Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: square 698
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


29 Blog Posts Since 2003
Go to Page: 1 | 2 | 3

From today's print edition of the Washington Business Journal (subscribers only), news that two as-yet-unoccupied office buildings in Near Southeast may be close to securing tenants. WBJ says that Monument Realty is "in discussions" with Booz Allen Hamilton to lease more than 30,000 square feet of space at 55 M (currently home to Artomatic), though Booz is apparently also looking at Lerner's 20 M across the street and the under-construction 1015 Half a block to the north.
The article also says that an "undisclosed federal agency is on the cusp of announcing" a 100,000-sq-ft lease at 20 M. I have heard murmurings of some outfit moving to 20 M--if someone wants to whisper in my ear who it is, I'm listening!
 

As I wrote a few days back, there are apparently plans to add a DC Circulator bus route in spring 2009 that would run between Union Station, the new US Capitol Vistors' Center (if it ever actually opens), and the Navy Yard station entrance at New Jersey and M (two blocks from Nationals Park). Since it would run on a similar route to Metro's N22 bus, Metro would then discontinue the N22, a move which requires a public hearing. So, on the agenda for this Thursday's WMATA board meeting is an item to both authorize the scheduling of the public meeting and also to amend Metro's FY09 budget to extend through March 2009 the current N22 service, which was expanded to evenings and weekends just before Opening Day as a way to move people to and from the ballpark. Here is more information detailing the agenda item.
One thing the board will not be voting on this week is the selection of a developer for the Navy Yard station's chiller plant site on the southwest corner of Half and L. Back in July there were discussions by WMATA's Planning, Development and Real Estate Committee in executive session about this selection, but nothing has been announced publicly and no items on the chiller site are on any of Thursday's agendas. Waaah.
 

* No big news out of yesterday's WMATA board meetings--the board gave Metro staff the go-ahead to negotiate a deal with a developer for the 14,000-sq-ft Navy Yard chiller plant site at Half and L, but didn't say in public session who the developer is or what the project might be. The only tidbits in the resolutions were that the project should be LEED certified and that it should be required to make a contribution to the city's affordable housing fund (both of which, I believe, would be the case anyway given the city's new green building and inclusionary zoning laws unless there's some WMATA loophole I'm unaware of).
* I imagine all the local blogs will be talking about this AP story today on DC's levee system. To tie it to the neighborhood, one of the things currently happening at the Yards is that they're building up the ground level in places to make sure that it's above the 100-year flood plain.
* What's the Sports and Entertainment Commission doing now that the ballpark has opened? The WashTimes takes a look.
* The Nationals have announced their promotions and ticket packages for the rest of the season. They'll finally be back at home starting Tuesday after what seems like forever. See my Events Calendar for the schedule of home games through the end of the season.
* NBC4 interviews one of the coworkers of the two men killed on the open-top bus on the way to Nationals Park.
* DC Metrocentric focuses on Near Southeast by pelting me with questions.
* Off-topic, but readers might be interested in this WashTimes overview of the plans for and the current status of redevelopment in Southwest.
 

The agendas for Thursday's various Metro board meetings have been posted, and, barring a last-minute change, it looks like the Planning, Development and Real Estate committee will finally be taking up the awarding of the Half and L "chiller plant" site for the Navy Yard Metro station to a developer. It's going to happen in an executive session (the agenda says nothing more than "Term Sheet on Navy Yard Chiller Site"), so it could be possible it's not yet a done deal. They've been trying to bring this up at the board since February; the solicitation for bids for the 14,100-sq-ft site happened nearly two years ago.
Comments (0)
More posts: Chiller Site/WMATA, Metro/WMATA, square 698
 

It's now becoming almost a monthly occurrence, watching for the WMATA Planning, Development, and Real Estate Committee agendas to be posted, to then find that the agenda item for naming a developer for the Navy Yard subway station's 14,000-sq-ft "chiller plant" site on the southwest corner of Half and L has been pushed to a "subsequent agenda"--and it's now happened again, with a July 24 date now attached to it. (It was last marked for June 26.) This site would be a joint development between WMATA and whoever gets chosen, and beyond that there's no hints as to what sort of development it could be, or whether they'd try to acquire the Empire Cab company next door on L. You can read all my previous entries on the chiller plant here--and I bet you didn't know that the blog has such a spiffy search interface!
Comments (0)
More posts: Chiller Site/WMATA, Metro/WMATA, square 698, square 698
 

Just like last month, the agenda for the WMATA board of directors meetings this Thursday includes an executive session, and in that executive session is the agenda item "Legal Issues - Monument vs. WMATA." For those of you just joining us, this lawsuit is a result of the bidding process for the Southeastern Bus Garage at Half and M that awarded the site to Akridge for $69 million--Monument argued that they were supposed to have first dibs on the site after being named "master developer" by the city. A judge awarded a preliminary injunction on the sale in February, saying that Monument has "demonstrated a likelihood of success on the merits of their claim that they were substantially prejudiced when WMATA considered Akridge's nonresponsive bid and participated in improper ex parte discussions with Akridge." I never heard about anything coming out of last month's board executive session when this was supposed to be discussed; perhaps there will be some action needing to be taken this time outside of executive session to give us a hint.
There's nothing else of Near Southeast-interest in the other WMATA board meetings on Thursday, but the Subsequent Agenda for the Planning, Development and Real Estate Committee says that its June 26 meeting will include an action item for approving the term sheet on the Navy Yard Chiller Site at Half and L. A joint development solicitation for this 14,100-sq-ft site was released back in September of 2006. A "developer selection" was supposed to be on the board's agenda back in January, but then disappeared; we'll see if this June item actually holds. The 2006 solicitation described WMATA as "looking for innovative plans . . . that will yield quality developments for the local communities, increase transit ridership, enhance the local tax base and provide a stream of revenue to WMATA for capital needs." Proposals were also supposed to follow the principles of "transit-oriented development" -- "providing safe, walkable, mixed-use communities that emphasize transit connections and reduce auto dependency." While doing all that, the site's developer would still have to replace the chiller operations either on site or somewhere close to the Navy Yard station.
 

* The Post says that 14,000 tickets to the April 17 Mass at Nationals Park will be distributed to 120 Catholic diocese outside of the Archdiocese of Washington, with the Diocese of Arlington getting 6,000 and the Archdiocese of Baltimore getting 2,500. And on Friday, parishes that are part of the Archdiocese of Washington will find out how many tickets they're getting--parish priests will then decide how to distribute tickets within the parish.
* The Examiner has a story about the Southeastern Bus Garage site and that the Nationals and Metro are in talks to provide 350 gameday parking spaces at the garage (plus three nearby WMATA-owned parking lots, though that's not specified in the article). The only real news in the article is that a judge is expected to rule this week on Monument Realty's lawsuit over the sale of the garage site to Akridge. For more background, read all my posts on the bus garage saga.
* Yesterday's scheduled council hearing on Monument's request to close the alley on Square 700 just north of the closed BP Amoco station was cancelled. No new session has been posted on the calendar.
* And the agenda for Thursday's WMATA Planning, Development and Real Estate Committee does not include anything on the joint development of the chiller plant site at Half and L, as had been anticipated back in January. Maybe next month?
* If you think you're excited about the local food vendors at the ballpark announced yesterday, you should read Marc Fisher.
* UPDATE: I've gotten word that the long article in the March Washingtonian on the ballpark is now online. The other related article, about residential developments planned around the stadium, won't be posted for a couple of weeks. So you'll just have to go buy it, I guess. And perhaps you too can then be like the poor soul at Safeway on Sunday reading that article, who got accosted by a pesky blogger in line in front of him pointing to a name on the page, saying, "That's me." Thankfully he didn't call security.
 

Back in September 2006, WMATA solicited proposals to develop four of its properties, including the east entrance of the Navy Yard Metro station at New Jersey and M and the 14,100-square-foot parcel on the southwest corner of Half and L streets, SE, where the Navy Yard Metro station's "chiller" is located. While the sale of the New Jersey Avenue land to Donohoe was approved by the WMATA board in December, there hasn't been even a smidgen of news about the chiller site in more than a year.
But now, nestled deep in the posted paperwork for Thursday's WMATA board meetings is an expected agenda for the Feb. 14 meeting of the Planning, Development and Real Estate Committee that lists "Navy Yard Station Chiller Site Developer Selection" as one of the action items. Citing the ongoing negotiations, Metro wouldn't give me any additional information, so we may have to wait for Valentine's Day for the "reveal," unless someone blabs beforehand. Once the mystery developer's section is approved by the WMATA board, the final negotiations for an agreement would begin. The property is currently assessed at just under $4 million.
The solicitation described WMATA as "looking for innovative plans . . . that will yield quality developments for the local communities, increase transit ridership, enhance the local tax base and provide a stream of revenue to WMATA for capital needs." Proposals were also supposed to follow the principles of "transit-oriented development" -- "providing safe, walkable, mixed-use communities that emphasize transit connections and reduce auto dependency." While doing all that, the site's developer would still have to replace the chiller operations either on site or somewhere close to the Navy Yard station.
There's also a 7,700-square-foot privately owned parcel next to the chiller on L Street, assessed at $1.72 million and currently home to the Empire and DC Flyer Cab Company. It has had "Build to Suit" signs flying for quite some time, so it's possible that the developer of the chiller site could acquire that land as well. And this spot is already surrounded by current and planned office projects, with the completed 20 M Street and the planned 1100 South Capitol on adjoining lots, and the starting-any-minute-now 1015 Half Street across L Street. See my Square 698 page for photos.
Comments (0)
More posts: Chiller Site/WMATA, Metro/WMATA, square 698
 

Today's print edition of the Washington Business Journal reports that National Public Radio is looking for 400,000 square feet of office space for a new headquarters to replace their current location on Massachusetts Avenue. In addition to sites in NoMa and Silver Spring, the article lists possible Near Southeast locations 1015 Half Street, 1100 South Capitol, and.... 225 Virginia Avenue? The site for which the city signed a long-term lease last year when it planned to move the the Metropolitan Police Department there, before that plan fell apart in late summer? Is this just a mistake by the reporter, or is this a hint at bigger news afoot about the future of the old Post Plant?
Maybe those Capitol views are particularly enticing to the media--two months ago the WBJ reported that CNN is also looking at 1015 Half, 1100 South Capitol, and Lerner Enterprises' proposed building at 1000 South Capitol. (The lower prices on commercial real estate in this part of town probably don't hurt, either.)
 

The fine folks at Ruben Companies have passed along to me a rendering of its planned 350,000-sq-ft office building at 1100 South Capitol, now dubbed "SC1100." With that in hand, I've created a page for both SC1100 and the rest of the block it will occupy, known by the cool land-record kids as Square 698, and have added it to my main map. Ruben also now has a page about the project on its redesigned web site. There's no timeline as yet for the start of construction.
More posts: 1100 South Capitol, square 698
 
29 Posts:
Go to Page: 1 | 2 | 3




                  © Copyright 2024 JD.