Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: photos
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


78 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

In early 2011, the two-story multi-unit apartment building at 1010 3rd Street, SE (a little south of Cornercopia) was hit by an early-morning fire. Subsequently, a building permit was issued to add another floor, and after close to 18 months of work, the project is now mostly finished. What do you think of the change? (click the photos to enlarge)
Comments (1)
More posts: photos
 

Construction at the 430ish-unit Park Chelsea apartment building at New Jersey and I is now poking out of the ground:
The skyline in this location will be changing quite dramatically over the next few months, but the ground-level view already has evolved a whole lot in eight-plus years, as evidenced when looking westward along the footprint of the can't-open-soon-enough new stretch of I Street between 2nd and New Jersey:
Or, you can look at the change at 2nd and I this way:
before
after
(Told you I was working on something new. More to come.)
See before-and-after photos and information about the project here.
 

Work is speeding along at Twelve12, the apartment-Harris Teeter-Vida Fitness project at 4th and M at the Yards:
The Teeter portion of the building is even getting some windows:
See before-and-after photos and information about the project here.
 

A sunny Sunday peek at new tenants GNC and Nando's Peri-Peri, which both opened in August in the Boilermaker Shops at the Yards:
Or, if you want to see them all in one long-lens shot:
Also in August, it was announced that fast-casual Spanish-small-sandwiches outlet 100 Montaditos will be coming to the Boilermaker Shops as well. And, who knows, maybe someday Bluejacket, Buzz Bakery, and Willie's Brew and 'Que may actually open.
See more new photos, as well as before-and-after photos and information about the project here.
 

Some work appears to be underway on the southwest corner of 1st and K, where Toll Brothers now has building permits for a 13-story, 250ish-unit apartment building. The Tetris-like boxes that have covered rebar and other infrastructure since work was completed on Velocity and the accompanying garage under what's now the Toll site are being removed:
This will allow Toll to begin work on their building more or less at ground level, rather than spending months on excavation and below-ground construction.
See more photos and information about the project here.
 

Thanks to a tweet from Martin Austermuhle (back in March, but I've been busy), I've added a new batch of shots to my page of 1990s Photos of Near Southeast.
It's really just one photo taken at helicopter height from the Carol M. Highsmith Archive at the Library of Congress, but since it is available as a 72 MB .TIF, I was able to zoom in for some looks back into the years right before I started my own photo journey. Judging by the landscape, the best I can say is that it was taken sometime between 1992 and 1999.
Go to the page to see all of them (with explanations of what you're seeing), but see if you can figure out what you're looking at in these captionless sneak peeks:
They certainly trump the black and white overhead photos taken at about the same time that are also on my page, though at least those have some views that the trees obscure in these new ones.
Comments (3)
More posts: photos, Rearview Mirror
 

The showiest demolition in the neighborhood in years is coming to an end, and while I haven't been able to document it in the obsessive-compulsive way I would have liked, I did manage to make it to 11th Street this weekend to see the gator tail-like final remnants of the old flyover to the outbound 11th Street Bridges before it completely comes down.
At the same time, I was able to check out the progress on the filling-in of the sunken eastern portion of the Southeast Freeway to build Southeast Blvd., and dang if they haven't already piled the dirt up so that 11th Street is now level with the "land" just to its west.
Needless to say, I had to create a photo gallery of the remants and the progress, where you'll also see that work is speeding along on the new flyover to the outbound I-695 bridge.
But I wasn't just interested in the tearing down and filling in, so I continued down to O Street, where not only is the 11th Street Local Bridge inching ever closer to getting all of its lanes and pedestrian path opened, but the new asphalt Anacostia Riverwalk Trail path to the river has been laid, which also takes you to the spiffy new landing just completed by the riverside. And from that landing you can see the spiffy new overlooks that reach out onto the old bridge piers from the new local bridge. (For the record, I could have easily sidestepped the construction barrels and ventured onto the overlooks, but I am a good little citizen.)
Lots of images of the new trail, the landing, the bridge, and the surroundings are in a second new photo gallery.
If these two galleries aren't enough, you might take some time to browse my before-and-afters all the way down 11th Street, from the freeway to L to M to N to O to the river, as nearly four years of construction have altered the vistas from a maze of flyovers and embankments to, well, a completely different maze of flyovers and embankments. (But the new flyovers are a little lower on the horizon, at least.)
I also checked out the other projects that are in various stages these days, from Twelve12 to the Lumber Shed to the leafed-out and fountain-ed Canal Park to the hole in the ground that will be the Park Chelsea.
There's new pictures on each of those pages, but I also couldn't help myself and pulled together a third photo gallery, with photos from those spots and a few others that were particularly photogenic on a particularly photogenic day. (It even includes my very first visit to the footprint of one of the neighborhood's most central locations. Where might that be?)
[A postscript: I truly think Sunday was the most perfect day for taking pictures in the 10-plus years I've been wandering the neighborhood, with the achingly clear deep blue sky perfectly matched with the late-May sun strength and positions. I ended up walking more than eight miles in three separate treks, and came home with a smidge more than 1,000 photos, about 300 of which are now in my photo archive.]
 

When last I wandered around Canal Park with my camera, it was cold. And brown. (But skateable!) With Thursday's gorgeous weather surprisingly managing to win a tough battle against my inherent laziness, I took a far warmer and greener walk, and updated my Canal Park page with some springeriffic images.
And, if you really want to see how the three blocks along 2nd Street SE between I and M have changed in the past decade, I invite you to scroll through the many before and afters in my Canal Park Expanded Photo Archive. After all, with my work at the park pretty much done, this might be the last time I have the excuse to make you look at numerous photos of school buses and overgrowth.
Speaking of the buses, I do have one "new" before-and-after I can't resist highlighting.
First, October 14, 2006:
And the same location, May 2, 2013:
Comments (11)
More posts: Canal Park, photos
 

I wandered around on Thursday, it was sunny, I had my camera in hand, etc., etc., yadda yadda yadda.
Some items of note (click photos to embiggen):
On your left, hard-to-get evidence of the ongoing work at Bluejacket at the Boilermaker Shops. They've covered up all the eye-level windows, but peeking through the (dirty!) glass above the large door on 4th shows the fermenters now installed on the mezzanine level.
At right, my first viewing of the renovated Team Store at Nationals Park's Center Field Gate.
Below, the Lumber Shed in the sun.
Agua 301's space is to the left, and Osteria Morini's is to the right. (On the ground floor.)
And, everyone's dream come true, a parking garage being born:
Of course, it's actually the parking garage that will be underneath the Harris Teeter in the Twelve12 apartment building at 4th and M, so it's probably allowed. If you want even more photos of rebar and concrete, my Twelve12 page has them.
 

As I wrote a few days back, the portion of the Southeast Freeway between 8th Street SE and Pennsylvania Avenue will be fully closed after the evening rush hour on Thursday, Jan. 31, to both begin work on the new Southeast Blvd. and to demolish the existing outbound flyover ramp and replace it with a new three-lane one.
One thing I didn't mention in that post is that, with these closures Thursday, both the 8th Street SE on-ramp to the outbound I-695 freeway bridge and the 9th Street ramp toward Pennsylvania Avenue will be closed.
As the helpful graphic at right from DDOT shows, if you're wanting to get on I-695 outbound, you'll need to use the ramp on the southeast corner of 11th and M.
Since this closure now makes the Southeast Blvd. project truly seem underway, I've been spurred into an unexpected burst of action, and have created a Southeast Blvd. project page, separate from my recently refreshed 11th Street Bridges page. Right now it's mainly drawings, "before photos," and links to my previous posts on the project, but I will keep it updated throughout the expected 18-to-20-month span of construction:
I also threw together a new 11th Street Bridges Progress Photo Gallery with some new shots from this past weekend, when I traipsed around N and O streets and up on the local bridge for the first time in way too long.
And now I think my guilt over some long-neglected photos is assuaged, at least for a little while.
 
78 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8




                  © Copyright 2024 JD.