Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Monument Valley/Half St.
See JDLand's Monument Valley/Half St. Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


186 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 19
Search JDLand Blog Posts by Date or Category

Some little items to head into the weekend:
* The Capitol Riverfront BID is going with a Best of the 80s theme for its Riverfront Reel summer outdoor movie series, and has a survey up to determine the most popular flicks. (Though let me just say that the omission of Die Hard has me white with rage....)
* DDOT is holding an "Anacostia Waterfront Forum" on Feb. 17 at the MLK Library at 6:30 pm, "on the role that replacing the 11th Street Bridges will have in creating a more inclusive and sustainable Distrct."
* Also from the BID, news that the Earth Conservation Corps has scheduled a dedication ceremony for Diamond Teague Park on April 28. I've been told that if all goes "as planned," the construction of the in-water structures (the docks and the piers) should be completed by Opening Day, though the plantings and other work on the dry-land portion of the park would be completed by the beginning of July.
* Greater Greater Washington is not happy that the US DOT is having a "sale" on its parking spaces.
* City Paper's Housing Complex blog is bewildered about where this Capitol Quarter "neighborhood" might possibly be. (Teh Google probably could have answered that.)
* The US Department of Justice and some Shell Oil entities are nearing a $2.1 million settlement for damages and cleanup costs at the Southeast Federal Center (now the Yards) after what the feds allege was benzene, toluene, ethylbenzene and xylene contamination of soil and groundwater "from leaking underground storage tanks located at a former filling station adjacent to the contamination."
* I did attend last night's zoning hearing on Akridge's Half Street project, and will post a summary when I recover from the nearly four-hour session. But I did hear that the bus garage on the site will be demolished pretty soon, to make way for temporary parking. Both Akridge and Monument are talking with the Nationals about providing their spaces for gameday parking. (Monument has told me that their underground garage at 55 M--and the little addition to the south--will be complete by Opening Day.) That's a lot of spaces that weren't around last year....
* DCRA has restarted the Building Permits feed. And there was much rejoicing.
 

I took a nice tour of the action spots around the neighborhood today, getting updated photos of the very showy progress at Capitol Quarter and 1015 Half Street.
I also snuck across the river (don't tell) to get a peek through my zoom lens at the goings-on at Diamond Teague Park, plus I took a photo or two through the fence at First and Potomac. It looks like the gangplank from the shore to the pumphouse has been dismantled; and there's definitely "in-water" work going on.
I also got a good batch of updated photos for 55 M, and gave my Monument Half Street page a badly needed refreshing--there's also this shot of the construction on the extension of the underground garage (and the shored-up hole on the south end of the block), as seen from Nats Parking Garage B.
I even took my first(!) set of photos at 11th and L, where the Southeast Freeway bends toward the 11th Street Bridges, to get an official "before" baseline in advance of the reconstruction and reconfiguration of it all. (And I found this plaque on one of the flyover pillars, which might be worth a chuckle or two.)
If you want to see the entire batch of new photos on a single page, here they are, though it's about a hundred of them so be patient. But the links above are better if you want to see them matched with their "before"s.
(Oh, and that dinky little For Sale sign at 10th and M by the Exxon that I wrote about on Friday is gone. Drunken property advertising?)
Comments (0)
More posts: 1015 Half, 55 M St., Capper, Capitol Quarter, Monument Valley/Half St., square 697, Teague Park
 

Some items from the past few days. Big ones first:
* It's probably been true for weeks, but I've just now been by Diamond Teague Park for the first time in a while and can confirm that construction is definitely underway there. Fences are up, cranes (three of them?) are in place, and workers were there. Pictures tomorrow. (Probably *lots* of pictures tomorrow from all over, as long as the weather stays reasonably clear.)
* City Paper got its hands on the letter Mayor Fenty sent to DC Delegate Norton about the city's priorities should the Feds decide to toss some stimulus package dollars in this direction. As I predicted, the two Near Southeast bridge projects were mentioned: "In particular, aspects of the Eleventh Street and South Capitol Street Bridge replacement projects could be undertaken immediately." He also mentions the city's backlog of maintenance projects, along with investments in Metro and the implentation of the streetcar project. And school modernization. And public safety issues.And environmental initiatives. And housing affordability. And health care. (And now here's the stimulus bill itself, though it doesn't get down into specific projects. On the other hand, considering these two bridges ease the commutes to and from the district of the House Majority Leader....)
* Back in mid-November, the transfer of the plot of land known as Reservation 17A from the Feds to the city finally took place; it runs between New Jersey Avenue and Second Street, and is straddled by the trash transfer station building. With this now under District control, various wheels can start turning in that area, including allowing the establishment of I Street between Second and New Jersey that will form the southern boundary of WC Smith's 800 New Jersey Avenue project. There's hopes that the trash transfer station could be demolished in 2010.
* Reader T. reported yesterday that a small bought-at-the-hardware-store For Sale sign went up at 10th and M yesterday, in front of the fence of the Exxon station. I'm not sure what the deal is, since the land is actually owned by the Exxon Corporation, and you'd think they'd have better methods of marketing the land.
* The public notice for the March 19 Zoning Commission hearing on various Capper PUD alteration requests is now available.
* WBJ reports that the Nationals have parted ways with Centerplate, last year's concessionare at the ballpark. This year it will be Levy Restaurants for the food and Facility Merchandising Inc. for the retail.
* More of the fences are coming down at 55 M, as you can see on the web cam. (Though it took me more than a month to notice that the plywood "tunnel" at the Metro exit had disappeared.)
* The Douglass Bridge will be closed at 5 am Sunday until 10am-ish to test the swing span.
 

On my way back from the ANC 6D meeting, I noticed a couple items worth mentioning:
* The glass has now been completely installed around the Half and M entrance to the Navy Yard Metro station, at 55 M Street. I know everyone just *loved* the cyclone fences that had been there, but time marches on. The plans approved by the Zoning Commission called for a special backlit treatment ("frit") of the glass--we'll see if that's still part of the design.
* There's a long row of construction barrels in the middle of M between Cushing and First. Perhaps someone who's seen the work can comment, but my uneducated guess is that they are preparing to rebuild the median there. The developers of 100 M were given permission to remove the existing median there and between First and New Jersey so that they could occupy the curb lane, as long as they agreed to reinstall the medians afterward. Given how close 100 M is to opening, and with the sidewalk now open, I imagine this is probably what's going on. And not a moment too soon--I need back my places to stand for middle-of-the-street photos!
Comments (0)
More posts: 55 M St., Metro/WMATA, Monument Valley/Half St., M Street
 

The front page of Tuesday's Post has "Building Slowdown Turns Grand Visions into Vapor," a look at projects in the DC area that are on hold because of the slumping economy: "The economic boom of recent years promised to deliver gleaming homes and high-end retail to struggling and newly forming neighborhoods across the Washington region. But that quest is running headlong into a withering economic slowdown and paralyzed credit markets, bringing new construction to a virtual stop and fueling anxiety among those who dreamed that their neighborhoods were the next frontiers."
Among the examples in the article are three delayed projects near the ballpark--WC Smith's 250 M Street office building, the residential and hotel portion of Monument's Half Street project, and also the Corcoran's Randall School development at Half and I, SW (which Monument pulled out of recently): "Perhaps no area is more central to the District's long-term ambitions than the streets around Nationals Park. At every opportunity, Fenty talks of a cosmopolitan destination featuring new parks, offices, stylish apartments and restaurants, all of it along the Anacostia River. Yet, how soon that vision materializes is fraught with uncertainty."
(Full disclosure: I provided a bit of basic status on ballpark-area projects for the piece, hence the "contributed" line.)
Some additional perspective: Certainly there's a slowdown afoot. (It's almost like there's some sort of cycle of boom and bust in commercial real estate!) I've been joking that I should just put a "Gone Fishin'" sign up here at JDLand during 2009, and come back in 2010 to see what's cooking, because other than the first offerings at the Yards and perhaps Canal Park {cough}, I'm not expecting much to get underway in the next little while. On the other hand, Capitol Quarter is moving forward, 1015 Half Street is now out of the ground, Diamond Teague Park is expected to open in the spring, and 100 M and 55 M and 909 New Jersey and Velocity will all be opening their doors before long, and perhaps the lure of another season of baseball will get some retail into the empty ground-floor spaces of those buildings and 20 M.
So, it's not like tumbleweeds are blowing down M Street or vines are growing on buildings a la Logan's Run--and it would be hard to make the case that it's the neighborhood's fault or the stadium's fault when the entire region is feeling the pain. The expectation would be that when the market improves, development in Near Southeast should pick up again. But we'll all just have to wait and see, won't we?
 

Reader M., who keeps a better eye on the Monument Half Street web cam than I do, has passed along the word that, within the past week, the Half Street Hole (just north of Nationals Park) has started being re-filled with dirt, except for the far northern portion where additional underground garage space next to the 55 M Street office building is being completed. The small piece of garage construction is where a new street dubbed "Monument Street" has been planned, to connect Half to Cushing Street to the east; doing this work also will now give southern walls to the 55 M garage. The rest of the block is where Monument had plans for a 200-room hotel and 340 residential units, along with lots of ground-floor retail. I don't know anything beyond what I'm seeing on the webcam, so we'll have to wait to find out What This Means (though certainly filling back in a three-story hole isn't particularly likely to indicate a project moving forward).
Comments (0)
More posts: Monument Valley/Half St.
 

A bunch of items to start the week with:
* Remember that the west entrance to the Navy Yard Metro station at Half and M is closed every evening this week from 8 pm until closing, thanks to work on 55 M Street.
* On Monday (Nov. 13), the Zoning Commission gave final approval to moving 225 Virginia Avenue into the Capitol South Receiving Zone, which will allow any construction on the block to have greater height and density than the 6.5 FAR/90-ft-height currently allowed. This was approved with two caveats: that there is Zoning Commission review of the design of the portions of a building proposed to rise higher than 90 feet to confirm that the building will be sufficiently setback from the eastern building face, and that any structure will provide a suitable northern focal point for the Canal Blocks Park. Read my entry from the hearing a few weeks ago for more information.
* On Nov. 24 at 2 pm, the city council will be having a hearing about B17-0909, the "Taxation Without Representation Street Renaming Act of 2008," which would "designate the portion of South Capitol Street, SE that intersects with N Street SE and Potomac Avenue SE as 'Taxation Without Representation Street, SE." It just so happens that this is the portion of South Capitol Street that runs alongside Nationals Park, where the council was thwarted in earlier attempts to install an electronic tote board showing the federal taxes that DC residents pay while still having no voting representation in the US Congress.
* Tommy Wells is taking nominations for the Second Annual Livable, Walkable Awards.
* For weeks I've been meaning to post that Nationals Park made the list of Travel and Leisure Magazine's "Must-See Green American Landmarks," thanks to being the first LEED-certified professional sports facility.
 

Folks watching the Half Street Hole just south of 55 M Street have noted the arrival of a crane in the past few days. I've contacted Monument Realty, and they've confirmed that some construction is getting underway--but it's just to complete the three-level underground garage on the southern portion of the street, not to begin the hotel and residential projects. Perhaps all that parking directly north of the ballpark is seen as some worthwhile income while waiting for the residential market to improve....
Comments (0)
More posts: Monument Valley/Half St.
 

One of the many folks on the ground keeping an eye on the neighborhood while I slack off these days has reported that concrete is being poured in the bottom of the hole on the south end of Monument's Half Street project. You can see it on the 55 M web cam if you zoom in; judging from the web cam archive, it looks like the first bits of action began in September, with real work getting underway a week ago. This south end of the block is where Monument has been planning a hotel and 340 residential units, which were originally slated to be finished by the end of 2009 or early 2010.
In mid-September, when a construction trailer was delivered to the south end of the site and a "Bovis" sign went up, I contacted Monument to ask if this meant that work was getting underway; I was told the while they are "hoping" to begin the hotel/residential project by the end of the year, the movement seen at Half and N was for work related to the office building and other improvements (not defined) on Half Street. We'll see if there's some sort of announcement or communique as to what's happening.
In other Monument Half Street news, their public space permit request for various fixtures (" 23-benches, 9 trash containers, 32 lights, 146 fountains, 8 bollards, 18 bike racks") at 1200 Half is now going to be heard at the Oct. 23 Public Space Committee meeting, after having been postponed from September. I can't wait to find out what the heck this "146 fountains" part of the agenda item actually means!
Comments (0)
More posts: 55 M St., Monument Valley/Half St.
 

Today's Post has a piece that gives more details on how Monument Realty has been tied to Lehman Brothers over the years, and how that might impact Monument's Half Street project: "In addition to an equity stake in Monument's Half Street project with San Francisco-based MacFarlane Partners, Lehman holds a $12 million secondary loan and Chicago-based Corus Bank holds the $72 million construction loan on the first phase of that development, a nine-story office building rising above the Navy Yard Metro stop. The rest of the project has not secured outside financing. [...] Monument began searching for another investor to buy out Lehman's positions soon after the credit markets began to tighten. Some bids were presented earlier this year, two sources familiar with the negotiations said, but Lehman rejected them as too low."
Comments (0)
More posts: Monument Valley/Half St.
 
186 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 19
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.