Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: square 697
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


88 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9

I've finally uncovered a roundabout way to find out about pending raze permits (right now, raze permit applications are not tracked or listed in any way on DC.gov--waaah!). The city's Historic Preservation Office sends out via e-mail weekly permit reports for the entire city (the HPO is contacted by the Department of Consumer and Regulatory Affairs to confirm that building/raze permits aren't for buildings with some landmark status or other hold). Recently mailings have indicated that raze permits are in process for 1015 Half Street (Nation) as well as most of the buildings on Monument Realty's properties along Half, N, and South Capitol Streets (26, 30, 32, and 68 N Street, 1241 and 1243 Cushing Place, and 1236 South Capitol). This reports from HPO don't mean that razing is imminent (for instance, the Monument Realty raze permit requests came through HPO in mid-October), but do show that plans for demolition are more than just theoretical. UPDATE: I knew I forgot something when I posted this; I meant to include that, while I haven't seen a raze permit, a correspondent has reported that tenants told him that the beige brick building at South Capitol and O SW is scheduled to be demolished just after the New Year, to make way for the 1325 South Capitol 244-unit residential building.

 

WDG Architecture updated its web site recently to include a rendering of 1015 Half Street, the 440,000-sq-ft office building by Potomac Investment Properties slated for the Nation site at Half and L. (I'd give a link directly to their page on 1015 Half, but like so many architecture firms, their site is so overly Flash'ed that there's no way to get you there.) They also had a rendering for 1325 South Capitol Street, the 244-unit residential project across from the stadium by Camden Development. (As expected, I'm wavering in my resolve to stop my coverage at the South Capitol Street median, and will now track anything that fronts South Capitol, even if the address is in Southwest.) These renderings--along with the one I found last week for 1000 South Capitol (the proposed 320,000-sq-ft office building by Lerner Enterprises on the same block as Nation)--spurred me to do some freshening of both my North of M and South Capitol Street pages, adding a lot of new photos and views.
 

Appearing on the north side of the Nation building at Half and K within the past few days, a sign saying "Coming Soon", 440,000 sq ft of office space, with a phone number for Cushman & Wakefield. So it appears that Potomac Investment Properties (owner of the site) is continuing to move forward on the long-planned 1015 Half Street office building in this spot. But will they wait for a tenant before beginning construction?

More posts: 1015 Half, square 697
 

Nation, the nightclub at Half and K, is closing its doors after Saturday night, and the Washington Blade has a look back at VelvetNation, the Saturday night gay dance party. I've not heard anything on when the building might be demolished, or when construction might start on 1015 Half Street, the 250,000-sq-ft office building planned for that site by Potomac Investment Properties (the people who brought you 300 M Street). Check my North of M page for information and photos about that little slice of Near Southeast.
More posts: 1015 Half, Restaurants/Nightlife, square 697
 

The Exxon at South Capitol and I streets has apparently shut down--a correspondent reports that the building is boarded up, and their phone number has been disconnected. Their page on exxonstations.com says "Temp. Closed", but it would seem odd that a temporary closing would result in a disconnected phone number. I've heard nothing about a sale of that property, but certainly it could be considered a somewhat prime location (although that's a ghastly intersection). Will pass along more as I find out.
UPDATE: From another very on-the-ball correspondent, a link to a DOJ press release from January detailing that the Exxon's owner pleaded guilty "to fraudulently double-billing government contractors more than $120,000. [Mahmud] Rashid, 46, of Raleigh Lane, Stafford, Virginia, entered a plea of guilty yesterday in United States District Court to one count of wire fraud. According to the terms of the plea agreement, Rashid could be sentenced to between 12 to 18 months of incarceration when he is sentenced before the Honorable Richard J. Leon on June 2, 2006." As my correspondent noted, "this might help shut down your gas station."
 

It's not posted yet, but I've gotten a peek at the agenda for the April ANC 6D meeting, this Monday the 10th, and it's chock full of Near Southeast goodness. There will be a presentation by the DC Sports and Entertainment Commission on the immediate plans for the baseball stadium; then there are presentations on three projects in the pipeline: the Opus East 250,000-sq-ft office building at 100 M Street (the fractious debate at previous meetings over a request to close two alleys on the block for this project has really been jaw-dropping); the JPI project at New Jersey and I; and another request for alley closings (have fun with that, fellas!) for 1000 South Capitol Street. This project is a 320,000-sq-ft office building that Lerner Enterprises has had on the boards for a number of years, and so they appear to now be beginning to move forward with it. It's on the same block--and backs up to--Nation, where Potomac Investment Properties is also now moving on its long-planned 250,000-sq-ft office building at 1015 Half Street. UPDATE: The agenda is now posted.
 

The Washington Blade's "D.C. law may block O Street clubs from moving" discusses the current state of affairs for the gay nightclubs in Near Southeast, from the ones in the footprint of the new baseball stadium (like Ziegfield's, Secrets, Follies, Heat, and others) to the ones along K Street (Wet, Edge, plus all-orientation Nation). The ones within the stadium footprint say that a law on the books intended to help them may actually prevent them from moving outside of their current area. Meanwhile, Wet and Edge at Half and K have been told they must vacate this year in order to make way for Ron Cohen's mixed-use project on that block. As for the fate of Nation, I've heard nothing about the existing plans moving forward for a 10-story office building on that site--the building permit was filed more than a year ago, although Potomac Investment Properties indicated at the time that they just wanted to be ready for when the time was right to begin building. However, construction materials and fences have been spotted around the Nation building, and their published events calendar is pretty sparse (plus their concert line hasn't been updated since early November) leading folks to wonder if something is indeed afoot. (If someone wants to whisper about any of this to me, I'll listen!)
 

A building permit application was filed in late August for a $20 million project at 1015 Half Street, SE. Although that particular tax parcel is owned by Potomac Investment Properties, the entire rest of the same block (bounded by K, Half, L, and South Capitol) is owned by Lerner Enterprises, and would seem to be the same location as the 1000 South Capitol project listed on Lerner's web site, a 250,000 sq ft office building. One way or the other, does this spell the end of Nation, the music and dance club currently occupying that block? See my South Capitol Street Corridor page for photos.

More posts: 1000 South Capitol, 1015 Half, square 697
 
88 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9