Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: meetings
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


194 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 20
Search JDLand Blog Posts by Date or Category

CSX announced today that it will be investing $160 million of its own monies in its National Gateway project, with most of that money going toward the funding of the expansion of the Virginia Avenue Tunnel, the 107-year-old structure that runs beneath Virginia Avenue from 2nd Street SE to 12th Street SE. With this decision, the company will start moving toward design and construction of the project, first by going through the NEPA process of environmental impact studies, which apparently is going to be spearheaded by the Federal Highways Administration (with support and assistance from DDOT, according to CSX).
Within the next few months there will be an initial public "scoping" meeting, where the parties lay out exactly what needs to be done with the tunnel and why. After a 30-day comment period expires, an "alternatives" meeting will then be scheduled, and this will be the meeting that residents will be the most interested in, because this will be when the design options for the project will first be made public, and will be the stage where CSX will at last answer the questions that so many people who live on or near Virginia Avenue have wanted answered since this project first really hit the public consciousness in late 2009. (Will the trench be completely uncovered? Will we be able to get into our alley? How will firetrucks service our block? What about noise? What about dust? What about traffic? What about the 6th Street exit off the freeway?) And at a meeting this afternoon, representatives from CSX didn't suddenly decide to answer any of those sorts of questions, deflecting them as ones that will be addressed at the alternatives meeting.
The CSX briefers today emphasized that they feel "sooner is better" for getting the project underway, with the expansion of the Panama Canal launching in early 2015 being one of the drivers of their decision to invest their own dollars rather than continuing to search for federal or state monies to pay for the project. (And, perhaps to ward off an expected line of criticism, they also made sure to mention that using their own money was in no way an attempt to sidestep NEPA.)
There's no firm date as to when construction might begin, owing to the reality that federal reviews don't always happen on a metronome-like timetable, and that then there will be permitting processes and other agency reviews (such as going through the National Capital Planning Commission and the city's historic preservation reviews). But it would seem that spring 2012 would be a likely target time if there are no big roadblocks thrown up, especially given that Panama Canal 2015 date and that CSX says they expect the project to take about three years. With other construction happening at or near the tunnel's path, including the rehab of 225 Virginia, the 11th Street Bridges reconstruction, and perhaps the start of some portion of William C. Smith's mixed-use project at 2nd and H, the very northern portion of the neighborhood will certainly continue to be knee-deep in heavy machinery for a number of years (and CSX says that they are coordinating with those other projects).
If you are just tuning in and aren't up to speed, CSX is wanting to add a second track to the tunnel, ending its status as one of the last (if not the last?) stretch of single track in CSX's east coast operations. They also plan to lower the floor of the tunnel to allow for double-stacked trains, vastly increasing the amount of cargo they can move through their system. (You can read their press release for what they consider to be the benefits of this expansion and all of the $850 million National Gateway project.)
As I've said, there isn't much in the way of specifics as to how exactly the project will be configured, other than we know there will be a parallel track running in an open trench, and that Virginia Avenue itself will be closed, but with bridges across the construction at 3rd, 4th, 7th, and 8th to allow the movement of north-south traffic. (This would mean that vehicles exiting the Southeast Freeway at 6th Street would need to turn north under the freeway to then move toward any final destination.)
My post from a walking tour of the project last July has some of the (few) details so far announced on the project, but focus will now turn to the NEPA public meetings as the point where the real specifics of the project and its impacts will be revealed, and where residents will be able to voice any and all concerns, problems, anger, threats of litigation, etc. Until then, feel free to use the comments here for all that! You can also read my previous CSX posts for more background and details on the project up to now.
Comments (0)
More posts: CSX/Virginia Ave. Tunnel, meetings
 

On Tuesday morning the Board of Zoning Adjustment voted to approve three exceptions and variances that will allow the Capitol Hill Day School to use the currently empty lot at 5th and K streets SE as a temporary location for its operations while its Dent School building at 2nd and South Carolina undergoes renovations.
This move, which has the support of ANC 6D and the Capitol Quarter Homeowners Association, would bring a "modular building" to the site this summer, with the school's expectation that it will return to the Dent building in early 2012.
There will be no on-site parking, but the school is leasing 29 parking spaces in the big parking lot one block to the east, on the site of the old Capper Seniors building (Nats lot "W"). And the Office of Planning report on the application says that DDOT has "agreed to prohibit parking between mid-June 2011 and the end of January 2012 on school days between 7 am and 6 pm on the east side of the block [...] in order to facilitate the drop off and pick up of students." (I'll note that this 7 am start time is one hour earlier than what was announced at the ANC 6D meeting where this plan was discussed.) CHDS representatives also told 6D at that meeting that they will be asking parents coming from north of the freeway to drive south on 4th, turn left on L, and then turn left on 5th to pull into one of their four drop-off spots, where students are then guided out of the cars. (Buses will pull in and out of these spots as well.) The spaces will be available for parking after 6 pm and on weekends and holidays.
There were few questions from the board; Commissioner May did ask whether this plan will negatively impact the long-delayed plans for the new community center to be built on the site. The current requirements placed on the community center project by the Zoning Commission as part of the Capper PUD are that the Housing Authority must apply for a building permit by July 1, 2012, and that construction must begin no later than June 30, 2013, dates which are far enough in the future to not be delayed by the Day School's occupation of the site.
The commission then voted to approve the requested relief; but, after a representative from the city's office of the attorney general raised some concerns, the hearing then devolved into a long technical and legal discussion of defining which conditions of a previous order were being addressed, which I totally admit to bailing out of. But in the end the project was still approved. You can watch the video of the hearing when it's posted if you want more information; and the Office of Planning report is also a very good resource for the zoning issues, plus there's a drawing on page 3 that shows how the temporary building will occupy the lot.
The Day School has a blog with information about the renovation project, and I imagine they'll pass along soon more details about when work will start at 5th and K.
Comments (0)
More posts: Capper, Community Center, meetings, zoning
 

On Monday night there was another residents' meeting on the subject of redistricting, this time with two members of the city council's redistricting committee: Phil Mendelson, for whom this was a third public session in Ward 6 on the subject, and Jack Evans, making his first appearance at a Ward 6 assembly.
As with the other meetings, neither council member tipped a hand as to which sections of the city will be moved to different wards as part of the constitutionally mandated need to standardize the population sizes of the city's eight wards. And as with the other meetings, residents made clear that they very much want to remain in Ward 6. (Has our message gotten through? one resident asked toward the end of the session. Yes, Jack Evans assured him, it certainly has.) But Phil Mendelson stressed once again that no neighborhood wants to move, and that residents in areas other than Ward 6 are equally as vocal about their dissatisfaction--but the boundaries must be redrawn.
Mendelson laid out the upcoming schedule, with the committee's map of proposed changes being made public probably on May 25 for their vote on May 26. A public hearing on the committee's map is expected to be held June 1 at 6 pm, with the full council having its first vote ("first reading") on the bill enacting the new boundaries on June 7. A final vote could come on June 21, or perhaps in early July. UPDATE: Here's a post on Tommy Wells's blog with more information on the schedule and how the public can participate; this post was updated on May 20 changing the public hearing date to June 1.
I was told tonight by an audience member that there is apparently another Ward 6 public meeting on redistricting being held on Wednesday, May 17, in ANC 6B; I don't have any further information on it. (UPDATE: EMMCA has the details.) But having now attended four of these, I think I'm declaring myself #redc'ed out until the council committee's map is made public next week.
Comments (6)
More posts: meetings, redistricting
 

The pushback by Near Southeast residents against the idea of moving the neighborhood out of Ward 6 and into Ward 8 continues, with some evidence that their calls, e-mails, and petitions are having an effect:
At Monday night's ANC 6D meeting, two of the three council members that make up the redistricting committee came to speak to residents. Phil Mendelson (who said that he invited himself to the meeting) and committee chair Michael A. Brown gave a short presentation on how redistricting works, and then spent about 45 minutes answering audience questions. Neither of them took a position on whether Near Southeast or Southwest should be moved, and both also took pains to note that there is no official proposal yet, and that it is Marion Barry who is floating the idea. (They also indicated that Marion Barry's argument about how the move would improve the economic standing of Ward 8 wasn't quite resonating with either of them.) The initial map of the redrawn ward boundary lines should be released by the committee later this month, either on or after May 25 (when the FY12 budget stuff is wrapped up).
After the council members finished, the ANC quickly voted unanimously to support the resolution to keep all of 6D in Ward 6. Near Southeast commissioner David Garber has been tweeting his visit to the Wilson Building today to deliver the resolution and a 200-plus-signature petition, saying that Jim Graham told him that Near Southeast is "not in play" and that Mary Cheh's office assured him that "she supports keeping Near Southeast in Ward 6." (Cheh had made this known last week, when she told Tommy Wells to make the calls from concerned Near Southeast residents stop.)
Residents are continuing to press the council, with reports on the Near Southeast mailing list of multiple visits to council members' offices. And another meeting for residents on the subject has now been scheduled by Capitol Quarter resident and meeting-organizer-dynamo Bruce DarConte, this time with Phil Mendelson, on Monday, May 16, at 6:30 pm at the Capper Seniors building at 900 5th St. SE.
(People interested in this battle might also want to read Lydia DePillis's rumination on the optics of the fight, "So Much for One City.")
UPDATE, 5/12: Bruce DarConte has passed along that Jack Evans, the third member of the redistricting committee, has confirmed his attendance at the May 16 meeting at Capper Seniors.
Comments (9)
More posts: ANC News, meetings, politics, redistricting
 

A group of Near Southeast residents* met tonight to discuss the best way to fight Marion Barry's announced desire to take the neighborhood around Nationals Park out of Ward 6 and into Ward 8 as part of the city's redistricting process. Tommy Wells addressed the group, giving them a quick primer on how exactly redistricting works, emphasizing that one of the stated goals of the process is to not split up "contiguous" neighborhoods, and also making clear his feelings about Barry's plan (while never actually mentioning the Ward 8 council member's name): "I don't want to lose one inch of Ward 6," Wells said, because "Ward 6 works."
Saying that it's unfair that Ward 6 should be the only ward to give up residents, he said that he will propose a map that would return Kingman Park to Ward 6; he also suggested that the portion of Penn Quarter that isn't in Ward 2 could be moved there, allowing some of Ward 2 to be shifted to Ward 5 (which would then allow some of Ward 5 to be moved to Ward 7, and then some of Ward 7 shifted southward into Ward 8).
But the bulk of the discussion was advising the residents on how best to make their opposition to Barry's idea known to the council members who are in the forefront of the redistricting battles (some of whom are at-large representatives up for election next year). He spoke of the best ways to voice opposition in terms of mechanics, saying that petitions are a good idea (and there are two already circulating, an electronic one with more than 100 signatures and a new one handed out tonight by resident and meeting organizer Bruce DarConte), as well as group visits to councilmembers' offices and high volumes of phone calls to the Wilson Building.
But Wells also stressed that residents who want to fight this need to describe how such a move would negatively impact Near Southeast's "cohesiveness" with its surrounding neighborhoods, especially with Capitol Hill just to the north and with Southwest. (It would be interesting that, if the Ward 8 "annexation" were to happen, the residents of school-less Near Southeast would be sending their children to the "neighborhood" schools that would still in be Ward 6.)
He also emphasized that arguments against a move to Ward 8 move should not center on "personalities." That concept was not really expanded upon but, if you've read the comments on my post last week on this issue, you might infer it to mean "don't rant about how you don't want Marion Barry as your councilmember." Wells also said to not mention not being able to park elsewhere in Ward 6 as a reason for opposition, which did seem to come up an awful lot at last week's hearings, to the dismay of many in the DC Twitterverse. "This is about how you view your community."
Near Southeast's ANC commissioner David Garber mostly echoed Wells's remarks, and said that he will be drafting a resolution for next week's ANC 6D meeting that would show the support of all Near SE and SW commissioners for remaining in Ward 6. (Garber has also launched a Near Southeast mailing list that residents are using to organize their resistence to being "annexed.")
With the council set to unveil its suggested map of new boundaries within a few weeks, there will be a flurry of activity on this front--including the Ward 6 Democrats' redistricting meeting tomorrow (Thursday) at 7 pm at Chamberlain Elementary School. The final vote by the council on the new boundaries will be in July; and "there's a very good chance" Near Southeast can win the fight, Wells said.
[*I didn't take a head count; you know how much trouble the media gets in for crowd estimates! But the community room at the Capper Seniors apartment building was quite full.]
Comments (8)
More posts: meetings, politics, redistricting
 

Today the Historic Preservation Review Board voted unanimously to support the recommendation of preservation office staff, rejecting the historic landmark application for the Market Deli on the northeast corner of 1st and L streets, SE.
The staff recommendation seemed to be the primary driver of the board members' votes (with most board members having little comment on the application beyond "I support the staff recommendation"). Its author, Tim Dennee, reiterated its main points in his testimony, saying that while it would have been a good idea to keep the building maintained, the lack of underlying historic merit beyond the building representing the other old structures in the neighborhood that are gone does not allow the Market Deli to rise to the level of a landmark. There was also a lot of discussion about how the neighborhood "context" that would have allowed for a better understanding of the Deli's place in the history of the area is already gone, with so many buildings having already been demolished.
Testifying in the support of the nomination was ANC 6D07 rep David Garber, who said he ran for the position because "there's such a clear opportunity in this neighborhood to develop something great." He described himself as "100 percent in favor of development in most cases," but feels that the Market Deli represents a "common building type for common people" and that "what's remarkable about the Market Deli is that it's unremarkable." Also testifying was Hayden Wetzel, who said he prepared at the application at Garber's request and who echoed Garber's comments by saying that it's a "sweet and pretty little building" and that the "ordinariness of the building speaks for itself." He said that he formed a task force within the DC Preservation League in 2000 to consider the buildings in the area, but that it didn't result in much interest.
Six people testified in opposition: three residents, Dodd Walker of Akridge (the owners of the building), Michael Stevens of the BID, and a woman hired by Akridge (whose name and affiliation I unfortunately missed) to investigate the building's history. Much of what was said by the residents, Stevens, and Walker were variations on comments made the ANC meeting and in the Memorandum in Opposition that was presented to the board with 39 co-signers. With concerns about how an ANC's position is given "great weight," resident Kitty Loyd focused her testimony on the ANC vote a few weeks ago, contending that Garber should have recused himself since he expressed an interest in saving this building before he became commissioner. (Loyd also apparently printed out the JDLand Market Deli comment threads to give to the board, so you're all famous.) Both Michael Stevens and resident Adam Hall mentioned their feelings that there wasn't enough of a public process followed by Garber in submitting this application, while Hall also said that the building "gives the neighborhood a dangerous feel" because of the neglect.
Stevens also took time to list all the historic buildings in the neighborhood that are still in existence (from the Navy Yard to the Blue Castle to the beaux arts WASA Pumping Plant to the buildings being redeveloped at the Yards, as well as the private homes and businesses along 3rd, K, L, Potomac, and lower 8th). He also mentioned the 10 to 12 years of planning and analysis (and studies) by city agencies starting in the late 90s that have gone into the remaking of Near Southeast, back before the demolition of so many properties--"would this history not have been discovered then?"
There was also a detailed (some might also describe it as "long") presentation from Akridge's historic preservation consultant about the history of the building, which apparently suffered a pretty serious fire in 1921 and appears to have been pretty well gutted at that time. Those who've never seen the interior of the Market Deli might be interested in seeing her presentation, which will be available when HPRB posts the video of the hearing sometime on Friday.
There were few questions during the hearing from the board members, and, in the end, only chair Catherine Buell seemed anything less than fully supportive of the staff recommendation. She called it a "tough case," and said that she would like to see preservation plans and multiproperty listings done for the area (beyond just the "windshield survey" done by the Office of Planning back around the time of the ballpark). But in the end, saying that she didn't think the building was eligible for landmark status and that the ANC's comments (which are to be given "great weight") didn't really speak to the board's criteria, she called for a vote, and the board voted unanimously.
This was followed by a quick secondary vote on the Deli: the raze permit application for the building was also on the agenda, in the event that the landmark application was approved. Because it wasn't, the board voted to support the staff recommendation that says the board no longer has jurisdiction over the property, and so the "city's issuance of a raze permit may proceed without further preservation review."
And that would seem to bring this matter to a close. Just after the hearing, Garber tweeted: "I'm glad there was a chance for discussion on the matter, and I look forward to helping approve new plans to bring vibrancy to the site."
Comments (13)
More posts: marketdeli, meetings, preservation
 

News and notes, some already Tweeted, some not:
* Don't forget the two public meetings on the Final Environmental Impact Statement for South Capitol Street. The first one is tonight (April 26) at Amidon-Bowen Elementary School at 4th and I, SW, from 6:30 to 8:30 pm. The second one is Thursday (April 28), at Savoy Elementary School, 2400 Shannon Place, SE, also from 6:30 to 8:30 pm. My entry from a few days ago gives the rundown on what changes they are looking at to transform South Capitol Street into a "grand boulevard" rather than a commuter speedway.
* ANC 6B commissioner Norm Metzger passes along an update from fellow 6B'er Kirsten Oldenberg on the status of the Marines' search for a new barracks site. A quote: "Now in progress are Installation Master Planning and Support Studies and a Financial Feasibility Analysis. We were only given a brief outline of this work, which will not be made public. A briefing on this 'conceptual' material will be given to the Commandant of the Marine Corps sometime in late May (perhaps). Then once he makes whatever decisions are necessary, work will proceed on putting together the guts of an RFP. This information has to go to various 'stakeholders' and ultimately Congress before the RFP can be finalized and released. One of the developers at the meeting today tried to pin officials down regarding timelines but it proved difficult to do. Bottom line, if all goes smoothly (which is doubtful), a site and developer could be chosen by Fall 2012. (Don't bet on it.)"
* Dan Steinberg writes at his DCSportsBog today about how the Nats went from fireworks to a submarine horn: "A few months ago, when people inside the organization began considering a move away from fireworks, they began researching naval horn options and even went to the Navy Yard to check out alternatives. Their advisers at the Yard advised they go with the sub horn, both for the sound and for the way that sound would carry. The Navy folks also thought the three-blast signal would be appropriate. So the horn was taken to Nats Park and hooked up to a special mic in the press box, where members of the marketing department can fire away after home runs and wins." Nats COO Andy Feffer says that the distinctive sound should make people immediately think "Nationals Park": "'The military is already part of game presentation and the Navy Yard is right next door; not only is it unique and distinctive, but it fit. It fit with our goals, and it fits with what Washington is. It's ours. Someone else can't copy it and say we're gonna do that too. It's Washington's.'"
* In a subscrbers-only piece in last week's Washington Business Journal, the story of Red Hot & Blue's departure from Nationals Park after the inaugural 2008 season gets a bit, ahem, spicier. Five months into that first season, the BBQ outlet told the Nats it was no longer interested in being at the ballpark. "Hold it, says the team, Red, Hot & Blue was still on the hook for $235,000 in regular payments until the end of the 2009 season, still yet to be paid, according to a breach of contract suit that was filed in March in D.C. Superior Court."
* Honda put out a photo gallery of the new 2012 Honda Civic, which includes a number of shots taken at the Yards Park, as well as Anacostia Park and other DC locations. (You have to wander through a bit to find them, but they are pretty neat to see.)
 

It's been so long since I've written about this that I forgot it was even still in progress, but DDOT has announced two public meetings to present the "preferred alternative" and the Final Environmental Impact Statement for the South Capitol Street Corridor, first on April 26 at Amidon-Bowen Elementary School in SW and then two days later at Savoy Elementary School in SE. This is the long-term study of how to improve South Capitol Street on both sides of the Anacostia River to better address safety, traffic, pedestrian, and streetscape issues, and includes the construction of a new Frederick Douglass Bridge.
If you are interested in this subject, there is more verbiage and documentation accompanying the plans than you could ever dream of. (Traffic studies! Environmental consequences! Technical reports!) And I've written a lot about the process, which began more than a decade ago with other studies before the EIS got underway. And I'm sure there will be posts on other blogs delving more specifically into portions of the plans. But, since most people probably want to know "what does this mean for me?", you can see this graphic (from the 224-MB chapter 2 of the FEIS) giving a quick overview of what changes are planned along South Capitol Street if the final EIS is signed off on (and, more importantly, if funding is secured). The short version, for the west side of the Anacostia:
* Add "pedestrian amenities" and enhance the streetcape along South Capitol north of I and along New Jersey Avenue SE north of the freeway.
* Replace the existing ramp to the freeway from South Capitol and I with an at-grade intersection. (This would be a left turn onto a ramp to the freeway from under the freeway, near the current Nats HH economy parking lot.)
* Bring New Jersey Avenue SE back to a 160-foot full right-of-way, and add streetscape enhancements.
* "Reconstruct South Capitol Street as an urban boulevard." This means bringing M Street up to an "at-grade" intersection (no more tunnel), and would include new signalized at-grade intersections to allow traffic to cross South Capitol on K and L streets. (M Street would also get reconstructed between the Halfs [SE and SW].) The section of South Capitol north of M would have the same streetscape that the south portion received during its 2007/08 makeover, with wide sidewalks and a tree-lined median.
* Build a traffic oval at South Capitol, Potomac, Q, as the gateway to a new arched bascule-design Douglass Bridge that would have wide "multi-use trails" (i.e., sidewalks!) in both directions. The existing bridge would be demolished, after the new bridge is built somewhat downriver of the current location.
The Executive Summary (220 MB PDF) gives a good overview of the FEIS and preferred alternative (as it should!), but I also suggest wandering through the Chapter 2: Alternatives section, especially if you came to the neighborhood or JDLand after 2008 and didn't get to follow along during the EIS process, or if you're interested in the additional plans for east of the river, which I'm going to leave to others to discuss. My previous posts on all of this may be of interest as well. If you're wanting to see some of the earlier studies referenced in the FEIS, there are links to them at the top of my South Capitol Street project page.
How much would this all cost? The preferred alternative is priced in this final EIS at $806 million (not billion! yeesh) in FY 2014 dollars. (New bridges are expensive, you know.)
(I know that this is a very quick overview of a big study and plan, but there will be plenty of time to talk more about it, especially with the upcoming public meetings.)
 

Last missive from Monday's ANC 6D meeting..:
* It's apparently going to be "Neighborhood Day" at Nationals Park on Saturday, April 16. The Nationals said in a press release on Monday that residents will be able to purchase discounted tickets, but you apparently have to be in the know to find the nationals.com/neighborhood ticket sales link. (ANC commissioners got their free tickets for Saturday handed out at the meeting, since they'll be introduced on the field before the game.)
* With a unanimous 7-0 vote, the commission passed a motion authored by David Garber to request that DDOT fund a "comprehensive" traffic study of the M Street corridor and its neighboring streets in both Southeast and Southwest. Much of the discussion ended up centering around the wording of the motion (as is so often the case), with much concern about whether Maine Avenue should be specifically mentioned, especially given that the developers of the new Southwest Waterfront will be undertaking their own traffic study along Maine and Water Street. Commissioner Andy Litsky wondered about the traffic study in Southeast that the Capitol Riverfront BID is looking to fund, and Michael Stevens of the BID said that they would support a "holistic" approach to combining the various studies already done or on the boards (including the one CSX has apparently completed to look at the impact of their planned construction along Virginia Avenue, plus the reports done for the 11th Street Bridges EIS and the in-progress 14th Street Bridges EIS).
The motion was then amended to say that the ANC supports directing DDOT funds "to conduct a comprehensive traffic study and plan for the M Street SE/SW corridor and its feeder and surrounding streets and that all other area studies be integrated for DDOT's review in order to produce a comprehensive study, and that ANC 6D urgently supports the subsequent design process and implementation of a 'complete streets' plan to decrease the speed and volume of automobile traffic, and increase multi-modal transportation safety and efficiency as neighborhoods in 6D continue to evolve and develop."
(If you want to know more about the concept of Complete Streets and how it might inform a redesign of M Street, you can read my report on last year's public meeting held by Tommy Wells to start an "initial dialog" on the subject.)
* The commission also voted 7-0 to support the Pacers Home Run Classic 10K race, to be run on Saturday, June 18. Original plans to start and end the race at the Yards Park ran into some issues with the city's Emergency Management folks not wanting the race to run by the DC Water/WASA plant (and there was no explanation beyond that). So the race will now start and end at Half and N, across from the ballpark, then circle the ballpark down to South Capitol and Potomac before crossing the Douglass Bridge, running along Anacostia Drive in Anacostia Park to the skating pavilion, then doubling back. It's expected there will be 2,000 runners for the 8 am race. (Next year they expect to be able to start and end at the Yards Park and use the new floating bridge to Teague Park to get to Potomac Avenue and the Douglass Bridge.)
* In liquor license matters, it was reported to the commission that Das Bullpen did end up needing to get a new liquor license separate from that of The Bullpen 1.0, and that a new voluntary agreement was written up as well. This was all apparently done very hurredly, on the Tuesday before Opening Day, in order for ABRA to approve the new license on Wednesday in time for Opening Day on Thursday (though as we know Das Bullpen didn't open that day anyway). There's a full hearing on the license scheduled for May 31. If you haven't followed the Twitter flurry, Das Bullpen opened Tuesday (April 13) for the Nats/Phillies game.
* Also on the alcohol front, apparently both Harry's Reserve and Cornercopia are inquiring as to the possibility of the sale of "singles," in their cases to be the sorts of higher-end European beers that typically come in 20 oz or larger bottles. Coralee Farlee, who chairs the 6D ABC subcommittee, asked for some guidance as to whether the ANC is wanting to continue to not consider any exceptions for single sales, as has been the practice. David Garber and other commissioners expressed their support for the higher-end type of sales, and Andy Litsky said that 6D never really had the "singles" problem that lead the H Street NE corridor to ban those sales. Chairman Ron McBee instructed Farlee to check how other ANCs are handling the issue (apparently 6B allows sales of the 20-oz. bottles?), with an eye toward reexamining 6D's stance.
 

Although the Yards Park has been open since September of last year, the historic Lumber Shed that sits just south of Water Street between 3rd and 4th is not yet in its final form. Second-phase plans have always been for the shed to be turned into a glass-enclosed retail pavilion; however, as Forest City has been seeking tenants they have discovered that the vast majority of leasing interest has been for the first floor, not the second.
In order to get the building to the required percentage of leased space in order to get financing to start construction, Forest City is wanting to move their offices to the second floor of the shed, which requires a text amendment to the site's zoning. It would be on an interim basis, for no more than 20 years, and would allow Forest City to move its offices elsewhere before the end of that 20 years, and would require a return to retail or restaurant uses on the second floor after they move out. If the Zoning Commission approves the change, Forest City says they are looking to start construction this year and open the building in 2012. As part of the process for this zoning change, Forest City prepared a series of renderings of the completed renovation, which they have been kind enough to pass along to me. (Click on them to see enlarged versions.)
When Forest City first came to ANC 6D with information about this zoning text amendment request in March, the commissioners had concerns on three areas: the design of the roof (and whether it would be "green"), whether there would be controls in place to prevent the office workers from marring the look and feel of the glass walls by hanging posters or papers on them or putting other clutter too close to the glass, and whether the nighttime lighting of the shed on both floors would be designed to create a desired "jewel box" look.
Forest City addressed these issues at Monday's meeting. A green roof was studied, they said, but ultimately it was decided that it couldn't be implemented in a fashion that would respect the historic profile of the roof and the building, and given that the building is surrounded by almost 100,000 square feet of "permeable" surface (i.e, the park), they felt that another 300 or 400 square feet was not a necessity. The color of the roof will be a charcoal gray. As for the "Post-Its on the Glass" issue, Forest City said that they will stipulate rules as to not hanging items on the glass and how far away other items should be. And the company also agreed to the "jewel box lighting" concept of both floors, provided that it's left up to Forest City to determine the appropriate lighting levels. The rendering at top right (see larger version) shows the nighttime lighting of the building as envisioned.
In addition, David Garber suggested/requested that a sign or plaque of some sort be affixed to the building (but not on the glass!) to explain its historic significance, which Forest City also agreed to.
With questions answered, agreements reached, and plaques affixed, the ANC voted 6-0 to support the zoning change. No date for the hearing with the Zoning Commission has been set as of yet.
The Lumber Shed is not the only retail pavilion planned for the park's later phases--designs call for two additional buildings along Water Street on the empty lots to the east of the shed. You can see more information and renderings on my Yards Park page (scroll down a ways if the link doesn't jump you down to the Second Phase section).
(Coming tomorrow, one more post on 6D's meeting, with a roundup of the other Near Southeast-related items on the agenda.)
Comments (1)
More posts: ANC News, Lumber Shed/Yards, meetings, Retail, The Yards, zoning
 
194 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 20
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.