Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Monument Valley/Half St.
See JDLand's Monument Valley/Half St. Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


186 Blog Posts Since 2003
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 19
Search JDLand Blog Posts by Date or Category

The City Council's long summer break is at last over, and three alley closing proposals that we've been hearing about all summer have finally been entered into the council's online legislation system: Monument Realty's requests for alley closings on both the west side of Square 701 and the southern section of Square 700 (both part of Monument's Ballpark District sites), and William C. Smith's request for realigning the streets in Squares 737N and 739 to make way for a 900,000-sq-ft mixed-use project at New Jersey and H. (And, just for fun, here's the description of what's being requested in Square 739: "[T]he closing of the public alley in Square 739, bounded by New Jersey Avenue, Canal, 2nd, and K Streets, S.E.; the opening [of] I Street, S.E. between 2nd Street and New Jersey Avenue, S.E.; the widening [of] 2nd Street, S.E. between I and K Streets, S.E.; the widening of New Jersey Avenue north of Canal Street, S.E.; the opening of H Street, S.E. to connect to New Jersey Avenue, S.E.; the closure of Closing Canal Street (North), Canal Street (South), and a portion of First Street, S.E.; to accept the dedication and designation of Reservation 17-A and Lot 801, Square 737N for public street purposes; to authorize the improvement of the dedicated land for street purposes; to authorize modifications to the permanent system of highways in the District of Columbia; and to designate the dedicated streets as I Street, S.E. and H Street, S.E and New Jersey Avenue, S.E. in Ward 6." Whew! UPDATE: I should also note that the two Monument Realty requests (Square 700 and 701) are delegated agenda items at the Oct. 5 National Capital Planning Commission meeting.
More posts: Monument Valley/Half St., New Jersey Ave., WC Smith/Square 737, staddis, Square 701
 

With the latest news about Florida Rock's design modifications, Monument Realty's bid for the WMATA land at Half and M, the still-in-limbo Stadium Garages Wrapped With Development Goodness, and the apparent moving forward by the Cohen, Camalier/Davis, and Welch families to develop their land along First Street, it appears that the Ballpark District is moving forward, despite the AWC's still never having released it's "Development Strategy" for the area. So, fresh off my success with my North of M map, I've created a Ballpark District map to better help keep track of what's happening. Be aware that the boundaries I drew for the new public plaza at the foot of 1st Street are not really based on anything other than trying to remember how it looked in Florida Rock's exhibits to the ANC. And no final design for the traffic roundabout at South Capitol and Potomac has been released yet, either. UPDATE: And, for the heck of it, I just added a page with both maps fused together, creating a pretty nice Stadium Corridor Development Guide. But be prepared to scroll :-).
More posts: Florida Rock, Metro/WMATA, Monument Valley/Half St., staddis, Square 701
 

Monument Realty has added to it's web site an "Upcoming Projects" page, listing "Ballpark District - Phase 1." This is the project on the east side of Half Street between M and N we've been hearing about, but it's nice to see it "confirmed" on their web site. It's described as 275,000 sq ft of office space (which would be at M Street, above the Navy Yard Metro station) and 450 condos (down toward N Street and the stadium). The site says "more details to come by Spring Training 2007." No word yet on the outcome of the bidding for the WMATA land.
More posts: West Half St., Metro/WMATA, Monument Valley/Half St., staddis
 

The parade of alley closings and street closings/realignments this year in Near Southeast continues, as the National Capital Planning Commission has on its September meeting agenda the proposed closing of a public alley in Square 701 (the square bounded by 1st, M, N and Half Streets, SE--see my cruddy tax parcel map for assistance on where the squares are). I figured that this was going to be the alleys in the footprint of the Monument/WMATA properties, since Monument has made clear it's plans to move forward with developing the land along Half Street, but instead I find out that the alley closings being requested are on the east side of the Square, between Cushing Place and 1st Street, where the land is owned by the Cohen and Camalier families, who have said little about their plans for these properties. Does this mean we'll be seeing development coming to 1st Street south of M soon, too? And believe it or not, as I was writing this very entry, I received word that Monument has now filed it's application for alley closings on the west side of Square 701 as well as one small alley on Square 700 (behind the Amoco Station). Note that neither of these applications request closings of Van or Cushing. These applications follow successful alley closing requests already this year for Square 0743N as part of the 100 M and 1100 1st Street projects, the street/alley closings for the new ballpark, and the closed alleys and new streets for Capper/Carrollsburg--plus there are the still-pending requests to realign the streets in Square 737 in preparation for William C. Smith's big mixed-use project at 2nd and H and the Lerners' request to close a small portion of an alley in Square 697 as part of their 1000 South Capitol office project (no bills for these yet appearing in the DC Council legislation database).

 

From today's Washington Business Journal print version (available online to subscribers only for 30 days), news that Monument Realty, which owns most of the land facing Half Street between M and N not controlled by WMATA, has stopped waiting for the Anacostia Waterfront Corporation to get the Ballpark District rolling and has submitted an unsolicited proposal directly to WMATA to incorporate the Navy Yard Station's Half-and-M entrance and the adjacent WMATA parking lot into an office building that Monument wants to build. Metro then put out a Request for Proposals so that other developers could bid on the land (bids are due by 3 pm Aug. 21). If Monument's bid is successful, they say they can move forward "more promptly" with their plans for an office building with ground floor retail at that spot. AWC doesn't really seem all that concerned; Adrian Washington is quoted as saying "Our goal is to redevelop the ballpark district. We're fine either way." Monument, which would manage the government-funded $15 million expansion of the Metro station, says that they need to get control of the property ASAP in order to be able to have the station upgrades completed by Opening Day 2008. The article also notes that AWC expects to have a land disposition agreement completed by next month for Forest City Washington to purchase a portion of the WASA land at 1st and O; but color me a bit skeptical on timeline announcements from AWC these days.
More posts: Anacostia Waterfront Corp., Metro/WMATA, Monument Valley/Half St., staddis
 

This week's Washington Business Journal has "Developers, AWC Wrestle with Ballpark-Area Plans" (not yet available online). It mentions (just like someone else!) that the unveiling of the Ballpark District Master Plan is now more than two months behind schedule, and that the lack of plan is hampering what is already a pretty complicated venture, especially when you add in the new potential garages deal with Western Development and the fact that the AWC still has not finished negotiating with either WMATA or WASA to get access to their acreages that are considered part of the Ballpark District. AWC head Adrian Washington says he'll have something ready for the council to approve by fall (though it would then need approval by the Zoning Commission as well), but you wonder if Monument Realty (one of the four Master Developers, and the only one that actually owns land within the Ballpark District) is starting to get just an itsy bit antsy to start building and start recouping their $50 million investment....
More posts: Anacostia Waterfront Corp., Metro/WMATA, Monument Valley/Half St., staddis, zoning
 

A story in Wednesday's Baltimore Examiner about the Cordish Company signing a deal with NASCAR to develop a string of racing-themed restaurants also gives a teeny tiny bit of information about Cordish's part of the Nationals stadium Ballpark District (Cordish and Monument Realty are working together to plan the northern part of the district, the "gateway" to the park from M Street to N Street and from South Capitol to 1st). According to the article, "plans for the company's Nationals stadium development are expected in the next few weeks." (Original delivery date for the AWC's Ballpark District Master Plan was April 15, but who's counting?) Also from the article: " 'The goal is to create a truly vibrant destination and gateway into the stadium,' said Jon Cordish, vice president of Cordish. 'It will be a dynamic and entertaining ground-floor experience [similar to what] we've done throughout the country on these types of developments.' Cordish is also creating entertainment districts for the St. Louis Cardinals and the Pittsburgh Steelers. While no concrete plans have been released yet on what the Nationals development will look like, John Cordish said the company is exploring licensing options, such as the NASCAR Sports Grille, as well as original concepts. 'Aspects of it may well feel like the Inner Harbor at Baltimore, yes,' he said. 'But will there also be things unique to the Anacostia Waterfront? Definitely.' "

More posts: Anacostia Waterfront Corp., Monument Valley/Half St., staddis
 

This week's Washington Business Journal has a cover story ("Seeing the Future") about the coming Ballpark District, and the challenge of creating from a blank slate something new and vibrant that works but isn't "Disneyfied." There's a lot of comment from architects and planners about which design cues the area should take (Navy Yard and Southeast Federal Center, not the stadium itself). A little bit of news: Monument Realty is planning its first two buildings in the Ballpark District, on the east side of Half Street between M and N, a residential project designed by Shalom Baranes (one of the firms working on the SEFC) and an office building designed by Davis Carter Scott. (UPDATED to add the link now that the story's posted.)
More posts: Monument Valley/Half St., staddis, Nationals Park, The Yards
 

A beautiful afternoon for a photo excursion, and you can see a smattering of new shots on my pages for 20 M Street, the Ballpark District (with shots of the new bright-yellow Monument Realty signs), Capper/Carrollsburg (where in one month they've managed to demolish just two of the two-story buildings at 3rd and Virginia), Capper Seniors #2 (which is showing good progress) and of course the baseball stadium. The icon is your guide for the latest offerings.
More posts: 20 M, 400m, Capper, Capper Senior Apt Bldgs, Monument Valley/Half St., staddis, Nationals Park
 

Within the past few days, a series of bright yellow signs have appeared along N Street and Half Street, across from the northern edge of the ballpark site--the signs are all from Monument Realty, which has spent nearly $40 million buying property to build nearly 750,000 sq ft of mixed-use offerings as part of the Ballpark District (not the area on the stadium land that the parking garage squabble is endangering, but the two blocks between N and M and South Capitol and 1st). The signs have big baseball-related slogans on them, like "Play Ball!", "Heavy Hitter", "Home Run" and so on, and then the Monument Realty name and logo, but no information on what's coming. A Post article from March did quote Monument as saying that they plan to begin construction in early 2007, so perhaps we'll hear details before long.
More posts: Monument Valley/Half St., staddis
 
186 Posts:
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 19
Search JDLand Blog Posts by Date or Category