Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Douglass Bridge
See JDLand's Douglass Bridge Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


139 Blog Posts Since 2003
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Search JDLand Blog Posts by Date or Category

This morning DDOT had a big press briefing about the plans for the coming Douglass Bridge "Extreme Makeover"; there was a gaggle of media in attendance, so I imagine there will be lots of play on TV tonight and in tomorrow's papers, so in the interest of time (mine, not yours), I'm going to hit the high points right now and wait for the reports from the big players to roll in for additional detail.
*The bridge will be shut down on July 6 (after the July 4 holiday). As soon as it's closed, crews will be on site beginning the demolition of the viaduct from Potomac Avenue northward, using "big shears" (DDOT's description) to drop it down. At the same time, the existing South Capitol Street will be ripped up, with infrastsructure and utility work done, and with the streetscape improvements started as well, which will include new "globe" lighting, a median with trees, etc. (Incidentally, by spring 2008 there will also be some sprucing up of the M Street overpass, with the chainlink fences removed and new historic iron railings installed.)
* It is expected that the 580 feet of the bridge from the Anacostia River to Potomac Avenue will begin to be lowered on July 20. They are going to put jacks under the bridge, cut the existing columns, and then lower it down. They should sell tickets for this part.
* The bridge itself will see its roadway milled, and the existing rails and chainlink fences replaced with a new special fancier railing; this railing will be affixed to the outside edge of the bridge, allowing the sidewalks on both sides of the bridge to be widened. (The bridge has already gotten a new paint job, have you noticed?)
* DDOT is creating an additional lane on I-295 between the Suitland Parkway and South Capitol Street to help improve the traffic flow.
* The closure of the bridge is planned for 60 days; however, the contractor (Corman) can receive up to $1 million in incentives if the work is finished sooner.
There are some new before-and-after renderings of what the approach to Potomac Avenue will look like, and I've added those to my Douglass Bridge makeover page, along with some photos taken on a barge tour today beneath the bridge. (You get to see the osprey nests!)
DDOT has also produced a spiffy video about the plans for the bridge (as well as information about a new Douglass Bridge, which is a few years and $300 million away from now); when they post it on their site, I'll link to it (UPDATED: now online). You'll probably see portions of it in tonight's media coverage. And just to warn you, a certain Near Southeast blogger puts in a very brief appearance, but don't let that prevent you from watching.
I'll update this entry as the day goes on with other media coverage.
UPDATE I: .... such as Dr. Gridlock's posting on the briefing, discussing the commuting impact of the closure. And the DDOT press release.
UPDATE II: And WTOP. And NBC. And ABC. But not a lot of news in any of them.
UPDATE III: Here's the Post and the Examiner.
UPDATE, 6/11: And another Examiner piece, focusing a bit more on the eventual new bridge. (But I wish their headline writer had correctly spelled "South Capit*ol*.")

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

From DDOT, a reminder that the last weekend closure of the outbound/southbound lanes of the Douglass Bridge (i.e., the South Capitol Street Bridge) is on tap, starting at 10 pm Friday June 1 and reopening sometime before the Monday June 4 afternoon rush hour. Of course, in a few weeks we'll all be dreaming of the days of mere weekend closures, when the bridge is closed in both directions for all of July and August for its Extreme Makeover, when "the bridge's elevated northern approach will be lowered to become an at-grade roadway with a new intersection at South Capitol Street and Potomac Avenue. Additional improvements will occur such as paving and painting the entire bridge. Ultimately, nearly three blocks of elevated roadway--which currently act as a barrier to access across South Capitol Street--will be removed and replaced with at-grade intersections that will help knit the neighborhood together."
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

For those of you who like to drive the loop around the stadium site to check out the latest progress, be advised that you can no longer go will often find the road closed north from Potomac Avenue on the mini-South Capitol Street that runs on the east side of the viaduct (pictures here); it's been closed as prep work gets underway for the lowering of the Douglass Bridge starting in July. The work now starting on the new Nationals office building that will run along the southern end of South Capitol Street (see my stadium renderings page for drawings) has spilled out into that access road from time to time over the past week or sol. If you don't make that drive yourself and are hoping for an update to my Stadium Construction Gallery, I'm somewhat hamstrung by the overcast weather this weekend (which makes for pretty icky photos), so unless there's a break in the cloud cover it may possibly be a few days before I add a new batch of shots.
Speaking of the bridge work, on June 7 DDOT is having a press briefing on the project, which they are now calling an "Extreme Makeover" -- hmmmm, I think I said that first ;-). The briefing will discuss traffic detours, construction plans and schedule, commuting solutions (such as Bridge Bucks), and the additional improvements to South Capitol Street that are coming. In other words, soon we'll finally get the details on how this is all going to shake out.
UPDATE: Apologies for the mix-up in the comments above about the street closure; it's open today, when no work is going on at the stadium site. And, just to repay you for that boo-boo, I went out and took pictures even though the sky is not bright blue; will probably have them posted tomorrow.

More posts: South Capitol St., Douglass Bridge, Nationals Park, Traffic Issues
 

I mentioned this in my preview of Thursday's WMATA board meeting, but then missed it in my summary of what happened, so we'll throw it over to the Post: "Fares on four Metrobus routes that will be detoured in July and August, when District officials will close the South Capitol Street Bridge for a major construction project, will be temporarily reduced, the Metro board said.The fare on the A9 route will go from $1.25 to 75 cents, and the express bus fare on the P17, P19 and W13 routes will drop from $3 to $1.25 during construction. The routes will temporarily end at Metrorail stations on the Green Line to help buses and commuters avoid traffic detoured by the bridge closing. The A9 (South Capitol Street Line) will end at the Anacostia station, and the P17, P19 (Oxon Hill-Fort Washington Line) and W13 (Bock Road Line) routes will end at the Southern Avenue Metrorail station."
The Post piece also briefly mentions the vote to move the Southeastern Bus Garage to DC Village, and you can read my entry from yesterday for more detail on how exactly the debate went, and also for links to various documents about the move. There was no word today that I've heard as to whether the city had reached a deal on moving the shelter beds currently at DC Village--remember, if that doesn't happen by Thursday May 31, the boards' approval vote of the move and the various next steps does not take effect. And you can listen to the archived audiocast of the meeting if you're especially interested.

More posts: Metro/WMATA, South Capitol St., Douglass Bridge, Traffic Issues
 

A couple weeks back I posted about DDOT's new "Bridge Bucks" program, which offers $50 per month toward transit fares and vanpool fees for people who will be affected by this summer's Extreme Makeover: Frederick Douglass Bridge. DDOT sent out a press release yesterday saying that the program has now launched, and you can visit the Bridge Bucks site for more details. Or, as I said then, avoid it all and just take a nice eight-week summer vacation; you could spend it camping at 4th and L.
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

On Thursday the WMATA board has on its agenda the approval of series of recommendations to continue moving forward on the plan to relocate the Southeastern Bus Garage from its current spot at Half and M to DC Village. The recommendations are the same as what came out of the Planning and Real Estate Subcommittee earlier this month to hold a public hearing on the project, advertise the Phase 1 construction contract, negotiate with the city to aquire the DC Village property, apply for a Federal bus facility grant, and authorize the sale of the garage and its parking lot (presumably to Monument Realty, though I've yet to see any official announcement that Monument was the source of the unsolicited offer in April for the property). The plan would then be to come back to the board in September with a land transaction agreement to be executed, and a construction contract to be awarded. As I've mentioned previously, WMATA is very much wanting to be out of the Half and M garage before the Nationals ballpark opens in March 2008. In addition to the documents for Thursday's meeting, the background documents from the May 11 subcommittee meeting also have lots of good detail on the proposed move, as do my last few entries on the subject.
And also on the agenda (good thing I scrolled down!) is a request to approve temporary changes in the routes and fares for the A9, P17, P19, and W13 bus lines during July and August's Extreme Makeover: Frederick Douglass Bridge. If you ride these buses, be sure to read what's being proposed, but the gist is that because the detour route's expected congestion would impact bus schedules, WMATA is proposing to temporarily end those bus routes at subway stations on the east side of the river, but reducing the fares to help offset the higher cost of riding the subway.
If you're really interested in this meeting, WMATA provides live streaming and archived audiocasts of its meetings. (Yay!)

 

UPDATE: This planned closure for this weekend has been cancelled because of the rotten weather forecast. Original entry:
Once again, the outbound side of the Douglass Bridge will be closed this weekend; here's the scoop from DDOT: "Improvements to the Frederick Douglass Memorial Bridge (sometimes referred to as the South Capitol Street Bridge) will continue this weekend, as crews continue repairs on the southbound or outbound lanes. Following the evening rush hour on Friday, May 18 at 10 pm, the District Department of Transportation (DDOT) will temporarily close the southbound (outbound) lanes on the Douglass Bridge. All lanes will be reopened in time for the Monday (May 21) evening rush hour. Outbound bridge drivers will be directed to follow signed detours to I-395 South across the 11th Street Bridge to I-295 South. Drivers also may consider taking either New York Avenue or Benning Road as alternate routes." This is of course all in preparation for The Mother of All Bridge Closures, coming in July and August when both sides of the bridge will be shut down to demolish the northern 800 feet of the viaduct, and lower the exit of the bridge so that it reaches ground level at Potomac Avenue.

More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

New from DDOT: "The District Department of Transportation (DDOT) today started an innovative program to spur greater use of transit and ridesharing by commuters affected by this summer's repairs of the Frederick Douglass Memorial Bridge (sometimes referred to as the South Capitol Street Bridge). The program will help commuters affected by DDOT's planned July-August closure of the bridge. Modeled after a successful similar effort carried out by the Woodrow Wilson Bridge Project, DDOT's 'Bridge Bucks' program will provide $50 per month toward transit fares and vanpool fees to encourage commuters to switch out of their cars and into an alternative travel mode." There's a Bridge Bucks web page with more information. Or you could just take that eight-week summer vacation!
UPDATE, May 8: Here's a WTOP piece on the Bridge Bucks plan, and The Post's Dr. Gridlock (Bob Thomson) is addressing the program and the concerns from commuters about the plan to close the bridge in his Get There blog today.
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

From DDOT: "Improvements to the Frederick Douglass Memorial Bridge (sometimes referred to as the South Capitol Street Bridge) will continue this weekend, as crews begin repairs on the southbound or outbound lanes. Previous recent weekend closures affected inbound lanes only. (View a map of weekend detours) Following the evening rush hour on Friday, May 4 at 10 pm, the District Department of Transportation (DDOT) will temporarily close the southbound (outbound) lanes on the Douglass Bridge. All lanes will be reopened in time for the Monday (May 7) evening rush hour. Outbound bridge drivers will be directed to follow signed detours to I-395 South across the 11th Street Bridge to I-295 South. Drivers also may consider taking either New York Avenue or Benning Road as alternate routes. Following this weekend's closures, the outbound lanes on the Douglass Bridge again are scheduled to close on the weekends of May 19 and June 2. Closure of the bridge's outbound lanes follows six previous weekends of closing the bridge's northbound or inbound lanes. The off-peak weekend closures and repairs are needed to prepare for a major rehabilitation that will take place on the Frederick Douglass Bridge in July and August--at which time all lanes on the bridge will be closed in both directions."
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

A reminder that the inbound lanes of the Frederick Douglass Bridge will again be closed this weekend (from 10 am Friday, April 20 until before the Monday, April 23 morning rush hour). In May and June, the weekend closures will be shifted to the outbound lanes. And, of course, in July and August, the bridge will be shut down completely for Extreme Makeover: South Capitol Street, aka the demolition of the northern end of the bridge to allow for the bridge to arrive at ground level at Potomac Avenue.
Also, see my previous entry about various Earth Day-related activities around Near Southeast and the Anacostia River. Alas, my calendar has an unmoveable commitment for Saturday, otherwise I was all ready to make the Canal Park cleanup a JDLand meet-and-greet. But don't let that stop you from participating; and be sure to ask the organizers if you can help them move the school buses (heh heh).
More posts: Canal Park, South Capitol St., Douglass Bridge, Traffic Issues
 
139 Posts:
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Search JDLand Blog Posts by Date or Category