Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: South Capitol St.
See JDLand's South Capitol St. Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


246 Blog Posts Since 2003
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 25
Search JDLand Blog Posts by Date or Category

During my poking around on the DC Office of Cable Television web site recently, I discovered that many of the groundbreakings and other events in Near Southeast this year that have been broadcast on the city's cable channel 16 are also available On Demand; the same goes for council hearings, available on Channel 13's On Demand page. (I kinda sorta knew that the On Demand stuff was there, but when I checked it many moons ago, it didn't seem quite so complete, so I hadn't looked back in on it for a while.)
So if you've missed any of the following four-star telecasts from 2007, you can watch them at your leisure:
* The July bill-signing ceremony at the Earth Conservations Corps pumphouse where the Anacostia Waterfront Corporation and the National Capital Revitalization Corporation were officially abolished;
* JPI's June "groundbreaking" for its four projects along I Street ("Capitol Yards");
* The January groundbreaking marking the start of the Navy Yard Metro renovation and Monument's Half Street project;
* And pretty much any ceremony anywhere in the city the mayor was at since the beginning of the year, plus a lot of other presentations and events. (Be sure not to miss the Reporters' Roundtable "Snitching Debate.") Check the dropdown boxes on the On Demand page for the offerings. I've added the above links to all of the various project pages in case you're desperate to find them again someday.
Two of the most recent shindigs haven't gotten added to the lineup yet--the Oct. 22 kickoff ceremony for the Capitol Riverfront BID (in which you can find out where the "Traveling Roadshow" moniker originated), and the mayor's remarks at the Nov. 13 turf unveiling at the ballpark. Ditto with the Waterside Mall Demolition program, which is currently playing on Channel 16 but hasn't yet made it to On Demand. But perhaps they'll show up eventually.
 

It started innocently enough. On Sunday morning, when I woke up to find such a brilliant sunny day, I decided to go take a new batch of photos of the demolition at old Capper Seniors to replace the dreary ones from Saturday. Then I started moving away a few blocks, to catch more distant views of the building. Then I decided that there were a bunch of locations where 70/100 I and Onyx on First were changing the skyline that I hadn't captured. Then I realized that it had been a long time since I had taken a complete set of photos of the western side of South Capitol Street at O and P streets, to show the changes since the demolition of the viaduct and all the streetscape improvements. And then of course, while I was there, I had to take a set of shots of the ballpark's western facade. Then there were more shots needed of the changes along M Street thanks to 55 M and 100 M. By the time I was done, I had a ridiculous number of new images up on the site, which you can see all on one page; you can also see most of them paired with past shots by clicking on the "Photo Archive Before-and-Afters" links at the top of that page, like the "South Capitol Street Makeover", which shows the new photos from both sides of the street (along with some older angles I didn't update). After a while they all run together, I know. But they make for some spiffy before-and-afters!
 

DDOT has cancelled plans to close two outbound lanes on the Douglass Bridge from 7 am to 5 pm on Saturday and Sunday (Nov. 3 and 4). So now you can take a weekend jaunt and buzz the new South Capitol Street and its renovated bridge without backups!
 

I've confirmed that demolition is scheduled to begin on Monday (Oct. 29) on the northwest corner of South Capitol and O, where Camden Development is preparing to build the 276-unit 1345 South Capitol Street apartment building. Construction of the building itself will probably start in latelatelate2007 or 2008. (h/t to DCMud) And note that it has indeed changed its address to 1345 from 1325, because the city wouldn't give them 1325.
More posts: 1325sc, South Capitol St.
 

For months now, I've been dreading this part of 2007, when so many projects would be underway--and it turns out I was right to be worried. Goodness gracious, tons and tons of photos were needed to keep to my perfectionist mandate, but at last I've gotten them up on the site, even though it's pretty much taken a week to get every shot I wanted. For your perusing pleasure:
*The Stadium Exterior Construction Gallery is more updated than it's been in nearly three months, though N Street was unavailable to me this weekend thanks to lots of digging going on. The photos on that page, as well as on the expanded galleries of views along Potomac Avenue, South Capitol, and from the ballpark's viewing platform at First and Potomac show not only the progress on the stadium but also on the streetscape improvements. Sidewalks, curbs, and streetlamps continue to be installed--and the stoplights along South Capitol are gearing up as well (it looks like the P Street light that's now flashing yellow is going to get turned on pretty soon).
* 70 I Street and Onyx are just about topped out, while their siblings 100 I and 100 M aren't far behind. In fact, progress at 70 I is outpacing me so much that within the five days since I took photos of its western side, the bricking of that wall has begun, and is already reaching the second floor in some spots. There's some nice long-distance shots of these projects, from the freeway and the ballpark, highlighting how much the skyline has changed in just a few short weeks.
* Velocity's three-story-deep hole is now getting a concrete floor, which means vertical construction is starting before long. (The crane arrived within the past few days.) And Monument's 55 M Street office building (where the Navy Yard Metro west entrance is being expanded) is poking up above street level, with the first concrete pillars poured along M Street. And it's been hard to get any photos of the work at The Yards, but I finally snagged a few from up on high.
* Plus there's the shots from the top of 20 M Street this morning, including a few panoramic views across Southwest.
If you don't want to plow through all those links above, you can see all the new photos on one page, though it's just a touch overwhelming. (Yes, even I know it's overwhelming.) But the project links above (and their expanded archives) are really worth it, because the scope of the changes is now so amazing. So click on a or two to watch the progression.
And now I will rest myself and my camera for a while. Hope you enjoy the photos.
 

The Post's Dr. Gridlock has a blog entry today about the work that continues on the Douglass Bridge: "Out of sight below the deck, in a big box-like area of pale gray steel, workers are riveting new bolts into place while either refurbishing or replacing aging parts of the structure across the Anacostia River. Aside from making the whole thing look better as a southern gateway to central Washington, the work will extend the life of the bridge until it can be replaced by a new structure the city plans to build right nearby." DDOT hopes to wrap up the work on the bridge, and on the streetscape improvements to South Capitol, Potomac, First, and I, by February.
More posts: South Capitol St., Douglass Bridge, Traffic Issues
 

Oct 19, 2007 8:12 AM
Thursday's Washington Times has a piece on the continuing push to expand the boundaries of the Mall, and mentions legislation that Eleanor Holmes Norton introduced yesterday, describing it as envisioning "redrawing East Potomac Park, Banneker Overlook, the grounds of RFK Stadium, the Kennedy Center Plaza and the new South Capitol gateway as sites that would be defined as part of the Mall. All of them could host monuments and museums that various groups ask to be put on the Mall." The bill, H.R. 3880 (text not yet available) would "authorize the National Capital Planning Commission to designate and modify the boundaries of the National Mall area in the District of Columbia reserved for the location of commemorative works of preeminent historical and lasting significance".
This appears to be an outgrowth of the soon-to-be-released National Capital Framework Plan, a joint effort between NCPC and the Commission on Fine Arts, described thusly: "By showing how to create new destinations for cultural attractions throughout the city and improve the connections among them, the Framework Plan will provide a comprehensive approach to easing demand for construction on the National Mall while creating lively urban spaces throughout the city." (The Framework Plan itself is an outgrowth of the 1997 Extending the Legacy framework plan, which also begat the 2001 Memorials and Museums Master Plan.) But, as the Times says, "Local support is building to expand the Mall but the federal legislation it would require is more elusive." So don't look for new memorials popping up at the foot of South Capitol Street next week.
More posts: South Capitol St.
 

Oct 11, 2007 11:22 AM
Another few days' worth of lane closures on the Douglass Bridge this weekend, this time the outbound/southbound lanes, according to a DDOT press release. The outbound lanes of the bridge will be closed beginning on Friday, October 12 at 9 p.m. until as late as Monday, October 15 at 4 a.m. They're working on the swing span area in the middle of the bridge, repairing the steel framing. And apparently they're expecting the work on the bridge and the accompanying streetscape improvements to South Capitol Street to continue through February.
UPDATED to add link to press release.
 

Oct 9, 2007 11:45 AM
(Boy, I really want to ignore this, since 99 percent of it falls outside my cast-in-stone boundaries, but it's a slow day, so....) Tomorrow (Oct. 10) there's a Public Information Meeting about the 14th Street Bridge Corridor Environmental Impact Statement Study. Quoting: "The purpose of this study is to identify actions that can reduce congestion, enhance safety, and improve traffic operations in the 14th Street Bridge corridor." They're looking for congestion and safety solutions and ideas, and also are looking for ways to make the "existing corridor work more efficiently." The scope of the study area runs along I-395 from just east of South Capitol Street all the way to Glebe Road, and east to Route 1 in Virginia and south to M Street in Southwest. See the flyer for additional details. It's from 6:30 to 8:30 pm at Amidon Elementary School, 401 I Street, SW.
UPDATED because I can't read a calendar. Tomorrow is the 10th.
More posts: South Capitol St.
 

Sep 25, 2007 11:40 AM
While the worst of the Douglass Bridge Extreme Makeover pain is now over, there's still some work to be done, and this weekend the inbound lanes of the Douglass Bridge will be closed starting Friday, Sept. 29 at 9 pm, until as late as Monday, Oct. 1 at 4 am. Here's the DDOT press release with details. Quote: "The second phase of construction includes additional work on the swing span area of the bridge and streetscape improvements along South Capitol Street. Upgrades include new environmentally sensitive lighting, pedestrian access improvements such as handicap ramps, pedestrian traffic signals and new sidewalks. Resurfacing work will also take place this weekend on the inbound lanes on South Capitol Street up to N Street."
 
246 Posts:
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 25
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.