Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: South Capitol St.
See JDLand's South Capitol St. Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


246 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 25
Search JDLand Blog Posts by Date or Category

Considering what it portended for the forgotten little patch of land I had been blogging about for the previous 20 months, this post of mine late in the evening on Sept. 21, 2004 was pretty understated: "Baseball coming to Near Southeast? 'District officials disclosed plans yesterday to build a publicly financed stadium costing more than $400 million on the Anacostia waterfront near South Capitol Street, amid growing signs that Major League Baseball will attempt to move the Montreal Expos to Washington.' It doesn't mean that baseball in DC is a done deal, or that the Near Southeast site is a done deal, but it's a very interesting decision, and one that would have a huge impact on Near Southeast if it were to happen."
Yeah, kind of!
Late the next day, I went out and took a set of photos throughout the 21 acres that would eventually become home to Nationals Park, knowing it was important to get a bunch of "before" photos should this stadium actually come to pass. This was in the days when my photo-taking was pretty much limited to firing my little point-and-shoot digital camera from behind the wheel while I drove around the neighborhood, having not quite yet worked up the bravery to get out on foot. (Eventually I documented all of the buildings that were demolished to make way for the ballpark, but this Sept. 22 excursion marks for me official start of what would become an all-consuming project for me over the next four years.)
It wasn't until the next week that it was all made official, that the Expos were coming to town and that the city would pursue building a new stadium in Near Southeast. And the reality of the ballpark didn't truly come to pass until that marathon city council session in February 2006 that first voted down then finally ratified the stadium lease agreement (signed by MLB the next month), followed two days later by the court ruling allowing the eminent domain seizure of the land for the ballpark to move forward. Demolitions began in May 2006, and the construction was completed on time for the official opener on March 30, 2008.
To look at not only the Sept. 22 ballpark-area photos but also a batch I took mainly around the Cappers footprint a few days earlier is to be reminded yet again of how much change has come to this area in the same amount of time that many people, say, pay off a new car. It's almost jarring to catch glimpses in these shots of the old South Capitol Street viaduct (demolished in July 2007) that in many ways was such a symbol of the old Near Southeast--how it walled the neighborhood off from Southwest, and how it helped perpetuate the area's overgrown industrial feeling, while allowing commuters to blow past it all without really having to look at it.
It's going to be a while before big-time development resumes in the area (just like everywhere else in the city/region/country), but that doesn't make the changes that have already happened to this formerly forgotten little spot a mile south of the U.S. Capitol any less striking to look at.
 

(I Tweeted this a week ago, then forgot to ever post it here.) From the WashBizJournal: "Florida Rock Properties Inc. is on the market for a joint venture partner to help develop its much-anticipated 1.1-million square foot project, which will put retail, office space and a waterfront plaza on the land across from Nationals Park." My RiverFront page has scads of renderings, showing the designs and planned phases; the initial plans were to construct the office building and public plaza on the east end of the site (by Diamond Teague Park) first; the later phases can't be built until the new Douglass Bridge is constructed and the old one demolished.
 

* This is about 50 feet off-topic, but Hank Stuever wrote a neat piece in today's Post Style section about the Capitol Skyline Hotel at South Capitol and I, SW, and the revitalization it's undergoing, including the creation of a series of weekend events this summer, such as Spike Mendelsohn grilling burgers poolside on Sundays. If you look at the article online and see the "This Story" box of links, there's one for "Video: Capitol Skyline Pool, 1969", which just happens to be a brief clip of my family swimming there (I'm the little fireplug just learning to swim). It's hard to see in this version, but at about the 24-second mark, when my dad is about to spring off the diving board, you can briefly see the "Esso" sign in the background that marks where the gas station just to the south of the hotel operated for so many years....
* Last week I wrote about the approval by both the NCPC and the Zoning Commission of the Capper zoning changes, and mentioned that the letter from the Marines that indicated the Corps' continued objections to the plans for apartments and an office building on the old Capper Seniors site at Seventh and M, was not included with other materials about the case. I now have the letter, which says in part:
"The Marine Corps [Anti-terrorism/Force Protection] issues are much greater in scope than those of the Navy. Because of our issues are more complex, considerable analysis and study is required to develop a solution that is acceptable, to the Marine Corps, the Developer, the Housing Authority and the District Planners. This detailed study must also be conducted in context of the larger community of stakeholders and historic integrity of the Marine Barracks as an institution. The Marine Corps has implemented a master planning effort to research and develop broad and unique solutions to these issues at hand." And: "The Marine Corps requires additional time to carry out our study and to develop acceptable solutions. Without adequate time to address these issues, including the possible need for alternatives on [the old Capper Seniors site], the Marine Barracks Mission and full function of that Institution could be jeopardized."
The Marines requested that the zoning action be tabled until adequate time was given to address their issues, but both the NCPC and the Zoning Commission gave the office and apartment plans their final approval anyway, with the record including the agreement between the developer and the Navy to address security concerns.
Comments (0)
More posts: Barracks, South Capitol St., zoning
 

Remember "Taxation Without Representation Street," the city's renaming of the three blocks of South Capitol Street in front of Nationals Park? The Examiner does, and checks to see if anything's happened with it: "As of April 24, the team's legal address was formally changed to 1500 Taxation Without Representation St. SE, thanks to an act of the D.C. Council. But no one would know it: The D.C. Department of Transportation has yet to change the street signs, and the Nationals apparently have no intention of redesigning their letterhead."
Comments (0)
More posts: South Capitol St., Nationals Park
 

The city's building permits feed hasn't been working with perfection of late, so I'm only now seeing some recent permits of interest:
* As many folks have seen (and as I Twittered last week), the asphalt is being pulled up on the southern end of Canal Park (here's a photo from last Friday, taken at Second and M). Two building permits have been approved for the southern two blocks, allowing for "interior cleaning [...] to remove pavement import top soil and plant grass." Hopefully the northern block will get a makeover too. (UPDATE: Commenter Scott says that work on the northern block is already underway.)
* Monument Realty has gotten a six-month extension on the raze permit for the Domino's at South Capitol and M. And, though it's outside my redrawn boundaries, I'll mention that 1244 South Capitol (home to the stalled Camden Development apartment building) got a final six-month extension on a raze permit for that site. (Though I was bummed to see on Opening Night at the ballpark that the little red brick building that had been left standing for so long was finally gone.)
* A final (belated) reminder that the latest Anacostia Waterfront Forum is tonight at 6:30 pm at the MLK Library. The topic is "Waterfronts and the World's Great Capital Cities," with office of planning director Harriet Tregoning.
* The Post wrote a piece in the Sunday Business Section about Bo Blair, the Georgetown Events "restaurateur / entrepeneur." Fun fact: he's paying $25,000 a month in rent for the space on Akridge's land at Half and N.
 

Catching up from a few days of slacking:
* Today's Washington Business Journal (subscribers only) reports that the city is "considering" using 225 Virginia Ave. (the old Post Plant) as the new home for Child and Family Services, now that they've decided not to move the agency to a new development at Benning Station. The city continues to pay $6 million a year in rent on the 420,000-sq-ft building, though tried a request for proposals last year to see about a sublease or sale of the property (but apparently didn't get much interest). I wonder how much the city would have to spend the rejigger the very warehouse-y building into the 180,000 sq ft of office space needed by CFSA.
* From the Fredericksburg Free-Lance Star, a story that Prince William County is spending $225,000 to look at passenger ferry service up the Potomac: "It will conduct test boat runs on May 4, 5 and 6 from stops at Prince William marinas at Quantico, Dumfries and Occoquan to Fort Belvoir, Alexandria and the Washington Navy Yard. The test boat will be a catamaran that seats 149." (I assume they'd want to use the dock under construction at Diamond Teague Park, but there's no specifics.)
* On Wednesday evening, the Post reported (though the article is no longer on the web site) that the city had informed Metro--in the middle of a game!--that it would no longer pay the $27,000-an-hour cost of keeping the subway open if games at Nationals Park ran late because of extra innings or rain delays. By the next morning, the city had changed its mind.
* The Douglass Bridge will be closed Sunday (4/26) from 5am to approximately 10am for the monthly swing span test.
 

Been kind of a nice few days here without much news, so now I'm having to force myself back into the routine. I'll start small:
* An update to the post about the new houses released at Capitol Quarter: EYA tells me that the houses released are spread throughout the development: 421 L Street, under construction and expected to be ready in April (listed for $720,340 on the EYA "Move In Now" list), two houses in the block just to the north (expected to be ready in the fall), and four houses in the block bounded by I/Virginia, Fifth, Fourth, and K that could be ready by the end of the year. On all of these blocks the reservations placed by homeowners over the past few years have now been converted to contracts; that is expected to happen for the final Phase 1 block (between Third and Fourth and Virginia and I) later this year.
* The agenda for Monday night's ANC 6D meeting is posted, and it includes a vote on the Phase 2 designs of the Yards Park that were discussed at last week's special meeting. I've also now added a bunch of those Phase 2 renderings to my Yards Park page. Other items on the ANC 6D agenda are about Southwest subjects, though I should note that the National Marathon on March 21 (which they'll be discussing) will be coming across the Douglass Bridge, briefly using South Capitol Street until it turns west on P Street.
There's also an agenda item about a BZA application for 1101 South Capitol St., SW, which was the old KFC. This is a good opportunity for me to mention that, with two blogs about Southwest now in full flight, I'm going back to my original boundaries, which old-timers will remember stopped in the median of South Capitol Street, which is where Southeast ends and Southwest begins. I'm lucky enough to be watching a neighborhood that has probably the firmest boundaries of any in the city, so I'm going to respect them!
* City budget season is nearly upon us. I've added to my calendar a partial list of dates for FY08-09 oversight and FY10 budget hearings, for agencies that have the most bearing on Near Southeast. Check the DC Council web site for the full list.
 

ANC 6D heard a presentation on Monday night from the team working on the South Capitol Street Environmental Impact Statement, which is now in its "final preferred alternative" stage. Their PowerPoint presentation was pretty close to the one I posted last month, and one of the consultants did tweak me a bit about how I "spoiled the surprise" on the choice of the arched bascule design for the new Douglass Bridge.
Here again are the (long!) bullet points about what the preferred alternative designs are for the portion of South Capitol west of the Anacostia (see the presentation if you're interested in the preferred alternatives chosen for east of the river), along with some issues raised by the ANC:
* It was emphasized that these new designs will not be adding any capacity, but that the main goal is to bring back the "boulevard" feeling of the corridor.
* The new bridge will have 20-foot-wide sidewalks on each side, and only two piers will need to be built in the river, compared to 3-5 piers that would have been needed with the other designs. (The cable stayed swing bridge would have had just one pedestrian/bike path, 16 feet wide, in the middle of the bridge, surrounded by six lanes of traffic.)
* There will be a seven-acre traffic oval at the foot of the new bridge (which will be located to the south of the current bridge), reshaping the intersection of South Capitol Street and Potomac Avenue. (The ballpark's Home Plate Gate and entrance promenade will be the northeast edge of the oval.) The city is already in the process of acquiring seven properties or portions of properties that will be needed for the oval and bridge footprint, including the red brick warehouse on the northwest corner of South Capitol and Potomac. This oval is on the NCPC list of locations for future memorials and museums.
* The intersection of South Capitol Street and M Street will become an at-grade intersection (no more underpass for through traffic). ANC chair Andy Litsky expressed great concern about how this could make the intersection even more dangerous than it already is, to which the DDOT team replied that the reconfiguration should make it safer. (Certainly it would seem that having a "normal" intersection with two left-turn lanes in most directions would be an improvement safety-wise over the existing mish-mash of lights and poorly striped turn-lanes, but then there will also be a lot more cars cycling through once the tunnel lanes are gone.)
* There will be modifications to South Capitol's interchange with the SE/SW Freeway, with the replacement of the ramp that begins at I Street with an at-grade intersection underneath the freeway that would have two left-turn lanes to a new ramp. With the existing ramp removed, the intersection at South Capitol and I would also be reconfigured.
* The northern section of South Capitol Street will match the reconfigured portion between N Street and Potomac Avenue, as a six-lane boulevard with a median and wide sidewalks.
Commissioners McBee and Moffatt asked as they have in the past about whether the existing bridge could be kept as a pedestrian/bike-only bridge, but DDOT explained that since the swing span would continue to need to be opened for river traffic, the cost of maintaining the old bridge just isn't feasible. (The RiverFront folks might also be a teensy bit upset that their land that's beneath the current bridge wouldn't be coming back to them.) And the team also indicated that this new bridge does not preclude the construction (Some Day, Perhaps, in Some Far Off Time) of a tunnel to move non-local traffic from Anacostia to I-395.
They expect the final Record of Decision from the feds this fall; however, when pressed for a start date, they said 2011 would be the absolute earliest for the start of construction (with completion possibly in 2015), but that as of now there's no funding for the $700 million project. It's also possible that portions of the designs could be undetaken if partial funding is received.
Comments (0)
More posts: ANC News, meetings, South Capitol St., Douglass Bridge, Traffic Issues
 

With developers of three large projects needing to make presentations, ANC 6D has decided to have a separate presentation meeting on Feb. 2 in advance of its Feb. 9 monthly business meeting. And all three are Near Southeast spectaculars:
* The Housing Authority will be there to talk about the various modifications it's seeking to the Capper PUD, in advance of its March 19 Zoning Commission hearing;
* DDOT will be making a presentation on the final South Capitol Street Environmental Impact Statement (this includes the plans for the new Douglass Bridge), which I wrote about a few weeks back; and
* Forest City will be making a presentation about the park at the Yards (I believe these are the designs for Phase II, which include the various pavilions and the docks and marinas). The National Capital Planning Commission will be taking a look at Yards designs at their Feb. 5 meeting, and the Zoning Commission hearing on the park's second phase is scheduled for March 2.
The meeting is at the ANC 6D offices on the second floor of 1501 Half Street, SW, at 7 pm.
Comments (0)
More posts: ANC News, Capper, meetings, South Capitol St., Douglass Bridge, The Yards, Yards Park, zoning
 

Some items from the past few days. Big ones first:
* It's probably been true for weeks, but I've just now been by Diamond Teague Park for the first time in a while and can confirm that construction is definitely underway there. Fences are up, cranes (three of them?) are in place, and workers were there. Pictures tomorrow. (Probably *lots* of pictures tomorrow from all over, as long as the weather stays reasonably clear.)
* City Paper got its hands on the letter Mayor Fenty sent to DC Delegate Norton about the city's priorities should the Feds decide to toss some stimulus package dollars in this direction. As I predicted, the two Near Southeast bridge projects were mentioned: "In particular, aspects of the Eleventh Street and South Capitol Street Bridge replacement projects could be undertaken immediately." He also mentions the city's backlog of maintenance projects, along with investments in Metro and the implentation of the streetcar project. And school modernization. And public safety issues.And environmental initiatives. And housing affordability. And health care. (And now here's the stimulus bill itself, though it doesn't get down into specific projects. On the other hand, considering these two bridges ease the commutes to and from the district of the House Majority Leader....)
* Back in mid-November, the transfer of the plot of land known as Reservation 17A from the Feds to the city finally took place; it runs between New Jersey Avenue and Second Street, and is straddled by the trash transfer station building. With this now under District control, various wheels can start turning in that area, including allowing the establishment of I Street between Second and New Jersey that will form the southern boundary of WC Smith's 800 New Jersey Avenue project. There's hopes that the trash transfer station could be demolished in 2010.
* Reader T. reported yesterday that a small bought-at-the-hardware-store For Sale sign went up at 10th and M yesterday, in front of the fence of the Exxon station. I'm not sure what the deal is, since the land is actually owned by the Exxon Corporation, and you'd think they'd have better methods of marketing the land.
* The public notice for the March 19 Zoning Commission hearing on various Capper PUD alteration requests is now available.
* WBJ reports that the Nationals have parted ways with Centerplate, last year's concessionare at the ballpark. This year it will be Levy Restaurants for the food and Facility Merchandising Inc. for the retail.
* More of the fences are coming down at 55 M, as you can see on the web cam. (Though it took me more than a month to notice that the plywood "tunnel" at the Metro exit had disappeared.)
* The Douglass Bridge will be closed at 5 am Sunday until 10am-ish to test the swing span.
 
246 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 25
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.