fixture (the fish-eye distortion on some is a little disconcerting), but given what I had to work with weather-wise, at least it's something a little different. I also added more pictures to the Square 699N page, as demolition continues there. You can also of course browse the Click to see all available photos of this location. Photo Archive to see additional photos of intersections and vantage points you're interested in, or you can look at all photos I've posted from yesterday and then click on the intersection/angle to see the complete archive for that view. And let's hope the sun returns eventually. And we've also got Demolished Buildings #127 and #128.
 

A reconaissance mission through the Hood today yielded a lot of new tidbits; click on the links for project details and new photos added to the Archive:
* The "branding" of The Yards has begun, with huge signs now hung from the old Gun Assembly Building on M Street east of 4th;
* The new stoplights along M Street at New Jersey and at 4th are now flashing red, no doubt to be turned on Any Minute Now with the impending start of DOT HQ move-ins (next week?);
* Nation now has fences around it;
* Demolition on Square 699N has crept along K Street from its starting point at Half and K, and has now made it to the corner of 1st and K; this means that there are three new additions (124-126) to my Demolished Buildings gallery; and
* Gas has skyrockted in the last month (yes, the infamous Gas Prices tracking page is back!).
(UPDATED to fix a lot of stupidly broken links.)

 

At last, I've gotten the word on what's coming on Square 699N, the block bounded by Half, K, L, and 1st, owned by the Cohen Companies and the former home to nighclubs Wet, Edge, and Club 55, and a series of other small businesses. After what apparently was quite a ride through the DC raze permitting process, they are planning to begin exvacation in July for Phase I of their project (called "Velocity"), which will be a 200-unit condo building on the northwest corner of 1st and L; it will be delivered in late 2009, and will have retail as well. Phase II will be a "mirror-image" 200-unit condo building, at Half and K; Phase III is not yet written in stone, could be an office building, but will depend on What the Market Will Bear. (The three levels of underground parking for both condo buildings will be constructed during Phase I.) There will be a web site coming in May, and then in June a "state of the art" sales center will be opening at Half and K, so before long we should get some renderings of what it's all going to look like. In the meantime, demolition continues, and when we get a bright sunny day where it's not 40 below, I'll post some updated photos.
More posts: Square 699n, Velocity Condos
 

It didn't take long this morning for the last three standing buildings between N and Van streets across from the ballpark to get taken down--the two rowhouses at 30 and 32 N are gone, and as of this moment the Good and Plenty Carryout at 36 N is in mid-demolition (the Clark Stadium Construction Cam [Camera #2] continues to provide birds-eye views of this work). So now we have Demolished Buildings #120-122; you can also see what this stretch of buildings has looked like over the past few years (up through yesterday evening) from Van and from Half. And I imagine I'll be back later today with an update on the progress of Square 669N's demolition.
UPDATE, 1:01 pm: I can also report that the Club 55 building, on the Square 669N site just east of the Half and K intersection, is now Demolished Building #123.
More posts: West Half St., Square 699n, Velocity Condos
 

It's a demolition two-fer today--in addition to 26 N Street being knocked down on the Monument Realty land just north of the stadium, I was a little surprised to find that the wrecking crews started work today on Square 699N, taking down the red brick building/loading dock at Half and K (exposing some of the interior of Club 55) as well as the northwesternmost portion of the Edge/Wet building. You can see also at the top of my Square 699N page a well-timed shot of the entire block before demolition started, taken yesterday morning from the top floor of 20 M Street. And we've now got Demolished Building #119. I imagine the rest of the block is going to go pretty quickly. And then perhaps Mr. Cohen will tell us a bit more about what he's got planned for the site, beyond "mixed-use/office/condos."
More posts: Square 699n, Velocity Condos
 

From today's print edition of the Washington Business Journal: "CNN and a couple of law firms are sampling the wares in Southeast DC by taking tours of new office buildings cropping up around the new baseball stadium. No leases have been signed yet, but the buzz of these high-profile tenants looking at Southeast as an option is quite a victory for a neighborhood formerly known as an industrial zone crawling with seediness and crime. [...] Also, rents in Southeast are expected to be around $40 per square foot for full service, $20 to $30 cheaper than new or renovated buildings in the Central Business District." Of course, right now, "tours of new office buildings" means 20 M Street, the only new office building currently completed and with plenty of space to lease. But by 2009 there will also be 100 M, 55 M, and probably 250 M and 1111 New Jersey. And maybe a couple more, depending on what happens within the next few months at Square 699N, Square 697 (Nation), and the Willco site at 83 M. (The article fudges a bit by mentioning 1.8 million square feet of office space was under construction in Near Southeast back in December, but, well, 1.35 million of that was the DOT HQ.) UPDATE: Added the link to the story, since WBJ was nice enough to bring it out from behind the pay wall.
 

Goings on about town.... Earlier this week the construction crane arrived at the Onyx on First/100 M Street construction site, signaling the beginning of the end of the digging-down phase and the start of the building-up phase. (Though these two projects are being developed by different companies, they are being built concurrently--that's synergy, and cost savings!) Two blocks over, a big sign has gone up at 2nd and M advertising Washington Canal Park--the graphic on the sign is the same one I found a few weeks back in the Capitol Riverfront BID executive summary. And, today, fences have been erected around Square 699N, the entire block bounded by Half, K, L, and 1st, the former home to Wet/Edge and various other small businesses. Permits appear to be in place for demolition and excavation, so with the fences up I'd expect something to start happening soon--now if only the Cohen Companies would tell us WHAT! You can see a few new shots on my Square 699N and Canal Park pages, or here in the Photo Archive all at once. UPDATE: I should add that, back in September 2005 when Ron Cohen purchased Square 699N, it was reported that the block would be developed with 650 condos, a hotel with condos, a stand-alone 250,000 sq ft office building, and retail. But there's been little reporting since on his plans.
More posts: 100 M, Canal Park, Onyx, Square 743N, Square 699n, Velocity Condos
 

On Wednesday a "shoring and sheeting" building permit application was filed for 1001 First Street, which is on the block known as Square 699N, bounded by 1st, Half, K, and L streets. It was bought in September 2005 by local developer Ron Cohen for $51 million, and was the home to nightclubs Wet, Edge, and Club 55, along with various other small businesses that slowly moved out until the block was left vacant in September 2006. As for the building permit app, shoring and sheeting is how the walls of a big hole in the ground are held up during excavation (I hope that isn't too technical of an explanation), and is another sign that Cohen is getting his ducks in a row to do .... something .... on this lot, as were the public space permits that were granted in December 2006 for the necessary water and sewer shut-off work on the site. I haven't seen evidence of raze permits, but I only started seeing those in Fall 2006 and it's possible that they were applied for earlier. What I did notice during a drive-by today is that all of the trees on the block--including a pretty huge one at 1st and L--have been chopped down (I'm pretty sure within the past week). Will we hear word of Cohen's plans soon?
(I was hoping to give you an equally enticing report on a building permit app filed for 83 M Street, the Normandie Liquors lot at 1st and M, but apparently it's for the placement of a construction trailer, which I'm guessing is for Monument's Half Street project, though I don't know for sure. Ah well.)
 
96 Posts: