Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: square 697
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


88 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9

The breadth of construction around Near Southeast is now so vast that I'm forced to break my photo sojourns up into multiple sessions. Today's batch includes a few from the eastern side of the stadium, which are somewhat hard to come by these days--make sure to see the second photo down on the Stadium Exterior Construction Gallery, which shows the red stars that were added to the scoreboard in the past few days as part of the installation of the clock. (The "Nationals" lettering is cool to see as well, even if it's backwards.) The rest of the new stadium photos are more toward the bottom of the gallery (look for the icon) and on the First Street and N Street expanded galleries, but I'm planning to take a complete batch of photos of the western side of the ballpark on Sunday.
There's also the usual updates to the project pages for residential projects 70/100 I and Onyx on First and the 100 M Street office building, as well as plenty of other vantage points that can be seen on the expanded galleries or on the see-'em-all-on-one-page output. Try not to be blinded by the incredibly blue sky when looking at these shots, and cross your fingers I get that weather again on Sunday.
I've also got one not-so-good comparison showing the slow progress on the demolition of the GPO building at The Yards, though fences and construction vehicles are making it very hard to get good shots of what's going on there.
I did also notice that the DC Foreign Car garage on K west of Half is definitely now abandoned, sometime within the past month or so. No "we've moved" sign is up anywhere, and so it's possible that it's been a number of weeks since they closed, but now all the windows and doors are busted, so it was obvious even to my sometimes-distracted brain. Opus East has said they're planning to start construction on 1015 Half Street in October, which would mean this garage should be gone before much longer.
Tune in tomorrow for the next batch.

 

Today's print edition of the Washington Business Journal (online for subscribers only) reports that CNN, wanting 80,000-100,000 sq ft of space to upgrade its studios, is looking at three in-development office buildings in Near Southeast: Opus East's 440,000-sq-ft 1015 Half Street, at the old Nation site, which is scheduled to begin construction in October; Lerner's 320,000-sq-ft 1000 South Capitol right next door, which has no announced start date; and Ruben Companies' 350,000-sq-ft 1100 South Capitol, one block to the south. "Sources familiar with the search say the sites were picked for their views of the Capitol, access to transportation and the opportunity to build a structure designed to fit CNN's needs instead of retrofitting an existing building." It should be noted that WBJ also wrote back in late March that CNN (and other companies) were looking at Near Southeast.
 

According to GlobeSt.com (story free for seven days), JPI as expected has completed acquisition of the eastern two-thirds of the block bounded by I, K, Half, and South Capitol, comprising the Wendy's lot and the lot to its east, with plans to build what is being called "Jefferson at the Ballpark," a 416-unit residential building at 23 I Street. This will be JPI's fourth building on I Street, joining 70/100 I and 909 New Jersey, which are all already under construction. Construction on 23 I is expected to begin in August 2008, and will raise JPI's total number of units in Near Southeast to 1,350. According to the article, this building will be "green," and will have a dog run and large open courtyard. For what the block currently looks like, check my not-terribly-exciting 23 I page. When the DC Property Sales database ends its summer vacation (apparently even web sites get to take August off in Washington), I'll tell you how much JPI paid for the 43,313-sq-ft lot, last assessed at $21.7 million.
 

Two more pieces about Opus East's purchase last week of the Nation site at 1015 Half Street; the Washington Business Journal today has a pretty straightforward brief, while yesterday's Washington Times has a longer piece that also discusses the Near Southeast commercial real estate market. (But there's one small quibble with the second sentence of this piece: "Although office buildings are nothing new for Opus East, building one on speculation in Southeast is unusual" is kinda sorta forgetting about Opus's 100 M Street project a mere two blocks away.)
Of course, when you read these (and the others), don't forget who first brought you the news about the sale, back on Monday.
 

GlobeSt.com has a piece (free for seven days) on Opus East's purchase of the Nation site at 1015 Half Street--not really anything new from what I posted on Monday (441,000 sq ft, construction starting in October, $41.5 million price tag) except that the developers will apply for LEED Silver certification on the project (i.e., it'll be a "green" building). But mainly I'm using this new article as a hook to mention that Opus has put its 100 M Street building on the market as part of a three-building Class A office building portfolio (see Grubb and Ellis's listings here, which include this portfolio.) From what I understand, Opus would stay on as developer until the certificate of occupancy on 100 M is obtained. Looks like the deadline for offers is tomorrow, so get your checkbooks out.
 

The word has arrived that last week the rumored sale of the old Nation nightclub site at 1015 Half Street was completed, with Opus East (backed by institutional investors) paying a rumored $41.5 million for both the land and the existing plans for a 411,000-sq-ft office building. The fine folks at Opus tell me that they are planning to start construction (on spec) in October, with delivery of the building by October 2009. You can see a rendering of the glass-a-riffic building, which will front Half, K, and L streets, on my 1015 Half Street page.

 

Today's print edition of the Washington Business Journal has an article summing up what's going on right now with various commercial projects around Near Southeast. (The online article is for subscribers only for the first 30 days; sorry.) Here are the new items:
* William C. Smith is planning to hold off breaking ground on its 200,000-sq-ft building at 250 M Street until it pre-leases at least 30% of the building.
* Opus East has leased 80,000 sq ft at 100 M Street (33% of the building) to government contractor Parsons Corp.
* Lerner's 20 M Street does not as yet have any office tenants.
* It also mentions that Opus East is planning to build the 440,000-sq-ft office building at 1015 Half Street (the old Nation site) on spec; but it should be noted that Opus hasn't yet officially announced its purchase of this property or its plans.
(The article also summarizes what's going on at Florida Rock, using some source materials that are hard to find anywhere other than here at JDLand. Note to reporters and other professionals using my site: yup, lots of stuff is posted here, and it's all free, but be a grownup and say where you found it.)
In addition, there's an ad in the print edition giving us our first peek at the Shalom Baranes design for 1100 South Capitol Street, Ruben Companies's planned 350,000 sq ft office building on the southeast corner of South Capitol and L. There's currently no timeline for development of this project.
The print edition also has a piece written by GSA about the US Department of Transportation completing its move to its new headquarters at New Jersey and M. It describes the HQ's interiors and exteriors, and mentions that this project is the largest lease ever executed in DC.

 

The folks at ADC Builders have passed along to me a new rendering of the Velocity Condos building planned for 1025 First Street (on the Square 699N block), which you can see on my Velocity page. Digging has now begun on the underground parking that will be shared by both this Velocity and its Phase II sibling; and within the next week you should see banners advertising the project hung on the fences surrounding the site. Work is continuing on the sales center trailers at Half and K, and it's projected to open in late July or early August. And the official web site, as I posted last week, is now "Coming Soon", but should be launched later this month. And, in answer to the question everyone *really* wants to ask, it's expected that the 200 units will start in the $300s; completion is expected in 2009. With all of this, I've now moved Velocity to a coveted "Under Construction" slot on my project directory.
So, on the New Development Tote Board, we're now loooking at 950 new residential units delivering in Near Southeast in 2008, and at least 800 in 2009 (not counting Capitol Quarter). And I can envision another 800-plus in 2010 (with JPI's 23 I Street and the residential projects at The Yards the likely candidates). Maybe someone will build a grocery store by then!

 

The speed of events is leaving me breathless these days. Today JPI held a groundbreaking ceremony at 909 New Jersey Avenue, where digging is about to get underway for the 237-unit residential building to be built on that block (former home of the Nexus Gold Club). You can see the obligatory photos of Dignitaries-With-Shovels here. (Yes, I did get my invite after all. Thank you!)
But there was big news tucked into the press release touting what JPI is now calling its "Capitol Yards" neighborhood along I Street (with 70 and 100 I Street across the way from 909 New Jersey about to sprout out of their deep hole): the announcement of plans for 23 I Street, a fourth JPI residential project on I Street, slated to have 421 residential units and as much as 35,000 square feet of retail space. Its location would be on the south side of I Street between Half and South Capitol, from Half over to (and including) the current Wendy's lot. (The moribund Exxon station does not currently appear to be part of the plans.) Construction wouldn't start before 2008. I haven't added it to my main map yet, but I've put up a few boring shots of what the block looks like as of now.
With that, the number of not-spoken-for lots in Near Southeast has just about dwindled to zero. Pretty much there's the block on New Jersey across from Capitol Hill Tower (though Akridge now owns a portion of it), the Exxon at South Capitol and I if JPI doesn't grab it, and the Metro Chiller Plant on the southwest corner of Half and L, which might not be made available anytime soon. (And I'm assuming that the rumors of Monument Realty picking up the Sunoco site at 50 M are true.) Everything else west of 7th Street is now spoken for. So if you were hoping to make your millions in Near Southeast and you haven't already staked your claim, your time's just about up, unless you can wrest some parcels out of some other developer's hands.
UPDATE, 6/11: Five days later, here's the Post's blurb on Capitol Yards.
 

What a beautiful day! And with that weather, what luck that I had arranged some trips high up into a few of the tall buildings around the neighborhood to get new shots of the latest demolished lots and holes in the ground. I've uploaded these new pictures From Above and matched them with "before" shots on a whole slew of pages (you might have to scroll a bit to see the new pictures): Nation/1015 Half, the old Edge/Wet block on Square 699N, the North of M overview page, the Monument Half Street page (that's a biiiiig hole in the ground), the 100 M/Onyx on First page (where the construction on the Onyx end of the block is getting close to street level), 70/100 I Street, 909 New Jersey (showing the A1 garage all alone) and even the Stadium Construction Gallery (waaaaaay at the bottom, with a view from just a bit to the side of Dead Center Field, albeit four blocks away). I also created a new Overhead Photos page, showing all the ones I've posted on the site, grouped together by location. And I also created a special view with larger-than-usual pictures from today (don't miss it!), because it was so beautiful and you really could see forever from those high-up locations, and I wanted people to be able to see more than just little specks of buildings.
 
88 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9