Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: New Jersey Ave.
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


51 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6

The agenda for last night's ANC 6D meeting wasn't made available before meeting time, so I decided to take a chance and skip the session (even though I normally adore subjecting myself to the psychological equivalent of having 2-inch nails driven into my eyeballs for a couple of hours). And it sounds like I picked a good one to miss, because my sources tell me that once again a fight over an alley closing dominated the proceedings, this time being another go-round on Monument Realty's 55 M Street project on the west side of Square 701. Monument was looking for the ANC's support in advance of their Jan. 11 Zoning Commission hearing; last night the ANC's commissioners voiced concerns (which were also voiced in the past when Monument asked for support for its alley closing bill) that Monument's proffered community benefits package is insufficient--as currently constructed, it includes a $10,000 contribution to the Southwest Neighborhood Association's Scholarship Fund, a $50,000 contribution to the local schools, and a commitment to set aside a certain percentage of the residential project for affordable housing. Monument's standpoint is that this project is a "Matter of Right" development, meaning that there is no requirement that they do anything for the community, but they are doing so, anyway. The discussion has been tabled until the ANC's January 8 meeting, and the commmissioners also passed a resolution asking the City Council to table the alley closing bill (which already passed unanimously last week on its first reading and is scheduled for its final reading and vote on Dec. 19) to allow negotiations to continue. In less fractious news, there was apparently a presentation by WMATA about its Joint Development Opportunities around the Navy Yard station, including their work with Monument at 55 M Street (on top of the Half Street station entrance) as well as the Chiller Plant at Half and L and a small bit of land near the New Jersey Avenue station entrance. Am hoping to get more information about this....
 

The festival of legislation authorizing alley closings and street openings in Near Southeast fires up again tomorrow (Tuesday Dec. 5) with four bills coming before the city council's Committee of the Whole for referral to the full council for voting, although clearly little difficulty is expected since all four bills are also listed in the "First Reading on Proposed Bills" section of agenda of the legislative session scheduled to immediately follow. (For details on these bills, here's my description of their public hearings a few weeks back.) Then there's an additional alley closing (B16-0818, the east side of Square 701, the Cohen/Camalier/Welch land along 1st between M and N) scheduled for its final vote (having passed its first vote last month unanimously). And, while not an alley closing, there's also a final vote on B16-0929, the Capper PILOT funding bill (which also passed on on its first vote). If this schedule thrills you beyond measure, you can watch the council proceedings live beginning at 10 am on DC Cable Channel 13 or live webcast.
UPDATE, 12/6: The short of it: everything passed. Four of the alley bills still await their second reading and final vote, but the Willco Construction alley closing request at 1st and M is now completed (it was actually approved yesterday as emergency legislation), and the Capper PILOT funding bill passed on its second reading, too. (And thanks go to the city council staffers who help to guide me through this legislative maze.)
More posts: Capper, New Jersey Ave., staddis, Square 701
 

The four alley closings bills that had their public roundtables last week have now been added to the agenda for the Nov. 21 City Council Committee of the Whole session. This is a quick procedural step, where council officers report as to whether the bill is in good legal standing and whether the record is complete; if approved, the bills then are scheduled for their first readings, when bills can be debated by the council and amendments offered, and then voted on or tabled. Speaking of first readings, the fifth currently active Near Southeast alley closing bill (B16-0818, for the east side of Square 701, along First Street between M and N) will have its first reading and vote on Nov. 14.
UPDATE, 11/20: The Nov. 21 session has been postponed to Dec. 5, so these four bills will have to wait a few extra days. Note that the Dec. 5 session is also scheduled to have second reading/final votes on two other bills of interest, the Square 701 (west side/Cohen family) alley closings bill and the Capper PILOT funding bill. See my Upcoming Events calendar as always for details.

More posts: Capper, New Jersey Ave., staddis, Square 701
 

The big news of the day yesterday for DC was the Senate's passing of HR3699, which will transfer a number of federally controlled properties to DC, including Poplar Point and Reservation 13 (which are both large parts of the Anacostia Waterfront Initiative). The Post article mentions that this also includes some small properties along Potomac Avenue by the baseball stadium. There's also one other Near Southeast parcel (that I know of) in the land transfer bill, and that's Reservation 17A, a small bit of land along New Jersey Avenue north of the DPW trash transfer station at I Street, which now helps clear the way for the reopening of I Street between 2nd and New Jersey, a plan currently awaiting city council approval.
More posts: Anacostia Waterfront Initiative, New Jersey Ave., Nationals Park
 

Today was a bonanza of Near Southeast alley closing requests, as four pending bills received their public hearings in front of the city council "Committee of the Whole" (i.e., Chairman Cropp, the only council member in attendance).
The first was B16-0799, alley closings and new street designations as part of the Capitol Quarter/Capper Carrollsburg project. Nothing really new in the testimony, except that it has been requested that the bill be considered by the council on an emergency basis, in order to help speed the process of getting the project underway. Ms. Cropp called the project "very, very exciting" and seemed particularly enthused by the mixed-income aspect of the project, noting that the city's past creation of "economic ghettos" hasn't worked out well.
Next up was B16-0888, which seeks to reopen H and I streets between 2nd and New Jersey, and to close alleys and streets within those two blocks; I was not aware until today that a portion of this land is actually federal land (Reservation 17A), which is part of the land transfer bill currently pending before Congress. The northern block (Square 737, north of I) is where William C. Smith is planning a mixed-use project, which in their testimony they broke out as two office buildings totalling 600,000 sq ft, two apartment buildings totalling 600 units (with a 10% affordable housing component), 1100 parking spaces, and 80,000-100,000 sq ft of retail space. They mentioned that back when they first bought the land in 1999 they got a letter of intent from Whole Foods to include a grocery store in this location, but then Whole Foods came down and saw that at that point there wasn't a whole lot of development going on, they pulled out; but Smith is still very interested in getting a grocery store in this development. They anticipate beginning work on this project in 2008 and completing it in 2011. As for Square 739 (where the DPW trash transfer station currently resides), it is actually part of the Capper/Carrollsburg redevelopment, and plans are for a 322-unit apartment building with 115 affordable units, and also ground-floor retail. They don't anticipate beginning work on the building for at least another 4 to 5 years. Ms. Cropp did express some concerns about where the DPW vehicles will be relocated to, given the lack of industrial land left in the city.
After lunch was B16-0879, Monument Realty's request for alley closings on Square 701 between Cushing, Half, M, and N (in the block just north of the ballpark) as part of their "Ballpark Phase I" project, which also includes the expansion of the Navy Yard Metro station at Half Street, which Monument is responsible for as part of their purchase of the WMATA land on the southwest corner of Half and M. New news from the hearing is that there will also be a hotel in addition to the previously announced 275,000-sq-ft office building at Half and M and the 350-unit residential building (mix of rental and condo, with up to 20% affordable housing) at Half and N--Monument is working with W Aloft to develop a 200-key boutique hotel on Half Street. The entire project will have 700 parking spaces, and Monument is planning to begin construction in January 2007 so that these three levels of underground parking (as well as perhaps some of the 50,000 sq ft of planned ground floor retail) can be completed by Opening Day 2008; they will then continue work on the upper floors to have the entire project completed in 2009. UPDATE: I should also note that as part of their plans, Monument will be extending Cushing Place approximately 80 feet, so that it will run through to N Street
Finally came B16-0880, another request from Monument Realty, this time for alley closings on the west side of Square 700, just across Half Street from the Phase I project in the previous alley closing hearing. They are still negotiating with WMATA to attempt to purchase the bus depot land on Square 700, but in the meantime are moving forward with a 115,000-sq-ft/100 unit residential project on the northwest corner of Half and N, on the site of the Good N Plenty carryout (whose lease expires today, it was mentioned). This project will have 12,000 sq ft of ground-floor retail, which, given its location directly across from the stadium plaza entrance, will be quite a prime location. Ms. Cropp was concerned that the project will only have two levels/74 spaces of underground parking (you got the feeling that parking is very much on her mind these days!). There was no stated timeframe for this project, except to say "after Square 701." And of course by then they'll have probably secured the bus depot.
For all of these bills, the next step I believe is getting them on the council consent calendar, for votes to be taken.
Is that enough information? Can I stop now? :-)
UPDATE: These hearings are all available via DC Cable 13's on-demand video offerings.
 

Today's Post writes about the two lots in Near Southeast that WMATA has announced will be made available for private development, the 14,000-sq-ft lot on the Southeast corner of Half and L and a 4,000-ft patch around the eastern entrance to the Navy Yard station at New Jersey and M. Not really too much in the piece that I didn't address in my own entry eight weeks ago when WMATA announced the search, but it's also a nice way to be able to post here that the deadline for developers to submit their proposals is Nov. 17. The article does mention, however, that sometimes these joint development opportunities don't always move like wildfire: "Once WMATA chooses a developer, the proposals must be reviewed by local jurisdictions and the Metro board. Getting the appropriate permits can be a lengthy process. Developers at the Prince George's Plaza Green Line station were selected by WMATA in 2000 but broke ground only last year."

More posts: Chiller Site/WMATA, Metro/WMATA, mnorth, New Jersey Ave., square 698
 

City Council hearings have now been scheduled for October 31 for three Near Southeast alley closing bills (Monument's Square 700/west side and Square 701 requests, and William C. Smith's Square 737/739 request). I've added them to my busy Neighborhood Events Calendar; I've also (belatedly) added the DC Register announcement of the Alcoholic Beverage Regulation Administration hearing on the license request for a new liquor store at 156 L Street (the old Star Market) scheduled for Nov. 8. Note that the Square 701/east side alley closing bill had its hearing on Oct. 10. UPDATE, 10/20: The starting times of the three alley closing hearings on Oct. 31 have been revised, and an additional council roundtable has been scheduled for the same day on the Capper alley closings and new streets bill. All the hearing notices are available in this file, which also includes the notices on the Oct. 23 hearing on the Capper PILOT funding bill and also an Oct. 26 roundtable on LSDBE participation in the baseball stadium. My Neighborhood Events Calendar has been updated as well. Also, the Square 701/east side alley closing bill has been placed on the council's Nov. 14 consent agenda.
 

With thanks to loyal reader Eric for providing the needed push, I've added another detail map, this time for New Jersey Avenue, giving the scoop on what's planned along what could eventually be quite the grand boulevard. And I added a few new photos, too, including finally officially documenting the horse stables tucked under the Southeast Freeway just east of NJ Ave. (I guess I didn't want everyone running over there and bothering them :-). ) The other maps, for your perusing pleasure, are of the Stadium Corridor, M Street, and Capper/Carrollsburg (and I've tweaked the main map at left to highlight these additional offerings).

More posts: New Jersey Ave.
 

The City Council's long summer break is at last over, and three alley closing proposals that we've been hearing about all summer have finally been entered into the council's online legislation system: Monument Realty's requests for alley closings on both the west side of Square 701 and the southern section of Square 700 (both part of Monument's Ballpark District sites), and William C. Smith's request for realigning the streets in Squares 737N and 739 to make way for a 900,000-sq-ft mixed-use project at New Jersey and H. (And, just for fun, here's the description of what's being requested in Square 739: "[T]he closing of the public alley in Square 739, bounded by New Jersey Avenue, Canal, 2nd, and K Streets, S.E.; the opening [of] I Street, S.E. between 2nd Street and New Jersey Avenue, S.E.; the widening [of] 2nd Street, S.E. between I and K Streets, S.E.; the widening of New Jersey Avenue north of Canal Street, S.E.; the opening of H Street, S.E. to connect to New Jersey Avenue, S.E.; the closure of Closing Canal Street (North), Canal Street (South), and a portion of First Street, S.E.; to accept the dedication and designation of Reservation 17-A and Lot 801, Square 737N for public street purposes; to authorize the improvement of the dedicated land for street purposes; to authorize modifications to the permanent system of highways in the District of Columbia; and to designate the dedicated streets as I Street, S.E. and H Street, S.E and New Jersey Avenue, S.E. in Ward 6." Whew! UPDATE: I should also note that the two Monument Realty requests (Square 700 and 701) are delegated agenda items at the Oct. 5 National Capital Planning Commission meeting.
 

WMATA has released a Joint Development Solicitation for two sites in Near Southeast--the eastern entrance to the Navy Yard subway station at New Jersey and M, and the chiller plant on the southwest corner of Half and L. The sites would be offered for long-term leases, with the goal being Transit-Oriented Development: "safe, walkable, mixed-use communities that emphasize transit connections and reduce auto dependency." The 4.400-sq-ft New Jersey and M site is interesting because it butts up against Donohoe's planned 1111 New Jersey Avenue office building, and the JDS states: "The Anacostia Waterfront Corporation has indicated a preference for the ground floor area around WMATAs eastern entrance to be an attractive public plaza, complimenting the new development in the area. In this case, development on the parcel would largely occur above the street level." I'm not sure how you create an attractive public plaza that has development above it.... I'm guessing that Donohoe will be quite interested in this land (and their rendering of 1111 NJ does indeed show a very nice plaza). As for the chiller site at Half and L, it's 14,100 square feet, with a 7,700-sq-ft privately owned strip right next to it that combined could allow for a 200,000-sq-ft development (just like 20 M Street just to its south). With two other parcels at the corner of Half and L ready to be developed (the Nation site and the Ron Cohen Square 699N project), I'd imagine this site will garner a fair amount of interest. Proposals are due to WMATA on Nov. 17.
 
51 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6