Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: South Capitol St.
See JDLand's South Capitol St. Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


246 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 25
Search JDLand Blog Posts by Date or Category

Responding to my inquiry about the windows that have recently been removed from the Pattern Shop Lofts building on the south side of Third and Tingey streets in The Yards, the folks at Forest City have let me know that interior demolition work is indeed underway on the World War I-era building. The existing interior walls, ceilings, plumbing, asbestos {cough} and whatnot is all being removed, in preparation for the actual construction/renovation work that is scheduled to begin later this year. Two floors will be added to the top of the building as part of its transformation into a 170-unit apartment building, which will also have 10,000 square feet of ground-floor retail. It's expected to be finished next year. (Its neighbor across Third Street, the Boilermaker Shop, is currently out for bid, and construction is expected to begin this summer to turn it into a 46,000-sq-ft retail space by fall 2009.)
Meanwhile, work has stopped at the 1345 South Capitol Street site (directly across from the ballpark), with the old buildings demolished and the site mostly cleared. Camden Development has been planning a 276-unit apartment building for this location, but I've been told that the company is "trying to decide what to do" with the project.
Comments (0)
More posts: 1325sc, Boilermaker Shops/Yards, Foundry Lofts/Yards, South Capitol St., The Yards
 

From DDOT, word that testing of the swing span of the Douglass Bridge necessitates some nighttime closures this weekend. "To conduct a full test of the swing span, and ensure the safety of motorist and workers, the bridge must be closed during the testing activity. The first closure is scheduled for Friday evening, April 18th from 10 pm to 5 am. If all results return positive no further closures will be necessary. However, if minor adjustments are found to be necessary, additional testing and closures will be conducted on Saturday from 10 pm to 5 am and repeated again with test-dependent closures scheduled for Sunday from 10 pm to 5 am. Motorist will be detoured to the 11th Street bridges."
 

(I'm not sure there's anyone who is wishing more than me that the dang thing would open already....)
* The Examiner looks at Southwest residents just across from the ballpark who are selling the parking spaces that came with their homes to Nats fans for as much as $3,000 a season. But if you park near these houses and don't have a visitors pass (or aren't one of the chosen few who fork over the dough for these private spaces), expect the residents to call DPW to have you ticketed and towed.
* The Post's newly reconstituted DC Wire blog catches up with Ken Wyban, the only resident homeowner on the ballpark footprint to lose his house when the city invoked eminent domain to take over the land. (City Paper talked to him a few weeks ago in their big ballpark Winners and Losers cover story.)
* Reader Sean alerts us that the Express has a special section on the ballpark today too. Looks like a bunch of the pieces are available here.
* Even the Annapolis Capitol newspaper gets in on the fun with its own overview of the ballpark, though they get a demerit for misspelling South Capitol Street and for mentioning the "Southeast neighborhoods west of the ballpark." (Uh.....)
* WTOP talks about the plans for security around the ballpark, at an estimated cost to taxpayers of $1.2 million.
* And, just as I'm finishing this up, I see that MLB.com has a new article about the preparations and plans for this weekend's festivities.
Apparently the beautifying of the neighborhood is underway, too--the black fence along Half Street at the Monument hole in the ground now has art on it (see 55 M web cam) as well as banners on the upper floors of 55 M facing the ballpark, and the Stadium web cam shows a "Welcome Home Nats" sign on the side of 100 M. The recent jet-black paint job on the old Domino's at 1200 South Capitol is part of this, too, and look for more Monument Realty "art" around all of its holdings.
 

* The Examiner writes about the Washington Area Bicyclists Association's look last week at the crosswalks and curbs at the US Department of Transportation HQ, which WABA says are not ADA compliant: "An inspection of the area Friday found security bollards blocking curb ramps, bus shelters with virtually no sidewalk access, and multispace parking meters inaccessible to people in wheelchairs. Also, several crosswalks at non-signalized intersections feed into curbs with no access ramp[.]" DDOT says that the crosswalk at Second and M is not supposed to be used anymore (since there is a fully compliant crosswalk just to the west at New Jersey Avenue) and will be sending crews to take away the crosswalk marks.
* City Paper continues its saturation coverage of the Positive Nature youth program at 1017 New Jersey with video from Saturday's rally. The organization is trying to stave off eviction thanks to the huge increase in its property taxes.
* WAMU has posted the audio of its piece on last week's rededication of the Douglass Bridge. The city's Cable 16 channel should be adding it to its lineup soon. You can watch the press conference on the new on-street parking regulations near the ballpark in the meantime.
 

Today the Usual Suspects convened on the Southwest corner of South Capitol Street and Potomac Avenue to officially rededicate the Frederick Douglass Bridge and to celebrate the completion of all the rehabilitation work that's been underway since last year. I took some photos of the ceremony, though you'll note that my camera kept being inexorably drawn to a certain new landmark across the street that's less than three weeks away from opening. (It's not my fault--they set up the podium with the ballpark in the background instead of the bridge!) If you've joined us late, you can browse all the background on last summer's Douglass Bridge Extreme Makeover that demolished the northern approach to the bridge and totally remade this portion of South Capitol Street. If you're hoping for a new Douglass Bridge, though, don't despair--city and federal officials announced themselves as still very much committed to building a brand new bridge.
 

This just in from DDOT (no link yet): " DC Department of Transportation (DDOT) in coordination with The Federal Highway Admin (FHWA) will be installing the overhead Nationals Baseball Signs during nighttime hours Monday, March 10, 2008 from 8pm to 4:30am on the overhead sign poles for the South Capitol Street ramp exit off 395NB. The ramp will be closed to ensure the safety of the workers and all motorists. All work will be completed prior to rush hour on Tuesday. The work area is 395-North also known as East Bound SE/SW Freeway. DDOT will assist in controlling traffic in the immediate work area and guide motorist to the detour routes. Work installing the signs will began with the East bound side of 395 at the South Capitol Street. DDOT encourages all motorists traveling in the work area to follow the clearly marked detour signs and keep alert."
Comments (0)
More posts: South Capitol St., Nationals Park
 

* Thanks to reader K for the heads up that the 55 M web cam is back online. Looks like they painted those distinctive beams above the Metro entrance during the blackout. (UPDATE: And the webcam now shows that Half Street is getting paved today.)
* Today it's an Examiner columnist who rails against the traffic and transit catastrophe at the ballpark three weeks before the first regular-season pitch even happens, using his crystal ball to predict that an unfinished Metro station now means an unfinished Metro station then.
* The GW Hatchet explains how to get tickets to the March 22 game at Nationals Park.
* Howard University's paper looks at Southwest residents wary of the development starting to surround them.
* Get in on the Douglass Bridge design discussion in the comments from a few days ago.
 

* I mentioned this a few days back, but why not pass along another reminder that Monday at 7 pm is the ANC 6D monthly meeting, with presentations and votes on 401 M Street, the ballpark traffic management plan, and the South Capitol Street Draft EIS, plus a briefing by the Nats on the Opening Day "Fan Fest" activities. To get in on the fun, go to St. Augustine's Episcopal Church at 6th and M St., SW, starting at 7 pm.
* If the ANC isn't your bag, you can watch the Zoning Commission take up again the Capitol Gateway Overlay Review for Donohoe's planned office building at 1111 New Jersey. It's a continuation of the last hearing, which revolved mostly around whether the garage access would be from New Jersey or from the alley. The hearing starts at 6:00 pm, and 1111 is also on the public meeting agenda at 6:30 pm, which perhaps is a display of optimism that Donohoe and DDOT will have the garage issue straightened out and the review ruling can be made. Watch the webcast, if you're so inclined. (I'm going to be missing both of these meetings, so it might be a few days before I can get the scoop on them.)
* The new Enhanced Residential Parking Permit signs, which allow non-Zone 6 parking only on one side of the street in certain areas near the ballpark, continue to get installed. They came to my street north of the freeway within the past day or so.
* I thought I did good with last week's find of a November 2006 satellite photo of the neighborhood, but reader JK has upped the ante with the "Bird's-Eye View" option at Microsoft Live Search, showing not-real-high-up images from March 2007. But be careful when you're scrolling around--if you go to fast, the images flip back to shots from early 2003. (Which is festive in its own fun-house kind of way.)
 

Just a bunch of tiny items worth highlighting on a dreary Saturday (no new photos today in this muck):
* A building permit has been approved to build a surface parking lot along First Street between M and N, where Normandie Liquors and its brethren were demolished last month. And the Archdiocese of Washington has applied for a public space permit for the 1300 block of First Street, SE--does the Popemobile need special parking permits?
* As plans at The Yards continue to move forward, there's now official names for the first-phase projects. Say hello to The Boilermaker Shop, The Pattern Shop Lofts, and Factory 202. (And 401 M and 400 Tingey, but those aren't anywhere near as catchy.)
* The 55 M web cam is no longer available to the public. Perhaps they want the Opening Day vista to be a big surprise. Or they don't want people watching the last-minute work on the Navy Yard Metro station. (I wonder if the gas main hit on Thursday was caught by this camera.)
* Some commenters are discussing the idea that's been floated of someday demolishing the Southeast-Southwest Freeway. Getting rid of this Berlin Wall that separates Capitol Hill and Near Southeast (and splits Southwest) was brought up in the National Capital Planning Commission's 1997 Extending the Legacy framework plan, if you want to see it actually on paper. (Apparently an updated NCPC framework plan is scheduled to come out this spring, which looks like it continues to have Virginia Avenue marked where the freeway currently is.) As to whether I'll see this done in my lifetime, well, it would be a nice surprise.
If you really want to go high-concept, you can read DDOT's 2003 South Capitol Street Gateway and Improvement Study to see their ideas for a tunnel that would link I-295 and the SE/SW Freeway for through traffic, leaving South Capitol Street to become the grand urban gateway boulevard planners envision. At Wednesday's public meeting on the South Capitol Street Draft Environmental Impact Statement, DDOT said that the tunnel isn't totally off the table, but they decided that a new Douglass Bridge and other South Capitol Street improvements could move forward separately. But could a tunnel still work if the dream of dismantling the SE/SW Freeway were realized?
* I've tried to remain (mostly) unopinionated on various projects during the five years I've run this site. But sometimes, it's necessary to take a stand, to come out from behind the cloak of neutrality and crusade for what you believe in. So I'm going to take advantage of this bully pulpit and fight for one thing: Arched Bascule!
 

Beginning the trek through the approvals process are the first new-construction buildings planned for The Yards--a 320,000-square-foot office building at 401 M Street and a 170ish-unit apartment building to its south at 400 Tingey Street. They would both have ground-floor retail, but it's what's planned for 401 M that will probably have everyone's attention, because a grocery store is proposed for that space, just inside the historic wall and sentry tower on the southeast corner of Fourth and M. (No, which grocery store it could be hasn't been announced yet.) Recent documents have said that 401 M could begin construction in late 2008, with delivery in 2010; the residential building's start depends on "market conditions." (Uh-oh.) A few more early renderings are on my 401 M/400 Tingey page. (See my Yards First Phase page for information on the retail and residential projects that are getting underway this year.)
There's a Zoning Commission Southeast Federal Center Overlay Review of the plans scheduled for April 17, and ANC 6D will be voting on whether to support the project at its March 10 meeting.
Also at Monday's ANC 6D meeting will be presentations and votes on plans for the Opening Day Fan Fest at the ballpark, the ballpark Transportation and Residential Curbside Management Plan (formerly known as the TOPP), and the South Capitol Street Draft Environmental Impact Statement. I attended Wednesday night's public meeting on the Draft EIS, and while the slides from the meeting haven't yet been posted on its web site, the DEIS's executive summary is a good substitute for the information that was available at the meeting--you can read my summary of the plans as well. There wasn't much public comment (maybe seven or eight speakers), and the concerns seemed to be more about making sure DDOT does a good job of handling the inconveniences and resident issues as a result of the planned changes, rather than any real opposition to the plans themselves. The public comment period ends March 31, and the Final EIS is expected to come out late this year.
Alas, I won't be able to attend this ANC meeting that's so chock full of Near Southeast goodness. But I'm guessing that spending that evening watching the Roger Federer-Pete Sampras exhibition at Madison Square Garden might be a bit more enjoyable.
 
246 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 25
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.