Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Douglass Bridge
See JDLand's Douglass Bridge Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


139 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 14
Search JDLand Blog Posts by Date or Category

Some items from the past few days. Big ones first:
* It's probably been true for weeks, but I've just now been by Diamond Teague Park for the first time in a while and can confirm that construction is definitely underway there. Fences are up, cranes (three of them?) are in place, and workers were there. Pictures tomorrow. (Probably *lots* of pictures tomorrow from all over, as long as the weather stays reasonably clear.)
* City Paper got its hands on the letter Mayor Fenty sent to DC Delegate Norton about the city's priorities should the Feds decide to toss some stimulus package dollars in this direction. As I predicted, the two Near Southeast bridge projects were mentioned: "In particular, aspects of the Eleventh Street and South Capitol Street Bridge replacement projects could be undertaken immediately." He also mentions the city's backlog of maintenance projects, along with investments in Metro and the implentation of the streetcar project. And school modernization. And public safety issues.And environmental initiatives. And housing affordability. And health care. (And now here's the stimulus bill itself, though it doesn't get down into specific projects. On the other hand, considering these two bridges ease the commutes to and from the district of the House Majority Leader....)
* Back in mid-November, the transfer of the plot of land known as Reservation 17A from the Feds to the city finally took place; it runs between New Jersey Avenue and Second Street, and is straddled by the trash transfer station building. With this now under District control, various wheels can start turning in that area, including allowing the establishment of I Street between Second and New Jersey that will form the southern boundary of WC Smith's 800 New Jersey Avenue project. There's hopes that the trash transfer station could be demolished in 2010.
* Reader T. reported yesterday that a small bought-at-the-hardware-store For Sale sign went up at 10th and M yesterday, in front of the fence of the Exxon station. I'm not sure what the deal is, since the land is actually owned by the Exxon Corporation, and you'd think they'd have better methods of marketing the land.
* The public notice for the March 19 Zoning Commission hearing on various Capper PUD alteration requests is now available.
* WBJ reports that the Nationals have parted ways with Centerplate, last year's concessionare at the ballpark. This year it will be Levy Restaurants for the food and Facility Merchandising Inc. for the retail.
* More of the fences are coming down at 55 M, as you can see on the web cam. (Though it took me more than a month to notice that the plywood "tunnel" at the Metro exit had disappeared.)
* The Douglass Bridge will be closed at 5 am Sunday until 10am-ish to test the swing span.
 

On January 7, the city and federal agencies working on the various Anacostia Waterfront projects held their first "Interagency Coordinating Council" briefing of 2009, and were kind enough to post the PowerPoint slides (28 MB!) at theanacostiawaterfront.com. A number of Near Southeast projects are part of this domain, including South Capitol Street, the Frederick Douglass Bridge, and the 11th Street Bridges. Let's start with South Capitol Street, where the final designs for the reconfiguration of South Capitol Street (under the South Capitol Street EIS) appear to have been chosen (the "Final EIS Preferred Alternative"):
* The top headline is that the new Douglass Bridge is apparently going to be an arched bascule design (like the Memorial Bridge), with an opening span to allow for larger vessels to sail through.
* There will be a large traffic oval at the foot of the new bridge (which will be located to the south of the current bridge), reshaping the intersection of South Capitol Street and Potomac Avenue. (The ballpark's Home Plate Gate and entrance promenade will be the northeast edge of the oval.)
* The intersection of South Capitol Street and M Street will become an at-grade intersection (no more underpass for through traffic).
* There will be modifications to South Capitol's interchange with the SE/SW Freeway. They aren't specified in this document, but based on my previous readings of the Draft EIS, I believe the final design will remove the existing ramp that begins at I Street with an at-grade intersection underneath the freeway that would have two left-turn lanes to a new ramp. With the removal of the existing ramp to I-395, the intersection at South Capitol and I would also be reconfigured.
* The northern section of South Capitol Street will match the reconfigured portion between N Street and Potomac Avenue, as a six-lane boulevard with a median and wide sidewalks.
* They expect to get a Record of Decision on the Final EIS from the Feds this fall. There's nothing in this document about a start date.
(Hopefully I'll find out more about the final EIS at Tuesday's ANC 6B meeting, so look for additional details on all of this in the coming days.)
As for the 11th Street Bridges, the file says that a demolition contract will be awarded this month for the decommissioned ramps to and from RFK, with the work expected to take place this spring. As for the big work to reconstruct the bridges, the city expects to choose a design/build team and have a contract with them by June 1, with the entire project slated to be completed by the end of 2013.
The PDF also has quick updates on the Anacostia Streetcar Project, the MLK Great Streets Initiative, the Anacostia Riverwalk Trail, the Parkside Pedestrian Bridge in Ward 7, and a new traffic circle at Pennsylvania and Potomac avenues. It's also got some good general bullet points on the South Capitol and 11th Street projects if you haven't been following up to now. I just hope you have a high-speed connection to download the entire 28-MB file. Otherwise, go get some lunch.
UPDATE: I've taken a little time to give both my South Capitol Street and Douglass Bridge pages a makeover with the new information (and boy, they needed it)--there's now some graphics pinched from the Draft EIS that do a better job explaining what the future plans are. I'd also suggest reading the executive summary of the 2008 Draft EIS, with the knowledge that most of the Design Alternative #2 options apparently have been chosen for the final design. It's a fair amount of detail, but worth it if you want to know how the project has reached its current state, and what's coming in the future. As I said, more to come as the city briefs neighborhoods and groups on the final EIS.
Comments (0)
More posts: Douglass Bridge, streetcars, Traffic Issues
 

This afternoon the Secret Service and local jurisdictions released the Inauguration Joint Transportation Plan (the list of street closings and restrictions), and a map that shows the main closures and restrictions around the Mall, as well as where visitors will be able to enter the Mall and the parade route. I'll let the major media outlets dissect what it means city-wide, but for Near Southeast, here's the early scoop:
* The Southeast-Southwest Freeway, the 11th Street Bridges, and the South Capitol Street (Frederick Douglass) Bridge will be restricted to buses and authorized vehicles only.
* Although no streets in Near Southeast are specifically listed in the Secret Service's batch of street closings, that doesn't mean that they aren't going to be a whole bunch of closures. I mentioned a few days back that much of Near Southeast will be bus-only parking, and apparently the specific streets have now been decided on. And, according to the city's web site on Inauguration Day Street Restrictions, the Emergency No Parking Zones will be established starting at 3 pm Monday, Jan. 19, with the streets then being closed beginning at 12:01 am Tuesday Jan. 20, through 12:01 am Wednesday, Jan. 21 to vehicular traffic except for "charter buses, metro buses, taxis, postal vehicles, law enforcement vehicles and emergency vehicles, as well as residents with government issued identification or vehicle registration showing residency inside the restricted area" (emphasis mine).
It would be great if they posted a map, because the lists of streets are pretty hard to work with. It looks like M Street and Virginia Avenue will be closed to Ninth Street, Half and First will be closed from I Street to N Street, New Jersey will be closed from I to M, and I, K, and L, will be closed to Sixth Street. So, this would mean that north/south streets from Third eastward will be open between M and the freeway.
* There's also this on the city street closure page, which I can't quite decipher: "The following access points have been identified as pedestrian-only routes to the National Mall: [...] East Capitol Street, NE to North Carolina, SE to New Jersey Avenue, SE to I Street, SE." I guess this means these streets will be closed to traffic and will be where pedestrians are funneled to? (But then, where to? Up South Capitol?) Like I said, I need a map!
More to come, I'm sure, especially once all the media's mapmakers get on the case.
My advice? Do what I'm going to do--pretend there's a snowstorm a'comin, get a week's worth of provisions ahead of time, and just hunker down until Wednesday, with no plans to go anywhere except on foot.
 

New Year, New Meetings:
* ANC 6B (mostly Capitol Hill, but also including the Eighth Street area of Near Southeast) has posted its January 13 meeting agenda, and one of the items on it is "South Capitol Street Draft Environmental Impact Statement." This draft EIS, which envisions substantial changes to the section of South Capitol Street from the Southeast Freeway across the Douglass Bridge to Firth Sterling Avenue, was released last year, and at December's Anacostia Waterfront Fair it was announced that the final EIS is expected to come this spring.
It may not sound like much to get excited about, but one of the cornerstones of the final EIS should be the unveiling of the chosen design for the new Douglass Bridge. I wrote a long entry about the Draft EIS when it was released, and on my Douglass Bridge page you can also see the four preliminary designs. (And you can also relive 2007's Extreme Makeover!) Feel free to sound off in the comments on which bridge design you want--but, please, no wagering.
Also on ANC 6B's agenda is "ZC # 03-12I/03-13I, Modification to the Arthur Capper Carrollsburg PUD," which I imagine is the series of deadline extensions and other zoning items that I've previously written about. (UPDATE: This has apparently been removed from the 6B agenda, at the Housing Authority's request.)
This meeting is at the Old Naval Hospital, 921 Pennsylvania Ave., SE, at 7 pm.
* ANC 6D's monthly meeting will be on the previous night, Jan. 12, at St. Augustine's Church at 6th and M Streets, SW. No agenda yet posted. (6B usually wins this race by a country mile.)
* This Thursday (Jan. 8), Metro's Customer Service, Safety and Operations Committee will be voting on whether to authorize a mid-February hearing on the discontinuation of the N22 bus, which runs between the Union Station, Eastern Market, and the Navy Yard subway stations and which is expected to be replaced by DC Circulator route. I'm not sure why this is on the agenda again--my understanding was that they approved it in December, as did the full board. Read my previous posts with more detail on this change here and here.
 

Piling a bunch of stuff together, again:
* Just posted on its Housing Complex blog (and in this week's print edition), the City Paper takes a look at the "Capitol Riverfront," both in the attempts to brand the neighborhood and in how empty it currently is (the subhed for the piece says "Developing a Name for the Southeast Waterfront Is Easier Than Actually Developing It" ).
UPDATE: I should also mention that Housing Complex has also posted occupancy numbers for the new buildings in Near Southeast: 70 and 100 I are 18 and 14 percent leased, Onyx is at 8 percent, Capitol Hill Tower is at 75 percent, Capitol Quarter Phase I is sold out, and Velocity is 25 percent sold.
* Reader J. reported yesterday that interior work seems to have begun at the old dialysis building at 900 M Street. They're rehabbing the interior and the exterior to create three retail storefronts, though no tenants have been announced yet.
* The Douglass Bridge is having another early-Sunday-morning-closure on the 14th.
* Planners are trying to figure out where to put all the charter buses coming to town for the inauguration. I'm guessing that the surface parking lots all around Near Southeast are going to be pretty enticing.
* The WBJ picks up on what I reported last week about 810-816-820 Potomac Avenue going up for sale in a sealed bid.
* One more add: Dr. Gridlock reports that Metro will be testing more eight-car trains on the Green line.
 

This morning Mayor Fenty held a press conference at Nationals Park with various city officials to highlight tomorrow's Anacostia Waterfront Information Fair, and also talk up the recent progress and near-term next steps for the more than $8 billion worth of economic development, transportation, and infrastructure projects in the pipeline along the Anacostia River (not only in Near Southeast, but from the Southwest Waterfront all the way up past RFK).
Having sworn off taking any more photos of The Mayor at the Microphone (unless he shows up in a Hawaiian shirt and swimtrunks or something), I decided to record the 20-minute event instead, so that the five or six of you interested in hearing the remarks can do so. (It's a 2.6-mb MP3 file; the first few seconds are rough, but then it settles in.)
If you listen, you'll hear how the mayor managed to cajole the notoriously camera-shy Stan Kasten into saying a few words about what's happening along the river and in the neighborhood from the point of view of the area's largest tenant. Deputy Mayor Neil Albert, DDOT Director Frank Seales, Office of Planning head Harriet Tregoning, and the director of the city's Office of the Environment George Hawkins spoke as well. There was some discussion throughout (and especially at the end) about how the slowing economy might be impacting both the city's plans and developers' projects, but the mayor remains optimistic.
The press release from the mayor's office sums up the main points of today's event, but here's the Near Southeast-specific highlights from both the remarks and some other chatter of the day. First up, news of the three big parks:
The city "will break ground at Diamond Teague Park by the end of 2008." (And the guide for tomorrow's fair says that the park will be completed in spring 2009, which is the same date we've been hearing for a while.) The mayor also touted the operating agreement with Forest City Washington to build and maintain the $42 million, 5-acre Park at the Yards (but you knew about this already), as well as the the agreement with the Canal Park Development Corp. to build the $13.1 million, three-block-long park. (No mention of school buses.)
Then there's the bridges: Reconstruction of the 11th Street Bridges is scheduled to begin in mid-2009. (The shortlist of firms vying for the design-build contract was announced a few weeks ago.) Whether we actually see heavy equipment moving in mid-2009, or whether this just marks the first part of the design-build project is not quite clear. I was also told that the contract to demolish the flyover ramps to and from RFK could be completed soon, and that demolition would happen not long after the contract is signed.
Plus, the final Environmental Impact Statement for South Capitol Street and the Douglass Bridge is expected in spring 2009; that's when we'll hear which of the four bridge designs has been chosen.
As for the river itself, the city has started real-time water quality monitoring, updated automatically online 24 hours a day. There's also now the Anacostia 2032 Plan "to make the Anacostia River boatable, swimmable, and fishable in 25 years." And a Green Summer Jobs Corps was created earlier this year to "engage youth in the cleaning and greening of District neighborhoods and parks and to introduce them to green-collar job opportunities."
Finally, a planning process is underway to revamp Boathouse Row, the stretch of boat clubs along the Anacostia between 11th Street and Pennsylvania Avenue. (I took a bunch of photos near the boathouses a few months back, and have been lazy about ever getting them posted, though you can see a few boathouse-free shots of the environs here and here.)
There's more about projects elsewhere along the Anacostia, but other bloggers get to cover those. Will update this post if there's any media coverage from today's event, and will have a fresh post on Saturday after the fair. I imagine I'll Twitter a bit from those festivities (like I did from today's); remember that if you aren't a Twitter-er, you can read my tweets on the JDLand homepage--check 'em out frequently, because I do sometimes post news there first, before I write full blog entries.
SATURDAY FAIR UPDATE: They're now going to be providing free shuttle bus service from the New Jersey & M Metro entrance to/from the ballpark, from 12:30 pm to 5:15 pm. (After they heard somewhere that the Half and M subway entrance is going to be closed on Saturday.)
 

Doesn't look like Saturday will be a good day for taking pictures, and Sunday I'll be welded to the sofa watching the US Open, so this will have to tide you over to next week:
* WalkingTownDC has announced its fall lineup, and once again "Capitol Riverfront" is one of the tours, led by Michael Stevens, the executive director of the Capitol Riverfront Business Improvement District. It's Saturday, Sept. 20, starting at 10:30 am. More info here.
* DDOT says that, weather permitting, the Douglass Bridge will be closed from 6 am to as late as 10 am on Sunday morning for some minor repairs: "Crews will be making minor repairs necessary to improve movements of the swing span that occur during the periodic opening of the bridge."
* If you've snuck a peek at the recent building permit applications and are wondering if the application for 1111 New Jersey Avenue means that Donohoe is close to getting started on their planned 200,000-sq-ft office building, I've already done the wondering for you, and the answer is "no"--just getting the paperwork out of the way. (Longtime readers will remember that the first building permit applications for 1015 Half Street were submitted more than three years before construction got underway.)
* Speaking of the building permit data, the feed for approved permits has been down since the end of July. The folks who handle the feeds assure me that it's being worked on, and will hopefully be back before too long.
* Apropos of nothing, here's a Washington Times story from Monday about the groundskeepers at Nationals Park.
Comments (0)
More posts: Events, Douglass Bridge, Traffic Issues
 

From DDOT: "The District Department of Transportation (DDOT) will be conducting operational testing of the swing span of the Frederick Douglass Memorial Bridge, a.k.a. South Capitol Street Bridge this weekend beginning on Friday, May 16th at 10pm. To conduct a full operational test of the swing span, and ensure the safety of motorists and workers, the bridge must be closed during the testing activity. The initial closure is scheduled for Friday evening, May 16th from 10pm - 5am, weather permitting. If all results return positive no further closures will be necessary. The rain date is scheduled for Saturday from 10pm - 5am. Motorists will be detoured to the 11th Street bridges. Variable Message Signs will be posted along the north and south bound routes leading to the bridge to alert drivers to alternate routes."
Comments (0)
More posts: Douglass Bridge, Traffic Issues
 

From DDOT, word that testing of the swing span of the Douglass Bridge necessitates some nighttime closures this weekend. "To conduct a full test of the swing span, and ensure the safety of motorist and workers, the bridge must be closed during the testing activity. The first closure is scheduled for Friday evening, April 18th from 10 pm to 5 am. If all results return positive no further closures will be necessary. However, if minor adjustments are found to be necessary, additional testing and closures will be conducted on Saturday from 10 pm to 5 am and repeated again with test-dependent closures scheduled for Sunday from 10 pm to 5 am. Motorist will be detoured to the 11th Street bridges."
Comments (0)
More posts: Douglass Bridge, Traffic Issues
 

* The Examiner writes about the Washington Area Bicyclists Association's look last week at the crosswalks and curbs at the US Department of Transportation HQ, which WABA says are not ADA compliant: "An inspection of the area Friday found security bollards blocking curb ramps, bus shelters with virtually no sidewalk access, and multispace parking meters inaccessible to people in wheelchairs. Also, several crosswalks at non-signalized intersections feed into curbs with no access ramp[.]" DDOT says that the crosswalk at Second and M is not supposed to be used anymore (since there is a fully compliant crosswalk just to the west at New Jersey Avenue) and will be sending crews to take away the crosswalk marks.
* City Paper continues its saturation coverage of the Positive Nature youth program at 1017 New Jersey with video from Saturday's rally. The organization is trying to stave off eviction thanks to the huge increase in its property taxes.
* WAMU has posted the audio of its piece on last week's rededication of the Douglass Bridge. The city's Cable 16 channel should be adding it to its lineup soon. You can watch the press conference on the new on-street parking regulations near the ballpark in the meantime.
 
139 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 14
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.