Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: M Street
See JDLand's M Street Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


71 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

Thanks to the weekly update of the public version of the DC Property Sales database (which runs about five weeks behind), I can confirm what has been rumored for a little while now: on May 21, Monument Realty paid $14.26 million for the old Sunoco site at 50 M Street, on the northeast corner of Half and M. There's been no announcement as yet as to their plans for the 15,500-sq-ft site located between 20 M, 80 M, and a US government warehouse, and right across the street from the Navy Yard Metro west entrance and Monument's Half Street extravaganza. Just think--if Monument is the successful bidder later this year for WMATA's Southeastern Bus Garage, they'll control three of the four corners at Half and M. Monument Valley, indeed!

 

The antiwar group US Labor Against the War is protesting against the oil law that many in the U.S. government want to see the Iraqi government pass; the group contends that the U.S. company BearingPoint is the one writing the law, and so on Tuesday at 5 pm they will be holding a demonstration at BearingPoint's offices at 80 M Street SE, followed at 5:30 by a march to the U.S. Capitol--here's their flyer about the demonstration. And joining in the protest are people who are supporting the three Marine reservists facing possible disciplinary action for wearing parts of their uniforms during antiwar protests (read this Washington Post story for details on the Marines' tale). So, if you see some tumult on Tuesday, that's what it is.

More posts: 80m, M Street
 

Hot on the heels of the Zoning Commission's approval of William C. Smith's plan for its 190,000-sq-ft office building at 250 M Street, I've found an updated drawing of what the project will look like (designed by Hickok Cole Architects), and I've added it to my 250 M Street page. You can see how the building is designed to echo 1100 New Jersey Avenue, its neighbor across Canal Park.
 

Let's go around the horn and see what happened at last night's various meetings.
* The Zoning Commission voted to give final approval to the plans for 250 M Street, William C. Smith's planned 190,000-sq-ft office building on M Street just east of what will be Canal Park. The building, which is actually part of the Capper/Carrollsburg Planned Unit Development (and will help fund all the redevelopment at Capper), is expected to start construction at the end of 2007.
* ANC 6D had three Near Southeast items on the agenda--unfortunately, I wasn't able to attend, so I'm giving you the quick and dirty results, and will hopefully have links later for additional details. First, they gave their approval (again) to the 276-unit residential building planned by Camden Development at 1325 South Capitol Street, but this was pretty prefunctory since they approved it a few months back and nothing has really changed except a bureaucratic need to resubmit the plan to the Zoning Commission in a different manner; the ZC hearing is on May 31. Second, they voted not to support Zoning Commission Case 07-08, the request to amend the city's zoning laws to allow temporary (no longer than five years) surface parking lots on certain squares in Near Southeast to help provide parking for the new stadium. There was also a presentation by the DC Housing Authority on what's been happening with Capper/Carrollsburg and the Capper seniors buildings, but of course you've been reading this site religiously and so know it all already.
UPDATE: Apparently the feelings against the parking case ran pretty strong; and I understand that Andy Litsky of the ANC will be testifying in opposition at the Zoning Commission hearing next Monday (May 21).

 

From today's print edition of the Washington Business Journal (subscribers only for now), word arrives of two big Near Southeast real estate transactions: Opus East, developer of 100 M Street, is on track to purchase the 1015 Half Street/Nation site from Potomac Investment Properties (the story says Republic Investment, but I don't think that's correct). And Monument Realty is reportedly adding to its vast Hood holdings by buying the old Sunoco lot at 50 M Street. (I have heard rumors of these two items for weeks/months, but it turns out what I was hearing wasn't 100% accurate--score one for waiting for confirmation) The article says that Opus plans to retain the plans for a 440,000-sq-ft office building with retail on the Nation site, and are rumored to be paying $100 a square foot; Monument has not disclosed what it might do with the Sunoco site or what it's paying. The article also has some vague mention of some other transaction on the "corner of Half and K", but doesn't say which corner (the northeast and northwest ones are the two possibilities), or who's buying it. More on these transactions (such as actual prices) as I get it. (And yes, I'll have photos of the Nation demolition as soon as the sun comes out.)
 

Still working my way through the pile of pictures I took today.... New shots posted of the ongoing work at the Monument Half Street site, and also some "substantially complete" shots of 20 M Street--in a couple photos you can see men working on the far left window on M Street, and a reader gave me a heads up that not more than a few minutes after I came through, they posted a sign saying "Wachovia Coming Soon." So, if that's indeed the case, that would be the first 20 M tenant we've heard of.
More posts: 20 M, Monument Valley/Half St., M Street, Retail, staddis
 

UPDATE, 1/5: Adding a link to this piece in today's WashTimes on the Anacostia trolley pilot, which doesn't include much new info, but the Bloomberg piece linked to below has disappeared, so this is good to have; in the meantime, be sure to ignore other pieces like this one that try yet again to say that the Bolling line will connect riders to the baseball stadium by 2008, which is just patently false.
Hat tip to the CHT Shareholder Community blog for finding this Bloomberg article, "Washington Trolleys Go Back on Track in Mass Transit Encore," which discusses the plans that have been in the works since 2003 to bring light rail to DC. One thing that the article doesn't quite make clear--when it's talking about building the first 2-mile line (describing it as "pass[ing] near the Washington Nationals' new downtown ballpark"), it's glossing over the fact that this test line is being built in Anacostia, along the east side of the river, whereas Near Southeast and the stadium are on the west side of the river. You can go to the DC Transit Future web site to learn more about the Anacostia Streetcar Project (the test line) and about the long-range plans. The planned corridors do include M Street SE, the 11th Street Bridges, and South Capitol Street. But this project has had many delays over the years (see my first post on it, from October 2003), the Anacostia test line is already at least three years behind schedule; but at least back in October the Transportation Planning Board allotted $3 million to the Anacostia Streetcar Study and added the first phase of construction to the Constrained Long Range Plan, so it's finally getting some funding. But, In other words, don't plan on buying your tokens just yet :-).
 

Even though workers won't be moving into the new US Department of Transportation headquarters until spring (at least, that's the last I've heard), the work on the surrounding streetscapes continues. Over the past couple weeks both 4th Street and the "new" extended New Jersey Avenue south of M Street have been paved and striped--and now there are stoplights installed (but not yet operational) at 4th and M and New Jersey and M. So be on the lookout for those going live (and when they do, let me know). I don't know when 4th and New Jersey will actually open to traffic, I imagine it won't be until DOT opens. As for 3rd Street, which runs between the two DOT buildings, they've done a nice job with making it a pedestrian plaza--and in case you're a long-term visionary, you can note that 3rd Street is still up to the proper standards should it ever be decided to open it to vehicular traffic, in the hazy far-off future when the entire city isn't locked down to the point of ridiculousness.
More posts: US Dept. of Transportation HQ, M Street
 

Correspondent Erik reports that the Sunoco at Half and M, which closed over the summer and saw its underground storage tanks removed soon after, has now been completely demolished. Still no official word on what might be coming to that corner, the rumor of a hotel is all I've heard.... UPDATE: For passers-by wondering about the retro industrial brick building behind the Sunoco--now much more clearly visible from M Street--it's a US Government storage facility.

More posts: Homewood Suites, M Street
 

Tonight the Zoning Commission is having a public hearing on case 06-25, a text amendment to the Capitol Gateway Overlay that would include the west side of South Capitol Street in the CG Overlay and also establish a ZC review and approval process for new developments that abut South Capitol (as is currently the case for new projects along M Street). The Capitol Gateway Overlay spells out in extreme detail exactly what the requirements are for developments along South Capitol, M, and in the Ballpark District and over to Buzzards Point, and I suggest that anyone who is interested (or concerned) about the type of development that may be coming to Near Southeast should pour themselves 9 or 10 cups of coffee and read this document. (It's not a complete version because one doesn't currently seem to exist, I cobbled this together from various ZC documents.) The preamble is worth highlighting, to see how the city has spelled out what it envisions for the area:
The purposes of the CG Overlay District are to:
(a) Assure development of the area with a mixture of residential and commercial uses, and a suitable height, bulk and design of buildings, as generally indicated in the Comprehensive Plan and recommended by planning studies of the area;
(b) Encourage a variety of support and visitor-related uses, such as retail, service, entertainment, cultural and hotel or inn uses;
(c) Allow for continuation of existing industrial uses, which are important economic assets to the city, during the extended period projected for redevelopment;
(d) Provide for a reduced height and bulk of buildings along the Anacostia riverfront in the interest of ensuring views over and around waterfront buildings, and provide for continuous public open space along the waterfront with frequent public access points; and
(e) Require suitable ground-level retail and service uses and adequate sidewalk width along M Street, S.E., near the Navy Yard Metrorail station.
From there, you are treated to pages and pages and pages of very specific requirements set out for developers (i.e., items like "Each new building shall devote not less than thirty-five percent (35%) of the gross floor area of the ground floor to retail, service, entertainment, or arts uses ("preferred uses") [...]; provided, that the following uses shall not be permitted: automobile, laundry, drive-through accessory to any use, gasoline service stations, and office uses (other than those accessory to the administration, maintenance, or leasing of the building). Such preferred uses shall occupy 100% of the building's street frontage along M Street, except for space devoted to building entrances or required to be devoted to fire control.")
There is also a separate Southeast Federal Center Overlay, again laying out much detail about what is required and allowed for that development. There's even a great map on the last page that clearly shows the allowed uses, with the 5.4-acre waterfront park and residential-zoned areas being closest to the water (so there's no plan in place to allow office buildings right on the water or even near it; the commercial zones of the SEFC are all along First Street and M Street).
I think even just casual browsing through these documents can be a bit of an eye-opener for people (like me) who don't realize exactly how many requirements are already in place for these two areas. Of course, developers can ask for relief from certain rules (or the city council can just override the ZC altogether), but having documents such as these are a solid foundation. So it's good to know what's in them.
UPDATE: (like you're still reading) The Case 06-25 CG Overlay text amendment hearing was over last night in a flash; the record is being held open until Nov. 30, with action most likely to be taken at the ZC's Dec. 11 meeting.
More posts: M Street, South Capitol St., staddis, The Yards, zoning
 
71 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8