Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Retail
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


278 Blog Posts Since 2003
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 28
Search JDLand Blog Posts by Date or Category

I'm just going to bullet-point all this stuff. Follow links for additional background. (See my entry from last night for news on the ANC's discussion about parking and traffic issues during the first games at the ballpark.)
* The commissioners voted to support Forest City Washington's plans for an office/residential/retail project (including a grocery store) at 401 M Street in The Yards. This support hinged on a Memorandum of Understanding on community benefits being offered by Forest City, including a lottery that could allow a 25 percent preference (or higher) for ANC 6D residents when it comes to the 30ish affordable housing rental units in the 194-unit project. (The final verbage of the MOU was hashed out at the meeting; talk about watching the sausage get made.) An audience member complained that LEED certification for the project should not be considered an amenity, but Forest City replied that the city's green building law does not go into effect until 2012, and these buildings are expected to be completed in 2011. Other components include preferences for ANC 6D certified business enterprises and a promise to report yearly to the ANC about the project. A lack of a community benefits package had tripped up this request for support at the ANC's April meeting. This project now goes to the Zoning Commission for a Southeast Federal Center Overlay Review on April 24.
* A request to support William C. Smith's modifications to its plans for 250 M Street (raising the height of the building to 130 feet) was postponed, as the commissioners expressed their unhappiness at the lack of any community benefits. The developer's representatives said that community benefits were part of the original approval of the project as part of the Capper/Carrollsburg PUD, and that this modification is not resulting in any increase in square footage from that original plan. Commissioners had no suggestions for what benefits they would be seeking, only that they want more. This project may be back in front of the ANC at its May meeting, since the Zoning Commission hearing on the PUD modification isn't until late May.
* A request to support a public space permit request by Five Guys to add an outdoor seating area at its Second Street location was turned down, not only because the commissioners said that Five Guys had not provided information on the request to all the commissioners in a timely manner but because there's no offer of, you guessed it, a community benefits package in return for the "public space" being taken.
* A representative of the Department of Consumer and Regulatory Affairs updated the commission on plans to add 40 vendors on the streets surrounding the ballpark, thanks to emergency legislation passed on April 1 by the council. The mayor is expected to sign the act today, at which point DCRA will have 21 days to identify sidewalk locations for the vendors to set up shop. It's not expected that any will be on South Capitol Street or on M Street (thanks to narrow sidewalks), and rules prohibit vendors on residential streets. However, in a few months a larger initiative will get underway, with the Capitol Riverfront BID's involvement, to create a "Development Zone" allowed for in the recent overhaul of city vending regulations, which will give the city and residents greater say in where vendors are placed, what they sell, and the appearance of their carts. And, in response to questions from commissioners and audience members: no cigarettes or alcohol will be sold at these carts, and there don't appear to be any concerns on the city's behalf about terrorism related to these carts or their operators. (I'm just reporting what was asked.)
* The commission voted to support the liquor license application of former O Street clubs Ziegfield's and Secrets to reopen at 1824 Half St., SW, at the site of the old "Lime" nightclub. A voluntary agreement with the clubs' owner was reached to address concerns about traffic, cooperation with police, and community input.
 

As I wrote a month ago in an entry that was visible for about five minutes thanks to all of the ballpark news, the first new-construction buildings at The Yards are now winding their way through the zoning process. It's two buildings that look like one--a 320,000-square-foot 10-story office building at 401 M Street and an 11-story 180ish-unit apartment building to its south at 400 Tingey Street. They would both have ground-floor retail, but it's what's planned for 401 M that will probably have everyone's attention, because a grocery store is proposed for that space, just inside the historic wall and sentry tower on the southeast corner of Fourth and M. The office building would be LEED certified, and the 20 percent of the residential building would be affordable housing units (up to 50 percent of the area median income).
The Parcel D plans have already been reviewed by the National Capital Planning Commission in advance of its meeting tomorrow (April 3), with the executive director reporting that the buildings are not inconsistent with the Comprehensive Plan and do not adversely affect any other federal interests.
The Zoning Commission Southeast Federal Center Overlay Review of the plans and three associated variance requests is now rescheduled for April 24. ANC 6D will be bringing it up again at its April 14 meeting, after electing not to vote on the project at its March 10 meeting because of the lack of a community benefits package--see the summary of the meeting in the April Hill Rag (I was out of town, and so don't have any additional details).
As for start dates, documents earlier in the year had the office portion getting started in 2008 for a 2010 delivery, and the residential portion starting "based on market conditions." However, a reader is reporting that a sign now up at Fourth and M says "Coming 2011." I'll see if I can get any further details. (UPDATE: Yup, 2011 is now the current "estimate" for the project. So, don't stop shopping at the Capitol Hill Safeway just yet.)
In the meantime, work on renovating the Boilermaker Shop at Third and Tingey into a 46,000-sq-ft retail pavilion should be starting Any Minute Now, as should the rehab of the Pattern Joiner Shop across the street into a 170-unit apartment building. Both are expected to be finished in 2009. (Did you see the light displays being projected onto the Pattern Joiner building during the ballgames?) The Factory 202 residential rehab of the old Gun Mount Shop at Fifth and M, which is a joint project between Forest City and PN Hoffman, also now has a "Coming 2011" sign.
 

Beginning the trek through the approvals process are the first new-construction buildings planned for The Yards--a 320,000-square-foot office building at 401 M Street and a 170ish-unit apartment building to its south at 400 Tingey Street. They would both have ground-floor retail, but it's what's planned for 401 M that will probably have everyone's attention, because a grocery store is proposed for that space, just inside the historic wall and sentry tower on the southeast corner of Fourth and M. (No, which grocery store it could be hasn't been announced yet.) Recent documents have said that 401 M could begin construction in late 2008, with delivery in 2010; the residential building's start depends on "market conditions." (Uh-oh.) A few more early renderings are on my 401 M/400 Tingey page. (See my Yards First Phase page for information on the retail and residential projects that are getting underway this year.)
There's a Zoning Commission Southeast Federal Center Overlay Review of the plans scheduled for April 17, and ANC 6D will be voting on whether to support the project at its March 10 meeting.
Also at Monday's ANC 6D meeting will be presentations and votes on plans for the Opening Day Fan Fest at the ballpark, the ballpark Transportation and Residential Curbside Management Plan (formerly known as the TOPP), and the South Capitol Street Draft Environmental Impact Statement. I attended Wednesday night's public meeting on the Draft EIS, and while the slides from the meeting haven't yet been posted on its web site, the DEIS's executive summary is a good substitute for the information that was available at the meeting--you can read my summary of the plans as well. There wasn't much public comment (maybe seven or eight speakers), and the concerns seemed to be more about making sure DDOT does a good job of handling the inconveniences and resident issues as a result of the planned changes, rather than any real opposition to the plans themselves. The public comment period ends March 31, and the Final EIS is expected to come out late this year.
Alas, I won't be able to attend this ANC meeting that's so chock full of Near Southeast goodness. But I'm guessing that spending that evening watching the Roger Federer-Pete Sampras exhibition at Madison Square Garden might be a bit more enjoyable.
 

Last week we had the announcement of the local eateries that will be selling food at the ballpark (including Ben's Chili Bowl, Hard Times Cafe, Cantina Marina, and others). Today's Food section in the Post folows up with a story on the offerings, along with a pretty cool map showing where the various concessions will be located in the ballpark. There are nearly 80 more concession "points of sale" at the new ballpark compared to RFK, and there will be just over 64,000 square feet of restaurant square footage on South Capitol Street, up from a mere 8,900 at RFK. And of course 41,222 more cupholders at the seats than at RFK.
UPDATE: I'm adding all this to my Stadium FAQ section on food offerings, but I might as well post it here as well (gleaned from one of the handouts at yesterday's home plate ceremony):
There will be 49 concession stands at the ballpark, and nearly 200 "points of sale." In addition to the local vendors listed above, the usual fare will be available: hot dogs, sausages, hamburgers, pizza, nachos, popcorn, pretzels, Cracker Jacks, candy, peanuts, and sunflower seeds. There will also be specialty items available, including vegetarian burgers, hot dogs and chili, caesar salads, crab cake sandwiches, crab pretzels, Buffalo chicken sandwiches, burritos and tacos, corned beef, pastrami, turkey, and roast beef sandwiches, fish and chips, Old Bay fries, and soft serve sundaes.
There will also be additional specialty items from "around the National League." Some will be available at every game, such as Philly cheesesteaks (Phillies), Sheboygan brats (Brewers), BBQ pulled pork sandwiches (Braves), and garlic fries (Giants). Others will be available when certain teams come to town: SW Loaded Nachos for the Diamondbacks, Chicago Style Dogs for the Cubs, chili cheese dogs for the Reds, Buffalo burgers for the Rockies, Cuban sandwiches for the Marlins, Texas brisket for the Astros, California sushi rolls for the Dodgers, Knishes for the Mets, pierogies for the Pirates, fried ravioli for the Cardinals, and fish tacos for the Padres.
The concession stand in the family Strike Zone will offer kids meals, a build-your-own peanut butter and jelly sandwich bar, and other food for kids.
Comments (0)
More posts: Retail, Nationals Park
 

Raze permits have now been filed for the Wendy's at 23 I Street and its little gray neighbor at 901 Half Street on the corner of Half and I. These two lots totaling about 47,300 square feet were purchased in late July for $28.625 million by JPI, and the company is planning "23 Eye at Capitol Yards," a 421-unit residential building with up to 35,000 square feet of retail space. Late last year JPI was saying that 23 I would start construction this August--I haven't seen anything lately on whether that's still the case. I haven't had a chance to swing by Wendy's to see if they have a closing date, so if anyone thinks to ask while they're at the drive-through window, let me know. This project would be the youngest of the four Capitol Yards siblings, joining 70/100 I arriving later this year just across the street and 909 New Jersey coming in 2009 one block to the east.
 

Yesterday I posted a whole batch of updated photos of the ballpark's exterior; today you can check out the project pages for the residential projects 70/100 I Street, Onyx (both opening later this year) and Velocity (2009) along with the office projects 100 M (2008) and 55 M (2009) for lots of new shots of those projects, or you can look at alllllll the photos from yesterday on a single page (ballpark shots, too). Don't forget the icon if you want to look at how an intersection has changed over the past few years.
Items of note from my wanderings:
* The south side of I Street is now paved between New Jersey Avenue and Half Street, and I've been told that I Street will be "driveable" by Opening Day;
* First Street is now paved south of K, and paving up to I doesn't look far off;
* The Merritt Cab garage at First and K now has a "Moving March 31, 2008" sign on it; and
* JPI's 909 New Jersey Avenue residential building (between I and K) is not far from reaching ground level, so be prepared for the arrival of another skeleton in the skyline before long.
If *I'm* finding it all hard to comprehend and harder to keep up with, I can only imagine how non-obsessive observers must feel. I'm kind of looking forward to the pace slowing back down a bit come May....
 

Today's print edition of the Washington Business Journal reports that the Blue Castle at 770 M Street has sold again, this time for $25 million to Madison Marquette. The company's managing director of investment told WBJ that the building could be refurbished as a mixed-use development that would serve as an anchor to Barracks Row, and that "the space probably will have one or more major retailers as well as restaurants, an office or residential component and possibly a grocery store." The groups currently in the building have leases that expire in 2012. Preferred Real Estate Investments bought the building in December 2005 for $20.2 million, saying at the time that the building was ideal for retail stores such as a Barnes & Noble bookstore and a Whole Foods grocery, and that they hoped to start construction in 2007.
UPDATE: I guess I should have mentioned that the Blue Castle used to be a trolley barn.
 

It's New Year's Eve, and I'm trying desperately to wring two more days of laziness out of this holiday season, but here's a couple items anyway:
* I'm not about to plunk down the $35 a month for a subscription to find out for sure, but this BidClerk.com posting on a search for a general contractor sounds pretty familiar: "Renovation of and a new addition to a multi-residential complex in Washington. Completed construction plans call for the construction of a six-story, 170-unit apartment building to include renovation of an existing four-story, 157,000-square-foot warehouse with a two-story, 49,000-square-foot addition above the existing roof. General contractor bids are due January 10, 2008." Could there really be that many buildings in the city other than the brown-and-white Pattern/Joiner Shop at The Yards that would so perfectly fit that description?
* If you're driving through the intersection at Half and I, you might be so distracted by the temporary blacktop that now cuts across the old southwest corner that you miss the new sign on the southeast corner advertising DRI/Transwestern's Square 696 project. There's a rendering but no other details.
* The DC Foreign Car garage at 31 K (on the 1015 Half Street site) has just a few hours to become the last demolished building of 2007. But maybe they're gunning for the honor of being the first one of 2008.
 

Time again to dig into the What's the Deal With....? mailbag. Reader BH has asked about the two boarded-up gas stations and the old KFC along South Capitol Street, wondering when they're going to be demolished.
I have no answer, alas, for the former Exxon station on the east side of the street at I, which has been closed since May 2006 after its owner pleaded guilty to double-billing government contractors for more than $120,000; JPI was apparently somewhat interested in acquiring it so that they could build 23 I on the entire block, but that doesn't seem to have happened.
The KFC/Taco Bell closed in June after being bought by Ruben Companies, which has long-term plans for an office building on the site, to match their SC1100 on the east side of the street and 21 L Street to the north. However, they are not planning to demolish the KFC anytime soon, and in fact are looking to rent the space to a food-related business in the near-to-medium term.
The second Exxon, on the west side of the street south of K, closed at the end of August. The rumor was that the lot was going to be sold, but so far no transactions have shown up in the DC property sales database. (Ruben owns the other two-thirds of that block, which is the 21 L Street site.)
(I went 1 for 3 on this. Yeeech. This is what I get for not anticipating that WTDW.... questions wouldn't necessarily be ones I know the answers to! But I'm willing to keep trying--if you have a WTDW.... question, pass it along. Be advised, though, that I'm posting these as I can get to them, so submissions may not get addressed right away.)
 

The breadth of construction around Near Southeast is now so vast that I'm forced to break my photo sojourns up into multiple sessions. Today's batch includes a few from the eastern side of the stadium, which are somewhat hard to come by these days--make sure to see the second photo down on the Stadium Exterior Construction Gallery, which shows the red stars that were added to the scoreboard in the past few days as part of the installation of the clock. (The "Nationals" lettering is cool to see as well, even if it's backwards.) The rest of the new stadium photos are more toward the bottom of the gallery (look for the icon) and on the First Street and N Street expanded galleries, but I'm planning to take a complete batch of photos of the western side of the ballpark on Sunday.
There's also the usual updates to the project pages for residential projects 70/100 I and Onyx on First and the 100 M Street office building, as well as plenty of other vantage points that can be seen on the expanded galleries or on the see-'em-all-on-one-page output. Try not to be blinded by the incredibly blue sky when looking at these shots, and cross your fingers I get that weather again on Sunday.
I've also got one not-so-good comparison showing the slow progress on the demolition of the GPO building at The Yards, though fences and construction vehicles are making it very hard to get good shots of what's going on there.
I did also notice that the DC Foreign Car garage on K west of Half is definitely now abandoned, sometime within the past month or so. No "we've moved" sign is up anywhere, and so it's possible that it's been a number of weeks since they closed, but now all the windows and doors are busted, so it was obvious even to my sometimes-distracted brain. Opus East has said they're planning to start construction on 1015 Half Street in October, which would mean this garage should be gone before much longer.
Tune in tomorrow for the next batch.

 
278 Posts:
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 28
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.