Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: jpi
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


137 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 14
Search JDLand Blog Posts by Date or Category

Let's dip into the What's the Deal With.... mailbag for some more non-ballpark-related content. Reader M has asked about the garage on the northeast corner of First and K, which remains in place while JPI's 909 at Capitol Yards starts to rise up around it.
This is actually a very simple question (and is precisely the one I envisioned when I started WTDW)--the owner, Davood Miraizee, refused to sell to JPI. He's quoted in a big Post piece from 2005 about not wanting to leave his spot. (Quick chats I've had with him have included slightly more, um, colorful language.)
So, JPI is continuing to build the 237-unit apartment project around him (and no, they won't be building on top of the garage), and as far as I know at this point, he's not going anywhere. But with a 2009 projected tax assessment of $1.47 million for the site (up from around $200k when he bought the lot), you do wonder about the economics of his staying put. As is the case with Positive Nature around the corner, assessments in the area are skyrocketing, which would seem to make it hard for any of the few small businesses still operating to stick around much longer. (The cab company and garage just across First Street from A1 is leaving at the end of this month, its land purchased last year to make way for DRI's 99 I Street office/retail development.)
If you have a What's the Deal With question, drop me a line, though it might be a while before I get to it.
And, coming tomorrow--a WTDW on a very high-profile project.
Comments (0)
More posts: 909 New Jersey, What's the Deal?, jpi
 

When setting out to photograph a changing neighborhood, it might initially seem like a good idea to create a scheme where you take photos of 16 different views at each intersection (from up to four different angles) so that you don't miss anything and so that you can easily match photos as time goes on--until you arrive at a time when there are more than 30 intersections where visible change is happening on a day-to-day basis. Then you end up taking nearly 500 photos in one 90-minute walkabout on a sunny Saturday afternoon (without even venturing near the shiny new ballpark that's only two weeks away from opening), making you almost embarrassed when it's time to post a selection of them on your obsessive-compulsive web site.
This is all just hypothetical, of course.
Yesterday was the first time I saw the striped and open-to-traffic First Street north of M, now widened to four lanes with a bike path, and it's kinda different from the First Street I've spent so much time on these past few years. (The four new buildings with one more about to pop up might be part of the feeling, too.) Here's a gallery of before-and-afters for First Street at I, K, L, and M so you can see the changes. This was the first time I've been able to take a complete set of pictures at First and I in nearly a year, so it was especially nice to get those updated.
I also took new photos along Half Street between I and M, Cushing at L and M, and a smattering along M at South Capitol, Van, and New Jersey. And the wide views from the freeway at South Capitol Street. (My previous entry has the links to the photos I took of the various parking lots under construction.) For all of these, don't forget that clicking on the icon will show you all photos in the archive of that location if you want to see the progression of the changes.
Of course, many of these new photos are also now on the project pages for the under-construction buildings: see 70/100 I, 909 New Jersey, Velocity, Onyx, 100 M, and 55 M for details.
(There sure were a lot of folks taking either a drive or a walk through the area yesterday--let the onslaught begin! And thanks to those who said hi while I was out and about ["Are you the one who does that web site?"]. As always I appreciate everyone who made the effort to not run me over when I was standing in the middle of the street taking pictures. My days of being able to do that may be at an end, though.)
 

With raze permits having been filed recently for the Wendy's on I Street and its little gray neighbor to the east along Half Street, we knew that their days were numbered. JPI informs me that Wendy's will be closed by May 1, and that demolition on the two sites will happen over the summer, to allow construction on the 421-unit 23 Eye at Capitol Yards to begin in September.
Also, JPI's Capitol Yards buildings at 70 and 100 I, which together will have nearly 700 rental units, are now scheduled to open in June and July, respectively. 70 I is known as "Jefferson at Capitol Yards", while 100 I has snuck in a name change and is now "Axiom at Capitol Yards" (after a brief interlude as "Mercury").
In the meantime, the fourth Capitol Yards sibling, 909 New Jersey, is just about at ground-level, meaning that Nats fans walking on New Jersey Avenue to get to and from Capitol South will soon see a new skeleton rising up. The 237-unit rental building is scheduled to open next year.
The official web site has animated computer renderings on Jefferson, Axiom, and 909, and a mailing list for those interested in more information.
 

Raze permits have now been filed for the Wendy's at 23 I Street and its little gray neighbor at 901 Half Street on the corner of Half and I. These two lots totaling about 47,300 square feet were purchased in late July for $28.625 million by JPI, and the company is planning "23 Eye at Capitol Yards," a 421-unit residential building with up to 35,000 square feet of retail space. Late last year JPI was saying that 23 I would start construction this August--I haven't seen anything lately on whether that's still the case. I haven't had a chance to swing by Wendy's to see if they have a closing date, so if anyone thinks to ask while they're at the drive-through window, let me know. This project would be the youngest of the four Capitol Yards siblings, joining 70/100 I arriving later this year just across the street and 909 New Jersey coming in 2009 one block to the east.
 

Yesterday I posted a whole batch of updated photos of the ballpark's exterior; today you can check out the project pages for the residential projects 70/100 I Street, Onyx (both opening later this year) and Velocity (2009) along with the office projects 100 M (2008) and 55 M (2009) for lots of new shots of those projects, or you can look at alllllll the photos from yesterday on a single page (ballpark shots, too). Don't forget the icon if you want to look at how an intersection has changed over the past few years.
Items of note from my wanderings:
* The south side of I Street is now paved between New Jersey Avenue and Half Street, and I've been told that I Street will be "driveable" by Opening Day;
* First Street is now paved south of K, and paving up to I doesn't look far off;
* The Merritt Cab garage at First and K now has a "Moving March 31, 2008" sign on it; and
* JPI's 909 New Jersey Avenue residential building (between I and K) is not far from reaching ground level, so be prepared for the arrival of another skeleton in the skyline before long.
If *I'm* finding it all hard to comprehend and harder to keep up with, I can only imagine how non-obsessive observers must feel. I'm kind of looking forward to the pace slowing back down a bit come May....
 

Let's take a breather from all this parking stuff (which I had my fill of about two years ago) and get back to the original JDLand modus operandi--posting lots of photos of the neighborhood. Yesterday's press conference on the-subject-I-just-said-I-wasn't-going-to-talk-about was held on the 10th floor of 20 M Street, giving me a chance to update my photos from that perch, with views of 70/100 I, Velocity (now working on floor #2), the 1015 Half Street site (where nothing seems to be happening just yet), 55 M, and the ballpark. You can see all photos I've taken from atop 20 M in the past 10 months, or just compare the oldest and newest ones (there's been a few changes!).
Switching to the opposite side of the neighborhood, I took a few shots from Poplar Point on Sunday of the ballpark and The Yards.
You can also see all the new photos (along with the ones taken inside the ballpark looking out at the surrounding neighborhood) on a single page.
I hope to get out this weekend and update the ground-level photos of all the latest happenings.
 

I wandered around on Sunday for a photo session, wishing that spring would hurry up and get here so that the sun will rise higher during the day and set farther west so that I can stop dealing with the damn glare whenever I face southward.
* I have new images along N Street just north of the ballpark between Half and First, which show the work at the entrance plaza at Half Street, including glass now being installed on the ground floor of the western parking garage, as well as the structures that will make up the entrance gates.
* In fact, I updated all 12 angles of the Half and N intersection, which now that it has its new wide sidewalks, curbs, streetlights, and an initial paving job, is really a stunning testament to 24 months of change, not only on the four corners of Half and N but the blocks to the north as well. It's definitely worth a look.
* I took a lot of photos of the now-demolished Willco stretch along First Street (and gave the project its own page as well), and of course I got all the usual angles of 55 M Street.
* On Half Street between I and K, where JPI's 23 I Street residential project is expected to start this year, a pile of red-and-black advertising banners have been hung on every available surface, and a "JPI Permit Parking only" sign has appeared on the entrance to the former towing company's parking lot on that block. I'm guessing JPI's purchase of the property just closed. I haven't heard anything about potential start dates for this project, or when the Wendy's might close.
* If you browse all the photos I took yesterday, you'll also see a smattering of 70/100 I and 100 M shots as well as images of the two blocks along Third Street where temporary surface parking lots are going in (so now my pictures of those blocks have changed from post-demolition views of nothing to pre-blacktop views of nothing). And the always popular shots from the SE Freeway at South Capitol are updated, too.
And don't forget to click on the icon wherever you see it to see all photos in the archive of a certain location.
 

I braved the chilly temps and gusty winds on Sunday morning for what turned out to be an abbreviated venture to get some updated photos. (I didn't post them yesterday because I thought I might go out this afternoon to get more, but it's a holiday, it's still cold, I'm pretty warm and cozy here on the sofa, and, and, and....) You'll see some shots of the demolition along First Street on the Willco site (which is about 50 percent completed), as well as a few updated shots of the ballpark, some of which show that the steps are now being poured on the grand staircase. There's also a smattering of shots of 55 M, 100 M, 70/100 I, and the at-ground-level Velocity construction, and some other vantage points that I got before high-tailing back indoors.
You can see the complete batch of photos, remembering to click on the icon if you want to see all archived photos of a certain view.
This is a good time to mention that I recently made a few changes to the Photo Archive. First, you'll now see links that allow you to toggle between seeing all photos of an angle and just the oldest and newest, which comes in handy as the number of photos continue to escalate. And, because the archive is getting pretty big, I've changed the default for when you choose to look at all angles of an intersection to show just the oldest and newest of each angle--you can then choose to see all photos for a specific angle.
 

It was time this weekend to catch up on photos for a bunch of locations, including the most aged batch of them all, the views of the ballpark's northern footprint along N Street, which haven't been updated since September, so you can now have your fill of photographs of imposing parking garages. The curbs and historic streetlamps are now in, and N Street has been paved from South Capitol to Half, and it looks like the paving east to First isn't far behind. So even though the half-shadow half-sunlight conditions weren't the best to work with, I took full updates of the First, Half, Cushing, and Van intersections along N, all of which you can see here.
One thing that really struck me today for the first time is just how wide First Street is becoming, as you can see in this batch of northward-looking photos. I also saw that all the businesses on the west side of First south of M have now vacated--as you can see above, it's odd to see those old about-to-be-demolished buildings with sparkly new sidewalks and streetlamps in front of them.
I also trudged around the road construction along First Street north of M as best I could to update photos of 100 M, Onyx, and 70/100 I, and also got a good new batch of 55 M photos as well as the always showy views from the freeway at South Capitol. And I finally got the last set of old Capper Seniors photos to show that the building is indeed gone. And heaven help me I even took a photo of the new sign advertising the Square 696 project, and also a few shots barely showing that work started this week on the first Capper parking lot at Third and I (because there's nothing more exciting than documenting the construction of a parking lot). There's just too much change, and I couldn't stop until it had all been documented! Aaaiiiieeeeee!!!!
For those of you brave enough to try, here's all the photos from the past two days on one page. (Thank heavens I've done a lot of work over the past year or so to automate the update process as much as possible.) Don't forget to click on the icons to see all photos of a location over the years....
 

Time again to dig into the What's the Deal With....? mailbag. Reader BH has asked about the two boarded-up gas stations and the old KFC along South Capitol Street, wondering when they're going to be demolished.
I have no answer, alas, for the former Exxon station on the east side of the street at I, which has been closed since May 2006 after its owner pleaded guilty to double-billing government contractors for more than $120,000; JPI was apparently somewhat interested in acquiring it so that they could build 23 I on the entire block, but that doesn't seem to have happened.
The KFC/Taco Bell closed in June after being bought by Ruben Companies, which has long-term plans for an office building on the site, to match their SC1100 on the east side of the street and 21 L Street to the north. However, they are not planning to demolish the KFC anytime soon, and in fact are looking to rent the space to a food-related business in the near-to-medium term.
The second Exxon, on the west side of the street south of K, closed at the end of August. The rumor was that the lot was going to be sold, but so far no transactions have shown up in the DC property sales database. (Ruben owns the other two-thirds of that block, which is the 21 L Street site.)
(I went 1 for 3 on this. Yeeech. This is what I get for not anticipating that WTDW.... questions wouldn't necessarily be ones I know the answers to! But I'm willing to keep trying--if you have a WTDW.... question, pass it along. Be advised, though, that I'm posting these as I can get to them, so submissions may not get addressed right away.)
 
137 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 14
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.