Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Metro/WMATA
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


218 Blog Posts Since 2003
Go to Page: 1 | ... 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 ... 22
Search JDLand Blog Posts by Date or Category

With the latest news about Florida Rock's design modifications, Monument Realty's bid for the WMATA land at Half and M, the still-in-limbo Stadium Garages Wrapped With Development Goodness, and the apparent moving forward by the Cohen, Camalier/Davis, and Welch families to develop their land along First Street, it appears that the Ballpark District is moving forward, despite the AWC's still never having released it's "Development Strategy" for the area. So, fresh off my success with my North of M map, I've created a Ballpark District map to better help keep track of what's happening. Be aware that the boundaries I drew for the new public plaza at the foot of 1st Street are not really based on anything other than trying to remember how it looked in Florida Rock's exhibits to the ANC. And no final design for the traffic roundabout at South Capitol and Potomac has been released yet, either. UPDATE: And, for the heck of it, I just added a page with both maps fused together, creating a pretty nice Stadium Corridor Development Guide. But be prepared to scroll :-).
 

WMATA has released a Joint Development Solicitation for two sites in Near Southeast--the eastern entrance to the Navy Yard subway station at New Jersey and M, and the chiller plant on the southwest corner of Half and L. The sites would be offered for long-term leases, with the goal being Transit-Oriented Development: "safe, walkable, mixed-use communities that emphasize transit connections and reduce auto dependency." The 4.400-sq-ft New Jersey and M site is interesting because it butts up against Donohoe's planned 1111 New Jersey Avenue office building, and the JDS states: "The Anacostia Waterfront Corporation has indicated a preference for the ground floor area around WMATAs eastern entrance to be an attractive public plaza, complimenting the new development in the area. In this case, development on the parcel would largely occur above the street level." I'm not sure how you create an attractive public plaza that has development above it.... I'm guessing that Donohoe will be quite interested in this land (and their rendering of 1111 NJ does indeed show a very nice plaza). As for the chiller site at Half and L, it's 14,100 square feet, with a 7,700-sq-ft privately owned strip right next to it that combined could allow for a 200,000-sq-ft development (just like 20 M Street just to its south). With two other parcels at the corner of Half and L ready to be developed (the Nation site and the Ron Cohen Square 699N project), I'd imagine this site will garner a fair amount of interest. Proposals are due to WMATA on Nov. 17.
 

Monument Realty has added to it's web site an "Upcoming Projects" page, listing "Ballpark District - Phase 1." This is the project on the east side of Half Street between M and N we've been hearing about, but it's nice to see it "confirmed" on their web site. It's described as 275,000 sq ft of office space (which would be at M Street, above the Navy Yard Metro station) and 450 condos (down toward N Street and the stadium). The site says "more details to come by Spring Training 2007." No word yet on the outcome of the bidding for the WMATA land.
More posts: West Half St., Metro/WMATA, Monument Valley/Half St., staddis
 

The parade of alley closings and street closings/realignments this year in Near Southeast continues, as the National Capital Planning Commission has on its September meeting agenda the proposed closing of a public alley in Square 701 (the square bounded by 1st, M, N and Half Streets, SE--see my cruddy tax parcel map for assistance on where the squares are). I figured that this was going to be the alleys in the footprint of the Monument/WMATA properties, since Monument has made clear it's plans to move forward with developing the land along Half Street, but instead I find out that the alley closings being requested are on the east side of the Square, between Cushing Place and 1st Street, where the land is owned by the Cohen and Camalier families, who have said little about their plans for these properties. Does this mean we'll be seeing development coming to 1st Street south of M soon, too? And believe it or not, as I was writing this very entry, I received word that Monument has now filed it's application for alley closings on the west side of Square 701 as well as one small alley on Square 700 (behind the Amoco Station). Note that neither of these applications request closings of Van or Cushing. These applications follow successful alley closing requests already this year for Square 0743N as part of the 100 M and 1100 1st Street projects, the street/alley closings for the new ballpark, and the closed alleys and new streets for Capper/Carrollsburg--plus there are the still-pending requests to realign the streets in Square 737 in preparation for William C. Smith's big mixed-use project at 2nd and H and the Lerners' request to close a small portion of an alley in Square 697 as part of their 1000 South Capitol office project (no bills for these yet appearing in the DC Council legislation database).

 

From today's Washington Business Journal print version (available online to subscribers only for 30 days), news that Monument Realty, which owns most of the land facing Half Street between M and N not controlled by WMATA, has stopped waiting for the Anacostia Waterfront Corporation to get the Ballpark District rolling and has submitted an unsolicited proposal directly to WMATA to incorporate the Navy Yard Station's Half-and-M entrance and the adjacent WMATA parking lot into an office building that Monument wants to build. Metro then put out a Request for Proposals so that other developers could bid on the land (bids are due by 3 pm Aug. 21). If Monument's bid is successful, they say they can move forward "more promptly" with their plans for an office building with ground floor retail at that spot. AWC doesn't really seem all that concerned; Adrian Washington is quoted as saying "Our goal is to redevelop the ballpark district. We're fine either way." Monument, which would manage the government-funded $15 million expansion of the Metro station, says that they need to get control of the property ASAP in order to be able to have the station upgrades completed by Opening Day 2008. The article also notes that AWC expects to have a land disposition agreement completed by next month for Forest City Washington to purchase a portion of the WASA land at 1st and O; but color me a bit skeptical on timeline announcements from AWC these days.
 

A correspondent passes along this link, a July 6 story originally from GlobeSt.com (which goes behind a paywall soon after publishing stories), "Monument Details Plans for Half Street." Nothing earthshatteringly new in this piece, but for folks who don't follow every iota of news in Near Southeast like SOME people, it's a good summary of what will be coming to the Ballpark District area just north of the stadium. Monument has bought all available land (the WMATA properties not being for sale) that faces Half Street between M and N, plus all the parcels facing N between Half and South Capitol, and about half of them between Half and 1st. They are planning to begin construction in mid-2007 of their Phase I, which apparently is the land on the east side of Half Street. There will be a 250,000-sq-ft office building on top of the Navy Yard Metro station at Half and M, and also a 450,000-sq-ft residential building along Half Street. The article says that "the tone of the street . . . is supposed to be celebratory, urban streetscape, . . . with restaurants on both sides." The news to me in this is that Monument will be able to develop the air rights above the Metro station as well as the WMATA lot in this first phase. Also possibly part of Phase I, according to the article, is a 125,000-sq-ft office building at the site of the Good and Plenty carryout on the northwest corner of Half and M. My Ballpark District page has lots of photos of these sites (now nicely festooned with the bright yellow Monument Realty signs). But we'll find out much more about these plans whenever the Anacostia Waterfront Corporation finally gets around to releasing the Ballpark District Master Plan. And, for those of you who often ask about the land bounded by 1st Street, Cushing, M, and N, I still have no news for you--it's owned by a couple of different families with ties to DC-area development, but no plans have been announced.
More posts: West Half St., Anacostia Waterfront Corp., Metro/WMATA
 

This week's Washington Business Journal has "Developers, AWC Wrestle with Ballpark-Area Plans" (not yet available online). It mentions (just like someone else!) that the unveiling of the Ballpark District Master Plan is now more than two months behind schedule, and that the lack of plan is hampering what is already a pretty complicated venture, especially when you add in the new potential garages deal with Western Development and the fact that the AWC still has not finished negotiating with either WMATA or WASA to get access to their acreages that are considered part of the Ballpark District. AWC head Adrian Washington says he'll have something ready for the council to approve by fall (though it would then need approval by the Zoning Commission as well), but you wonder if Monument Realty (one of the four Master Developers, and the only one that actually owns land within the Ballpark District) is starting to get just an itsy bit antsy to start building and start recouping their $50 million investment....
 

A sharp-eyed correspondent passes along this press release from WMATA, announcing that Metro is finally removing the buses parked on a leased lot at Half and O, land that was seized by the city via eminent domain for the new ballpark. (The buses will be moving to a lot leased from Pepco at 1st and R, SW, with the city picking up the "costs associated with the move.") With this, all stadium footprint land has been vacated by its (former) tenants. Is the start of demolition still coming May 1 or thereabouts? Haven't heard anything more one way or the other. Tick tick tick!
More posts: Metro/WMATA, Nationals Park
 

At tonight's ANC 6D meeting (you all owe me!), there was a presentation on the new baseball stadium, by a group including the DC Sports and Entertainment Commission, Clark/Hunt/Smoot, and Marshall Purnell of Devrouax and Purnell, the local architects working with HOK Sport on the stadium design. Much of the time was spent going over the renderings (which of course you've already looked at a billion times here on my site!), but there were some items of interest, including a construction timeline of sorts (this is from my notes, apologies if I get any construction-speak wrong):
· Official "construction" is scheduled to begin May 1. (Or within 5-6 days on either side.) Construction will begin at 1st and O, and will work clockwise around the stadium footprint. (The dates below are for when a phase is expected to begin at 1st and O, and then move clockwise around the site.)
· 300,000 cubic yards of soil will need to be removed.
· Pile driving is expected to begin in late May, with concrete work then following, expected to take 9 months in all.
· Structural steel work is expected to begin in early October, and the steel has already been purchased and ordered.
· Structural precast mumblemumblemumble (I'm a rotten secretary) is expected to begin in December, after which seats can begin to be installed, probably in January/February 2007.
· The structure would "top out" somewhere around June or July 2007.
· Construction cranes are to be out of the infield by August 2007, to have time to build the irrigation system and start growing the grass.
Other fun tidbits about the construction: there is a "jog" in the center field fence to echo a similar irregularity in the old Griffith Stadium (where the Senators played). And yes, they are going to try to make some of the lower-level seats "shakeable" like the bleachers at RFK (with perhaps some safety measures actually built in this time). As for concerns about the stadium's lighting, there are only two light towers (in the outfield); the rest of the lights are all on the underside of the stadium's canopy and so are not visible from outside the stadium. As for the current occupants of the site, the asphalt plant at 1st and O Street is being dismantled piece by piece so that it can be rebuilt at whatever location it eventually moves to. Also, they haven't yet managed to get WMATA to move its buses off the parking lot at 1st and O. There is to be a community meeting on April 19 at Friendship Baptist Church in Southwest to discuss the creation of an advisory committee; I'll post more about this when I get it.
More posts: ANC News, Metro/WMATA, Nationals Park
 

Technically, it was a formality (although with this crew, you never know), but the final reading of the stadium lease agreement just passed the city council, 9-4. Will post stories here as they become available.
UPDATE, 9:04 pm: In the meantime, what's next, other than much rejoicing from some quarters and doom and gloom from others? The design should be unveiled soon, and will have to get approval from the Zoning Commission. The city will probably get back in front of Judge Zeldon ASAP to get the ruling to evict the landowners in the stadium footprint. The bonds to actually fund everything will be sold sometime in 4-6 weeks. And MLB will name an owner, maybe by opening day? Then there will be (perhaps in mid-April) news from the Anacostia Waterfront Corporation as to the plans for the Ballpark District--I would hazard a guess that they're going to try real hard to have at least the stretch along Half Street between M and L well-developed with restaurants and retail by Opening Day 2008. Which means that the city and WMATA need to figure out where that Half Street bus depot is going to go. And maybe by early May demolition will begin. And... and... and....
UPDATE, 10:28 pm: Here is the AP story about the votes. Jack Evans is quoted as saying that the city hopes to unveil the designs next week, with a groundbreaking in late April.
UPDATE, 11:26 pm: And the Post story.
UPDATE, 12:57 am: And the WashTimes story, which has this item: "Clark officials already have locked in prices on most of the stadium materials, including steel. Those prices remain valid as long as construction begins before June. Sports commission officials said the construction team can complete the stadium in time for Opening Day in 2008 provided they have access to the land soon. However, the stadium could open as late as July 31 of that season without penalty from the league."

More posts: West Half St., Metro/WMATA, staddis, Nationals Park, zoning
 
218 Posts:
Go to Page: 1 | ... 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 ... 22
Search JDLand Blog Posts by Date or Category