Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: The Bixby
See JDLand's The Bixby Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


59 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6

Before the snow-that-never-was arrived yesterday, I took a quick spin to get some updated photos. There was still a smidgen of sun when I visited the old Capper Seniors site, where only the southwest wing of the huge building remained standing when I was there (but even that could be gone by now). I also wandered along Tingey Street behind the DOT HQ for the first time in a long time to see what's going on with the work at The Yards--they're now preparing to build some temporary parking lots and are doing their infrastructure work before starting the rehabs next year of three existing buildings into residential and retail offerings. I also took some shots along M Street and at Onyx on First and 100 M to take advantage of the overcast skies in those spots, since the building shadows on winter days when the sun's out are almost impossible to work with. Finally, I got updated photos of 55 M Street, the northern portion of Monument's Half Street project, where the section along M Street is now three stories high and a fourth story is underway on the southern edge of the building.
Here's the entire batch of new photos on one page--don't forget to click the if you want to see all photos in the archive from a certain angle. And in case you missed these a few days back, I recently took new overhead photos of the North of M area (looking south and west and northwest), showing quite a change in the last 21 months.
 

Two bills of Near Southeast interest passed their first readings at today's city council meeting, on the consent agenda, no less. (Consent agenda = no discussion or bickering! Yay!) First was Bill 17-0448, which authorizes the closing of the public alley on Square 696 (bounded by Half, First, I, and K), and which had been interesting mainly for the affordable housing trust fund contribution discrepancy that came up during the bill's hearing a few weeks ago, when the developers noted that they expected their contribution to be in the neighborhood of $900,000 and the Office of Planning determined the required sum be closer to $8 million. Apparently the final bill calls for a $1.1 million contribution, which council chairman Vincent Gray said is the largest trust fund contribution ever as the result of an alley closing. The developers also have agreed to create a 20-foot-wide pedestrian right-of-way through the middle of the block to allow for easy access from I Street to the planned public plaza on K Street, though apparently DDOT requested that this right-of-way be upgradable for "motorized access" in the future if necessary. This alley closing will allow DRI Development to move forward with their plans for 800,000 square feet of office space in three buildings with 37,000 square feet of ground-floor retail. There've been noises that the first construction on the site could begin in the summer of 2008, but nothing official has been announced. (The last tenants on the block, in the cab garage at First and K, are expected to move out in February when their lease expires.)
Also passed today was Bill 17-0292, the Capper PILOT funding bill that I just wrote about in detail a couple days ago. This authorizes a bond issuance of up to $55 million that will yield close to $37 million to pay for infrastructure improvements at Capper/Carrollsburg. The bonds will then be repaid by landowners making payments in lieu of property taxes. I should mention that these PILOT funds won't only be repaid by residents of Capitol Quarter--there are two planned office developments totaling 750,000 square feet that are within the Capper PILOT area (600 M Street at the old Capper Seniors site and 250 M Street) that will generate PILOT payments.
Each bill will come before the council again in January for their final votes.
 

Foggy air with low-in-the-sky not-very-bright December sun is not conducive to snappy photos, so this is just a brief update to capture the most pressing changes to the skyline. Demolition started back up this week at Old Capper Seniors: the southeast wing is now gone, and the east wing is getting smacked with the wrecking ball this morning. You can see the demolition from all angles in the old Capper Senior Expanded Archive. I also took a few shots of 55 M's progress (look for the icon in its Expanded Archive).
 

The city's Approved Building Permits Feed tells us that yesterday three permits were approved for the construction of temporary parking lots on three blocks within the Capper/Carrollsburg footprint: Squares 767 and 768, which are cleared lots between Second and Third and I and L (just to the east of what-may-someday-become-Canal Park), and Square 882 between L and M and west of Seventh, where the old Capper Seniors building is in the midst of coming down. This doesn't necessarily mean that construction will start tomorrow (I don't know if the contracts that were advertised a few months back have been awarded yet), but it does mean that what is sometimes the biggest hurdle to construction in the city has already been passed.
As part of the rules governing their creation, the lots will be open for general paid parking during non-game times, and can also be used for "a seasonal or occasional market for produce, arts or crafts." These lots should yield somewhere between 670 and 720 spaces. Eventually these locations will be home to new apartment buildings along Third Street and both a new office building and townhouses on the Capper Seniors site; the parking lots themselves are only allowed until 2013.
You can find out more background about parking plans for baseball on my Stadium Parking and Transportation page, though no specifics have been announced yet as to which lots the Nationals are planning to use for season-ticket holders.
UPDATE: I'm hearing that work on the Third Street lots should get underway in December, and on the Seventh and M lot in January.
 

Thanksgiving weekend is a good time to take photos of the neighborhood, given that traffic is close to nonexistent. (Great weather helped, too.) The showy construction work has now slowed down at 70/100 I, Onyx on First, and 100 M, so after this update I'm now going to scale back the updates to those project pages (and their expanded photo archives). Demolition continues at old Capper Seniors, though not much happened to the building itself in the past week as work appeared to focus on clearing the ground of the debris from the initial work. And 55 M continues along, though it's hard right now to get a feel for the progress from ground level (beyond the festive steel beams along M Street), which is why having the webcam is so handy.
You can see all of the weekend's photos on this page, and of course feel free to click on the icons to see all photos of a certain location to watch the buildings go up (or down, in the case of Capper Seniors).
Then there's the ballpark.
[Long pause. Sigh.]
Taking photos of the stadium's exterior started to be constrained in late summer by the infrastructure work being done along First Street and Potomac Avenue; and by October access to N Street had pretty well been cut off too, again because of the infrastructure work. While I grumbled about the loss of access to those locations, I respect the perimeters of construction sites, and totally understand the need for security to keep people out of the ballpark, and so I stayed north of N. But yesterday, while standing on the northeast corner of First and N streets, on an open public sidewalk outside of the stadium footprint, I was approached by a security guard telling me repeatedly that I was "not allowed" to take photos of the ballpark. (At least I wasn't screamed at through a megaphone, as happened to a correspondent of mine at the same location recently.) This is, of course, ridiculous--there are no laws against taking photographs of anything while standing on public property, and it deserves its own separate rant about stupid attempts to clamp down on civil liberties in public spaces.
But the cumulative effect of the run-ins I've had over the past few months when I am absolutely positively 100% in no way trying to set foot inside the ballpark (my favorite being the time I was shadowed by a guard all the way down South Capitol from N to Potomac and back despite never coming any closer to the ballpark than South Capitol's median) have left me drained and uninterested in continuing the battle. At the same time, I'm dealing with the fallout from a recent memo sent out by the DC Sports and Entertainment Commission reminding ballpark contractors and subcontractors that they are not allowed to talk to "the media" without prior approval by the DCSEC, leaving workers who have been nice enough to answer such probing questions as "how many panels make up each row of the HD scoreboard?" feeling that they can no longer be helpful.
I imagine something could be worked out, though right now I'm worn out from all the drama and not quite ready to fight the fight. In the meantime, I'm not going to update any ballpark photos or post news of the stadium other than links to accounts in the ("real") media. (Of course, the vast majority of the exterior work of the ballpark is already completed, so this isn't exactly a breathtakingly brave stand!) Once the roads are reopened, and the ballpark is close to opening, I'll of course get back in gear, but until then I'm taking a breather.
 

I've added some quick photos this morning showing the demolition progress at both old Capper Seniors and 1345 South Capitol Street, which you can see all at once here (though they really benefit from being paired with their before-and-afters, as seen on the project pages and in the expanded Capper Seniors photo archive). The South Capitol Street photos were hurried and ended up being incomplete after yet another run-in with the ballpark's Hired Badge Harry, who screamed at me incessantly for daring to even stand on the curb on the east side of South Capitol Street at O Street while trying to take pictures of the 1345 site, and with my having no interest in getting any closer to the ballpark site behind me. Once I moved a half-inch forward into the gutter, at the mercy of three lanes of high-speed traffic, I was then no longer Public Enemy #1.
UPDATE: I also tossed in a few new photos from the freeway at South Capitol Street, where I was a bit surprised to now see 55 M Street peeking into view in a few of the shots.
 

During the five minutes it was sunny this afternoon, I managed to get some updated photos of the demolition at old Capper Seniors, where the work is still concentrated on the western side of the building. Within the past day or two the wrecking ball has sliced a hole in the main portion of the building, leaving the old southwest wing standing alone and temporarily making the tower into two buildings. Soon they'll be starting on the still-bricked elevator shaft in the center of the building on the north side. (I wouldn't park my car too close to there for the next few days.) Check the Expanded Project Archive if you want more angles of the progress, though they didn't all get updated today. And remember to click on the Click to see all available photos of this location. icon to see all the photos in the archive from a vantage point--the progression of shots looking south at the building from across L Street are pretty intriguing. They've gotten a lot done in eight days....
 

It started innocently enough. On Sunday morning, when I woke up to find such a brilliant sunny day, I decided to go take a new batch of photos of the demolition at old Capper Seniors to replace the dreary ones from Saturday. Then I started moving away a few blocks, to catch more distant views of the building. Then I decided that there were a bunch of locations where 70/100 I and Onyx on First were changing the skyline that I hadn't captured. Then I realized that it had been a long time since I had taken a complete set of photos of the western side of South Capitol Street at O and P streets, to show the changes since the demolition of the viaduct and all the streetscape improvements. And then of course, while I was there, I had to take a set of shots of the ballpark's western facade. Then there were more shots needed of the changes along M Street thanks to 55 M and 100 M. By the time I was done, I had a ridiculous number of new images up on the site, which you can see all on one page; you can also see most of them paired with past shots by clicking on the "Photo Archive Before-and-Afters" links at the top of that page, like the "South Capitol Street Makeover", which shows the new photos from both sides of the street (along with some older angles I didn't update). After a while they all run together, I know. But they make for some spiffy before-and-afters!
 

After a few days of knocking out the exterior brick walls and windows from the inside by driving Bobcats into them over and over, the showy demolition began at old Capper Seniors this morning, as the wrecking ball started bringing down the western wing of the building. Not the prettiest morning for pictures, but maybe the glum light is apropos. You can look at my main old Capper Seniors page for the basics, or the Expanded Project Archive for photos of the demolition from considerably more angles. (And don't forget to click on the Click to see all available photos of this location. on any of these pages if you want to see the images in between the first and last ones.) It's going to be a slow process, and the demolition is not expected to be finished until the end of December.
The 238-unit building originally opened in 1958 as one of the multiple new high-rises at the Arthur Capper public housing project; but by the early 1970s, crime and drug use and government neglect had already turned the building into such a wasteland that even the then-director of public housing for the city later described it as a "fearsome place" where "there was danger to life and limb to any ordinary citizen who wanted to live there." In 1973, it was finally boarded up, and plans were announced to renovate it into a 292-unit building for elderly tenants, with reopening planned for 1976.
But the renovation plans went awry as well, thanks to battles between the city and the Department of Housing and Urban Development over plans for a health clinic within the new building, along with escalating cost estimates, and fights over the bids on the project. Construction finally began in November 1978, scheduled to take 14 months but eventually stretching to three years as incomplete construction documents and a lack of project oversight by the housing authority brought delays, firings, and lawsuits. In late 1981, it finally reopened, but crime was never eradicated, especially as non-seniors began living in the building. The last of the tenants were moved out early this year, with some choosing to move to the new Capper Seniors #1 a few blocks away at Fifth and Virginia.
While this seniors building at 601 L Street was a home to many people for many years, I'm not sure it's a building to be mourned. It's also now the last remnant of what were once the sprawling Arthur Capper/Carrollsburg projects that stretched from 2nd Street to 7th and from Virginia to L. It's taken seven years, but with this demolition, all Capper/Carrollsburg buildings will be gone.
(As for the other impending demolition, I took a quick spin past 1345 South Capitol this morning and didn't see any action, though some construction equipment has been put in place.)
 

On Wednesday morning at 11 am, demolition began at the old Capper Seniors building at 601 L Street, SE. And, 24 hours later, a lot of progress has already been made on getting rid of the exterior windows and walls. I was amazed to see that, instead of swinging the wrecking ball, workers are actually working inside the building, driving Bobcats into the brick exterior walls over and over to punch them out, turning the building into a skeleton before the actual bringing down of the skeleton begins. (Don't hit the gas instead of the brake, boys!) I've created an Extended Project Archive for this building, to see the before-and-afters from lots of different angles beyond the basics on the main old Capper Seniors page (which also has some photos taken from the interior of the building last week) so take a look at today's photos to see how the work is progressing.
(And speaking of demolition, fences have now gone up at 1345 South Capitol, and workers there are telling neighbors that demolition could begin tomorrow [Nov. 9]. We'll see!)
 
59 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6




                  © Copyright 2024 JD.