Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Square 697n
See JDLand's Square 697n Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


31 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

I wandered around on Sunday for a photo session, wishing that spring would hurry up and get here so that the sun will rise higher during the day and set farther west so that I can stop dealing with the damn glare whenever I face southward.
* I have new images along N Street just north of the ballpark between Half and First, which show the work at the entrance plaza at Half Street, including glass now being installed on the ground floor of the western parking garage, as well as the structures that will make up the entrance gates.
* In fact, I updated all 12 angles of the Half and N intersection, which now that it has its new wide sidewalks, curbs, streetlights, and an initial paving job, is really a stunning testament to 24 months of change, not only on the four corners of Half and N but the blocks to the north as well. It's definitely worth a look.
* I took a lot of photos of the now-demolished Willco stretch along First Street (and gave the project its own page as well), and of course I got all the usual angles of 55 M Street.
* On Half Street between I and K, where JPI's 23 I Street residential project is expected to start this year, a pile of red-and-black advertising banners have been hung on every available surface, and a "JPI Permit Parking only" sign has appeared on the entrance to the former towing company's parking lot on that block. I'm guessing JPI's purchase of the property just closed. I haven't heard anything about potential start dates for this project, or when the Wendy's might close.
* If you browse all the photos I took yesterday, you'll also see a smattering of 70/100 I and 100 M shots as well as images of the two blocks along Third Street where temporary surface parking lots are going in (so now my pictures of those blocks have changed from post-demolition views of nothing to pre-blacktop views of nothing). And the always popular shots from the SE Freeway at South Capitol are updated, too.
And don't forget to click on the icon wherever you see it to see all photos in the archive of a certain location.
 

Just drove by and saw that the little garage on the 1015 Half Street site now is gone, making it the first entry in the Demolished Buildings gallery for 2008, and the 143rd building that I've seen come down in Near Southeast since January 2003. This site--formerly home to Nation, itself demolished in May of 2007--is expected to see the start of excavation on Opus's planned 410,000-sq-ft office building Any Minute Now.
Comments (0)
More posts: 1015 Half, Development News, officespace, Square 697n
 

Digging in the DC land records database late on a Friday afternoon (isn't that what everyone does to get ready for the weekend?), I see that the ExxonMobil Corporation deeded its land at South Capitol and I in November to the ExxonMobil Foundation. There's nothing stated in the deed about any planned uses for the land, except to spell out restrictions on future uses and requirements for cleanup since the site may have contaminated soil. As for the foundation itself, a little blurb describes it as the "primary philanthropic arm of the Exxon Mobil Corporation in the United States. The Foundation and the Corporation engage in a range of philanthropic activities that advance education, health and science in the communities where ExxonMobil has significant operations." Is this the prelude to selling the land (assessed at $16 million in 2008) and having the foundation get the proceeds? Or is something else afoot?
Comments (0)
More posts: exxon697n, South Capitol St., Square 697n
 

Time again to dig into the What's the Deal With....? mailbag. Reader BH has asked about the two boarded-up gas stations and the old KFC along South Capitol Street, wondering when they're going to be demolished.
I have no answer, alas, for the former Exxon station on the east side of the street at I, which has been closed since May 2006 after its owner pleaded guilty to double-billing government contractors for more than $120,000; JPI was apparently somewhat interested in acquiring it so that they could build 23 I on the entire block, but that doesn't seem to have happened.
The KFC/Taco Bell closed in June after being bought by Ruben Companies, which has long-term plans for an office building on the site, to match their SC1100 on the east side of the street and 21 L Street to the north. However, they are not planning to demolish the KFC anytime soon, and in fact are looking to rent the space to a food-related business in the near-to-medium term.
The second Exxon, on the west side of the street south of K, closed at the end of August. The rumor was that the lot was going to be sold, but so far no transactions have shown up in the DC property sales database. (Ruben owns the other two-thirds of that block, which is the 21 L Street site.)
(I went 1 for 3 on this. Yeeech. This is what I get for not anticipating that WTDW.... questions wouldn't necessarily be ones I know the answers to! But I'm willing to keep trying--if you have a WTDW.... question, pass it along. Be advised, though, that I'm posting these as I can get to them, so submissions may not get addressed right away.)
 

With a hat tip to a tipster who shall remain nameless, I'm passing along CapitolYardsDC.com, the new splashy web site launched by JPI to market its four Near Southeast apartment buildings along I Street, which will total 1,350 rental units and which together are being called "Capitol Yards."
The two buildings I always cover together as 70 and 100 I Street have been dubbed Jefferson and Mercury at Capitol Yards, and although they're right next to each other they will have distinctly different looks-and-feels. The Jefferson will have more of a "warehouse" feel, with "exposed brick and hardwood floors" for a "spacious loft-style atmosphere", while the Mercury next door will be going for "up-to-the-minute finishes."
Across the street, 909 New Jersey is now known as 909 at Capitol Yards, and its page touts a "two-story lounge with a modern bar, plasma TVs and a 90-inch projection TV" as well as an Asian-themed spa and a rooftop deck with "lounging and grilling areas." This building will also have restaurant and retail tenants on the first floor (which might also prove to be a handy stop for Nationals fans walking along New Jersey going to or from the Capitol South Metro station).
The pages for each of these projects also include animated views of the building's exteriors.
There's also a page for what's now 23 Eye at Capitol Yards (though I haven't decided yet if I'm going to always indulge that whole "Eye" thing), which has the first rendering I've seen of the building that will eventually go up west of Half Street (where the Wendy's and a towing company currently reside). Its page touts not only a rooftop pool, but also a rooftop dog park, which one would like to assume will be outfitted with very high fences. The 421 units are being described as "two-story true loft homes with 18-foot windows"; the site also says that the building will be Washington's first LEED silver-certified residential building.
You can wander through my project pages for each of these buildings to see where they're at (and what their lots looked like before). The furthest along are 70 and 100 I, scheduled to open in the summer, and are now topped out and getting their brick facades. The hole has been dug for 909 New Jersey, and it is supposed to open in mid-2009. Nothing has changed yet at the 23 I site, but construction is expected to start in 2008.
 

The Examiner today has a piece on the planned cleanup of contaminants at 23 I Street--and we can take a moment to ponder where the story idea might have come from (I say as I point you to my "Environmental Cleanup at 23 I Street" post from a few days ago--someday newspapers will stop treating blogs as freebie no-credit tip lines). The story headline is "Ballpark May Be Contaminated", which doesn't actually have anything to do with the story because even the story itself says that the ballpark already had its environmental cleanup, to the tune of $14 million. And the photo accompanying the story is of 70/100 I, not the 23 I Street site (which still has a Wendy's and a towing company on it).
UPDATE: The Examiner's reporter has quickly written me to say that he didn't get the story from here.
UPDATE II: And now the headline is changed to a not-altogether-better "Ballpark Area Contaminated," which still sounds like the article is talking about the ballpark and its surroundings being contaminated. "Area Near Ballpark Contaminated" would have worked just splendidly.
 

A notice in this week's District Register says that JPI has applied to remediate the land it recently purchased at 23 I Street, as part of the District Department of the Environment's Voluntary CleanUp Program. Quoting: "The application identifies low to elevated levels of Total Petroleum Hydrocarbons (TPH) and Benzene in soil and TPH, Benzene, and methyl tertiary-butyl ether (MTBE) in groundwater." JPI is planning a 420-unit residential building with ground-floor retail on the site, with construction expected to begin sometime in 2008. The VCP application for 23 I is not yet online, but you can see JPI's 2005 application for 100 I Street and the city's 2006 application to clean up the stadium site to get the idea.
More posts: One Hill South, One Hill South, jpi, Square 697n, Nationals Park
 

According to GlobeSt.com (story free for seven days), JPI as expected has completed acquisition of the eastern two-thirds of the block bounded by I, K, Half, and South Capitol, comprising the Wendy's lot and the lot to its east, with plans to build what is being called "Jefferson at the Ballpark," a 416-unit residential building at 23 I Street. This will be JPI's fourth building on I Street, joining 70/100 I and 909 New Jersey, which are all already under construction. Construction on 23 I is expected to begin in August 2008, and will raise JPI's total number of units in Near Southeast to 1,350. According to the article, this building will be "green," and will have a dog run and large open courtyard. For what the block currently looks like, check my not-terribly-exciting 23 I page. When the DC Property Sales database ends its summer vacation (apparently even web sites get to take August off in Washington), I'll tell you how much JPI paid for the 43,313-sq-ft lot, last assessed at $21.7 million.
 

The folks at ADC Builders have passed along to me a new rendering of the Velocity Condos building planned for 1025 First Street (on the Square 699N block), which you can see on my Velocity page. Digging has now begun on the underground parking that will be shared by both this Velocity and its Phase II sibling; and within the next week you should see banners advertising the project hung on the fences surrounding the site. Work is continuing on the sales center trailers at Half and K, and it's projected to open in late July or early August. And the official web site, as I posted last week, is now "Coming Soon", but should be launched later this month. And, in answer to the question everyone *really* wants to ask, it's expected that the 200 units will start in the $300s; completion is expected in 2009. With all of this, I've now moved Velocity to a coveted "Under Construction" slot on my project directory.
So, on the New Development Tote Board, we're now loooking at 950 new residential units delivering in Near Southeast in 2008, and at least 800 in 2009 (not counting Capitol Quarter). And I can envision another 800-plus in 2010 (with JPI's 23 I Street and the residential projects at The Yards the likely candidates). Maybe someone will build a grocery store by then!

More posts: Square 697n, Square 699n, Velocity Condos
 

The speed of events is leaving me breathless these days. Today JPI held a groundbreaking ceremony at 909 New Jersey Avenue, where digging is about to get underway for the 237-unit residential building to be built on that block (former home of the Nexus Gold Club). You can see the obligatory photos of Dignitaries-With-Shovels here. (Yes, I did get my invite after all. Thank you!)
But there was big news tucked into the press release touting what JPI is now calling its "Capitol Yards" neighborhood along I Street (with 70 and 100 I Street across the way from 909 New Jersey about to sprout out of their deep hole): the announcement of plans for 23 I Street, a fourth JPI residential project on I Street, slated to have 421 residential units and as much as 35,000 square feet of retail space. Its location would be on the south side of I Street between Half and South Capitol, from Half over to (and including) the current Wendy's lot. (The moribund Exxon station does not currently appear to be part of the plans.) Construction wouldn't start before 2008. I haven't added it to my main map yet, but I've put up a few boring shots of what the block looks like as of now.
With that, the number of not-spoken-for lots in Near Southeast has just about dwindled to zero. Pretty much there's the block on New Jersey across from Capitol Hill Tower (though Akridge now owns a portion of it), the Exxon at South Capitol and I if JPI doesn't grab it, and the Metro Chiller Plant on the southwest corner of Half and L, which might not be made available anytime soon. (And I'm assuming that the rumors of Monument Realty picking up the Sunoco site at 50 M are true.) Everything else west of 7th Street is now spoken for. So if you were hoping to make your millions in Near Southeast and you haven't already staked your claim, your time's just about up, unless you can wrest some parcels out of some other developer's hands.
UPDATE, 6/11: Five days later, here's the Post's blurb on Capitol Yards.
 
31 Posts:
Go to Page: 1 | 2 | 3 | 4




                  © Copyright 2024 JD.