Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: jpi
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


137 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 14
Search JDLand Blog Posts by Date or Category

ANC 6D's monthly meeting is coming up (Monday June 12), and although the agenda hasn't been posted on their web site yet, I've gotten a peek at it, and the main event is a presentation of the baseball stadium plan, in advance of it's June 26 Zoning Commission hearing. Like all ANC discussions, I'm sure this one will be calm and collegial and without incident. Speaking of which, the Hill Rag has the summary of last month's meeting, where the commission voted to oppose a both zoning special exception for the JPI residential project at 901 New Jersey Avenue as well as a public space permit application by the Courtyard by Marriott for an outdoor seating area. (Note that the JPI project received approval by the Bureau of Zoning Adjustment for its project, anyway.)
 

A teensy bit slow on this, I apologize, but I did want to note that the second of JPI's two residential projects in Near Southeast, at 901 New Jersey Avenue (sometimes better known as the "Nexus Site") received approval last Tuesday from the Board of Zoning Adjustment for its variance and special exception applications. There was one condition put on the application--that any antennas on the roof be hidden from view--and JPI agreed to that. Construction will probably begin on this site late in 2006 (ditto for JPI's other site, on I Street).
 

I've now posted renderings of the 70/100 I Street residential project by JPI, grabbed from the public documents filed with the BZA adjustment application for the site. The renderings show two very tall buildings, attached to each other. Certainly will change the look and feel of I Street just a bit! The site continues to be cleared in preparation for construction, which will likely start late in 2006.

More posts: 70/100 I, jpi
 

Getting to be a busy time of photo-taking, so I've added a smattering of photos here and there to my Capper/Carrollsburg, JPI Residentials, Capitol Hill Tower, DOT HQ, New Jersey Avenue, M Street, and new baseball stadium pages. Let the icon be your guide. With demolition continuing at Capper and JPI's 70 I Street, I expect to be updating those pages steadily over the next few weeks. (They appear to be moving more quickly with the Capper demolition at 3rd, 4th, K, and L, and I expect the block to the north, between 3rd, 4th, K, and I, to be next to come down.) And starting soon I'll be updating 20 M Street much more frequently, with the tower's construction finally coming up out of the hole and above ground level. And then there'll be that stadium demolition and construction....
 

A correspondent reports that the long-shuttered row homes in the 900 block of New Jersey Avenue started being demolished today. That block will eventually be the site of a 238-unit residential tower by JPI--everything currently on the block except the car repair shop at the corner of 1st and K will be demolished to make way for the construction, although there's still a few months before the Nexus Gold Club will close (I don't know an exact date), so get your ogling of naked chicks in sooner rather than later. You can see "before" photos of the houses being demolished on my JPI Residential Projects page (toward the bottom, so do some scrolling)--I'll add demolition photos as soon as the sun moves to an optimum position.

 

The Post does the now-ubiquitous story on how the land rush in Near Southeast is forcing out long-time neighborhood nightclubs ("Forced Out by Baseball, Whither the Strip Club?")--this time, the focus is on the Nexus Gold Club, whose landlord sold the property last year to make way for one of JPI's residential projects. The story recounts that the Nexus appears to be having just as much trouble as the now-closed O Street gay clubs in finding a place to move to, even with all the good deeds that the owner has done for the neighborhood over the years. The story says that the club must be out by December 2006, but given the speed with which JPI is moving, and also given some rumors I've heard, I would not be surprised if it's more like early fall.
 

Demolition appears to have begun on the site of JPI's 70/100 I Street residential development. (Although, when it comes to a rundown former trash transfer lot, it's kind of hard to tell that demolition has begun.) I'll get pictures soon. With two building permit applications on file (70 I, 100 I), they appear to be on target for starting construction later this year.
UPDATE, 4/11: I've added a couple of pictures to my JPI Projects page--I'll post more as the demolition becomes more obvious, it's still in the pretty early stages. And I heard today that the property to the north and east of 70/100 I--owned by CSX Rail--is going to get a bit of a cleanup at the same time the 70/100 property is prepped for construction. Which is a good thing, because I'm not sure how much of a marketing draw it is to have a dumping ground of trash and abandoned tires surrounding a new high-rise residential project.
More posts: 70/100 I, jpi
 

Also at the ANC meeting, I found out a bit more about some of the new projects in the Near Southeast pipeline: the JPI residential project at 901 New Jersey (which was called "Jefferson at New Jersey and K" on the display boards) will have 237ish units, a pool, fitness room, conference center, etc. The Preston Partnership is the architect (fun web site, guys!). This project was before the ANC to ask for support in advance of its BZA hearing on May 16; however, its requests for a special exception for roof requirements and also a lessening of the residential recreation space were referred to the ANC's development subcommittee, and the ANC voiced its concern about the lack of an affordable housing component within the project, which will probably be something that developers coming to Near Southeast will need to address. As for the Square 743N Faison/Opus East projects along 1st Street, the alley closings brouhaha over the past few months has been settled (the city council approved the bill on its final reading April 4), the developers were back again, now asking for the ANC's support in its hearing before the Zoning Commission on May 25 for approval of the plans for the office building portion of the project, at 100 M Street. The commission voted 4-0-1 to give its support. Finally, a request for closing a portion of an alley on Square 0697 as part of Lerner Enterprises's 1000 South Capitol Street project came before the commission, and after the requisite squabbling over payments to the community for the loss of "public space", this too was referred to the development subcommittee.
 

It doesn't appear on the web site yet, but the grapevine informs me that on Tuesday the DC Bureau of Zoning Adjustment approved JPI's variance application for their 700-unit, two-building project at 70/100 I Street. With a building permit application already submitted, this project would appear to be on track for the beginning of construction later this year. JPI's other residential project in Near Southeast, 901 New Jersey, will have its own BZA hearing on May 16. Hopefully now I can get some renderings of the projects.... UPDATE: And like magic, a new building permit app for 70 I appeared in the DCRA database today.
More posts: 70/100 I, jpi, zoning
 

While at the Courtyard by Marriott today, I got some great overhead photos of Near Southeast; as I worked to put them on the site, I realized that it was also now time to launch separate pages for three developments that are in the pipeline: JPI's two residential projects on I Street, the mixed-use development project on Square 699N at 1st, Half, K, and L streets; and the Faison and Opus East 1st Street office and residential towers between L and M. Right now the pages are kind of short on specifics, and I don't have renderings of any of the projects, but with JPI and Square 699N looking to start construction later this year, I figured it was time to break them out into their own pages. Also, I added overhead shots to my Capper/Carrollsburg and North of M pages. (And, in looking at my 2006 pictures, have you all figured out yet that I got a new camera?)

 
137 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 14
Search JDLand Blog Posts by Date or Category