Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Restaurants/Nightlife
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


339 Blog Posts Since 2003
Go to Page: 1 | ... 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 ... 34
Search JDLand Blog Posts by Date or Category

Friday's print edition of the Washington Business Journal reports that developer Ron Cohen has purchased the entire block bounded by Half, K, L, and 1st Streets, SE (square 699N), for $55 million, with plans for a mixed-use project that may include 650 condos, a hotel with condos, a stand-alone 250,000 sq ft office building, and possibly retail as well. Tenants on the block--including the nightclubs Wet, Edge, and Club 55--have been told that the buildings will be razed in late spring 2006. Phase I of the project will have 250 condos, and hopes are to begin construction in October 2006, and to have the entire project completed in four years. A few pictures of the block in its current state are on my South Capitol Street Corridor page (you'll have to scroll down a bit for them--this project will eventually get its own page, but not just yet!).

More posts: Restaurants/Nightlife, Retail, Square 699n, Parc Riverside Apts, Velocity Condos
 

Wednesday's Post reports that apartment developer JPI has contracts for two deals in Near Southeast. Later this month they will close on a two-acre site on the north side of I Street (I believe between 1st and New Jersey, although the article is indicating further west on I), with hopes to begin construction next summer on a 700-unit residential project. Just south of that lot, at First and I, JPI is buying the property that currently houses the Nexus Gold Club (a "gentlemen's club"). Their plans for that block aren't yet firm (because they are still trying to buy some of the neighboring parcels), but more residential space would be a good bet. That transaction won't close until late 2006, to give the Nexus time to find a new location. UPDATE: The article was wrong about the location of the two-acre site, but I was wrong, too--it's at 70 I Street, which is between Half and First streets.

More posts: 70/100 I, 909 New Jersey, Restaurants/Nightlife, jpi
 

In what the Washington Blade correctly terms a "little-noticed development," a judge dismissed on June 15 the lawsuit brought by Robert Siegel, the owner of several gay nightclubs in the footprint of the new baseball stadium, saying that the suit was premature because the city has not yet begun eminent domain proceedings. According to the article, "[Judge] Alprin declared that if and when the city begins eminent domain proceedings, Siegel has no legal grounds to challenge the stadium financing rules, as he attempts to do in his lawsuit. His only legal recourse, Alprin said, is to contest the amount of compensation the city offers him for his land, with the aim of obtaining a higher compensation." An appeal has been filed in this case, plus Siegel says he intends to file another lawsuit once the eminent domain proceedings begin (expected to be in mid-August). The city has, however, already informed property owners that they must vacate by Dec. 31.

More posts: Restaurants/Nightlife, Nationals Park
 

The Near Southeast location of Five Guys is now open for business. This local hamburger joint is a great addition to the neighborhood, so drop in for a bite to eat soon, and tell 'em JD sent you :-). It's located on the 1st floor of 1100 New Jersey Avenue (New Jersey and M streets, SE), on the 2nd Street side of the building, facing the future Washington Canal Park. Operating hours are 11 am - 10 pm Mon-Fri and 11 am - 5 pm Sat-Sun. Here's the menu, and also the Contact/Directions page.

More posts: 1100nj, Canal Park, Restaurants/Nightlife
 

Happy 2nd Anniversary to the "Near Southeast" web site! Today's Washington Post had a nice article (registration required) about Andrew Altman and the newly created Anacostia Waterfront Development Corporation, which of course will be a huge driving force in the future of Near Southeast. And, in gastronomic news, "Five Guys Soon" is now scraped into a window on the ground floor of the 2nd Street side of 1100 New Jersey Avenue. Burgers for everyone!

More posts: 1100nj, Anacostia Waterfront Corp., Restaurants/Nightlife
 

Some fun tidbits:
· CVS, Subway, and Chevy Chase Bank reportedly have secured space in 1100 New Jersey Avenue, and local restaurant fave Five Guys is in negotiations to move there as well;
· The demolition of the first "ribbon" of Capper / Carrollsburg buildings--on 5th Street--is slated to begin in August, while the construction of the first Seniors Building is scheduled to begin in September (I'll believe it when I see it!);
· While the Canal Park will take a while to be designed, chosen, and constructed (ETA 2006), there are plans to remove the buses, take down the fences, and smooth out and sod the area. DC just needs to figure out where to park the buses first... (I've heard that before, too ;-) )
· I've added to the site renderings for planned office buildings in the 'Hood, at 76 L Street and 250 M Street (you'll have to scroll down a bit to see them). And one new construction shot each for Capitol Hill Tower and the DOT HQ (which got me a $100 parking ticket in the process; donations accepted!).
More posts: 1100nj, Canal Park, Capper, Restaurants/Nightlife, Retail
 
339 Posts:
Go to Page: 1 | ... 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 ... 34
Search JDLand Blog Posts by Date or Category