Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Florida Rock
See JDLand's Florida Rock Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


142 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 15
Search JDLand Blog Posts by Date or Category

I'm happy with my move to Twitter for much of my "little" linking, but here are a few (somewhat) recent items that still deserve the "hail of bullets" treatment on the blog, especially during a bit of a lull. (But I might have something somewhat cool tomorrow, if the weather holds.)
* From City Paper's Housing Complex blog, a report on some reimagining of the Anacostia Waterfront by middleschoolers as part of the National Building Museum's CityVision program. The Navy Yard, Poplar Point, and Florida Rock were given the treatment, with an underwater library envisioned at the latter, among other notions.
* Urban Turf asked a group of soothsayers to look ahead five years on which "unsung" DC neighborhoods would be attracting homebuyers five years from now. The "Southeast Waterfront" was one of the 'hoods (as once again people make clear that no name yet floated for the area is truly capturing the populace's fancy, which is why I stick with the REAL name ;-) ), and while it will take a while to be "fully realized," the writer reminds readers that Near Southeast has some pretty solid "bones": With "proximity to Capitol Hill, access to Metro and major roads, Nationals Park, a potential streetcar line, a waterfront park that I think will be one of the best in the city and of course the river[,] this neighborhood starts to make a lot of sense as a place to live."
* SWill reports from just across the way about the plans for hip, happenin' shindigs once again this summer at the Capitol Skyline Hotel. "The parties [...] have been named Liquid Lounge and will feature some of the best house music DJs from Washington, DC and beyond. The hotel and Nocturnal Vibe will host their inaugural event on Saturday, June 5th from 2 p.m. - 9 p.m., poolside at the architecturally iconic DC destination."
* With the DC season of Top Chef now having an announced premier date of June 16, it's been confirmed (by DCist) that Nationals Park was the site of one of the challenges (apparently on May 6, according to this tweet). I'm going to LOL if they make guest judge Eric Ripert chow down on nachos, half smokes, two-pound pretzels, or other ballpark haute cuisine.
* And, the subject of filming at Nationals Park reminded me to go see what the latest is on the Reese Witherspoon/Jack Nicholson/Paul Rudd/Owen Wilson/James L. Brooks movie filmed at the park a year ago. It's called How Do You Know, and IMDB says it has a release date of December 17. (Prime Oscar season!)
Comments (0)
More posts: Florida Rock, Navy Yard, Nationals Park, The Yards, Yards Park
 

Catching up from last week.... On Monday (Nov. 9), the Zoning Commission voted 5-0 to approve Florida Rock Properties' request for a two-year time extension on the 2008 zoning order for its RiverFront project at First and Potomac, across from Nationals Park. Citing the current Economic Difficulties, the developers requested the extension so that their deadline for securing building permits for the project's first phase (an office building on the east side of the site, near Diamond Teague Park) is now mid-2012, with a construction start date deadline of mid-2013. My RiverFront page gives all sorts of additional details on the project, if you need a refresher.
The Office of Planning supported the extension request (you can read their report for details), and zoning commissioners Hood and Turnbull both called the project a "good effort," mentioning how much work by the developers, the architect (Davis Buckley) and the commission had gone into the zoning order. (Those of you who haven't been around quite so long may not be aware that Florida Rock first began its long and winding road through the DC zoning process in the late 1990s.) This extension was supported by ANC 6D at its October meeting.
If you want to see the zoning hearing, you can go to the Office of Zoning's wonderful fabulous incredible Video on Demand section, where not only can you pick the meeting you wish to see but can then use their index to skip to the portion of the meeting you're interested in. I may never watch an entire public meeting live ever again!
Comments (0)
More posts: Florida Rock, meetings, zoning
 

While my dinner is in the oven, here's the speediest of reports from tonight's ANC 6D meeting:
* The ANC voted 7-0 on a resolution supporting the city council's proposed marriage equality act.
* They voted 5-2 to support Florida Rock Properties' pending request in front of the Zoning Commission to extend the deadline for the first building permit application at RiverFront two years, to June, 2012, which would push the deadline for the start of first-phase construction to 2013. (Read this entry for more details, and see my project page for specifics on the development itself.) It's expected that this will be taken up at the November 9th ZC public meeting.
David Briggs of Holland and Knight, representing FRP, said that while the developer has worked "assiduously and tenaciously" since last year to find either equity or construction funding, the notion of starting the first-phase office building within the current zoning timeline is "just not viable." FRP does say, though, that they will be continuing to search for funding if they receive the extension. In the meantime, FRP made its required $800,000 payment to the city last fall to help defray the costs of Diamond Teague Park next door; I asked if there were any possibility that perhaps the land on the very east end of the Florida Rock site, which will eventually be a public plaza that abuts Teague Park, might be cleared and opened as public space before the construction begins on the office building--they're "looking at options."
* The commissioners also voted 7-0 to support the zoning special exception request by the operator of the six-unit "Casa degli Angeli" at Third and L, which is currently operating as a month-to-month room rental and which is looking for a zoning change to become a full-fledged bed and breakfast. The Board of Zoning Adjustment hearing is scheduled for Nov. 17.
Comments (0)
More posts: ANC News, Casa Degli Angeli, Florida Rock, meetings, Teague Park, zoning
 

The agenda for Monday's ANC 6D meeting has been posted, with two Near Southeast items listed. The first is that the developers of the RiverFront (aka Florida Rock) site between the Anacostia and the ballpark are apparently filing for a time extension on their zoning PUD ("planned unit development," for those of you mercifully unaware). When the zoning approval for this project finally came through in 2008 (after years of slogging through the process), the developers were given until May of 2010 to apply for building permits for the first phase of the project (an office building on the east end of the site, near Diamond Teague Park), with construction then required to start by May 2011. So, although it was recently reported that Florida Rock Properties is looking for an equity partner to help finance the development of the site, they clearly believe that it will be tough for them to meet the zoning order timeline.
Timeline extensions are increasingly common cases being heard by the Zoning Commission these days, as financing for commercial real estate development continues to be extremely difficult to procure; the Capper redevelopment received one earlier this year. I don't yet see a hearing date for FRP's extension request on the zoning calendar.
In other tidbits:
* Also on the 6D agenda is the "Casa degli Angeli" at Third and L, which has a Board of Zoning Adjustment hearing scheduled for Nov. 17. The six-unit building, which is currently operating as a month-to-month room rental, is looking for a zoning change to become a full-fledged bed and breakfast.
* The latest issue of Voice of the Hill has more detail on the CSX plans to expand the Virginia Avenue tunnel; you can read the documents that CSX submitted to the National Capital Regional Transportation Planning Board for some additional details. Quoting the Voice: "CSX spokesperson Bob Sullivan said the project would take between two-and-a-half and three years, while a District Department of Transportation Department official made a slightly lower estimate. 'We anticipate that there would be some traffic impacts during the course of this project, which is probably going to last a couple of years,' said agency spokesperson John Lisle.'" Neighbors in the area are concerned: ANC 6B will be getting a briefing about the plans at its Nov. 10 meeting.
* On Oct. 27, there's a public meeting about the CapitalSpace plan, "the first comprehensive analysis of Washington's parks and open space in almost 40 years," which is attempting to get the various federal and local agencies that run the many parks in the city more closely coordinated, along with other plans to improve the parks themselves. The meeting is at the MLK Library from 5:30 to 7:30 pm.
 

(I Tweeted this a week ago, then forgot to ever post it here.) From the WashBizJournal: "Florida Rock Properties Inc. is on the market for a joint venture partner to help develop its much-anticipated 1.1-million square foot project, which will put retail, office space and a waterfront plaza on the land across from Nationals Park." My RiverFront page has scads of renderings, showing the designs and planned phases; the initial plans were to construct the office building and public plaza on the east end of the site (by Diamond Teague Park) first; the later phases can't be built until the new Douglass Bridge is constructed and the old one demolished.
Comments (0)
More posts: Florida Rock, Douglass Bridge, Teague Park
 

A press release from the mayor's office (not yet online) tells us that this afternoon Mayor Fenty accepted $800,000 from the developers of Florida Rock/RiverFront for the construction of Diamond Teague Park next door. This contribution was part of the second-stage Planned Unit Development approval given by the Zoning Commission a few months back for the 1.1-million-square-foot mixed-use project.
Here's what the press release says about the park (emphases mine): "The District will use the $800,000 contribution from Florida Rock to help pay for Diamond Teague Park, which is dedicated to the memory of Diamond Teague, a member of the Earth Conservation Corps (ECC) who was murdered five years ago. The Park will include a water taxi; new boat slips for the ECC and fire and life safety vessels; an environmental pier for educational groups, kayaks and canoes; and a riverfront boardwalk and a half-acre park. Construction of the park is expected to start in November and will be completed this spring."
The event was also touted as an "unveiling" of the plans for the Florida Rock site, which I'm assuming (since I wasn't able to be at this event today) haven't changed too much since they were approved by the Zoning Commission in May. The press release has the raw numbers, which don't look too different: "Florida Rock's 'Riverfront on the Anacostia' will include about 560,000 square feet of residential and hotel space - with 29,000 square feet is reserved for affordable housing. It will also include about 545,000 square feet of commercial office space, at least 80,000 square feet of retail and a large waterfront plaza with a waterfront promenade."
But there is one line in the release that's going to chagrin those who have been looking forward to this project: "Construction could begin as soon as 2011." During the time leading up to the final zoning approvals, RiverFront's developers had said that it was possible that the first phase of the project--the eastern office building and the public plaza, adjacent to Teague Park--could see construction begin in fall 2009.
 

* The Post's DC Wire blog is reporting that at 5 pm today DCRA will be having a lottery for the 28 street vending spots near Nationals Park. "Winners will enjoy their spots for one month, starting on June 1. Then the process starts all over again with a lottery on the last Tuesday of each month until the baseball season ends." (Vendors grumbling about neon-green On the Fly's vending on Half Street have found out that the eco-vendor is actually on private property.)
* From the Examiner: David Catania gets back into the baseball carping business, saying the city should get its money back from the consultants who predicted in 2005 that the Nats would average 39,000 fans in the first year at Nationals Park, since there's only been an average of 29,000 fans during the first third of the season. Catania says "that ERA may have seriously overestimated ticket sales, which represents a major portion of stadium-related revenues." However, DC CEO Natwar Gandhi has replied that "the ballpark bonds are structured in such a way "that a significant drop in attendance would not hinder our ability to pay debt service" and that "in a worst-case scenario, total attendance at the new stadium could drop to approximately 10,000 people per game without affecting debt-service payments." The Examiner also says: "Ticket prices at the new ballpark are 20 percent higher than the consultant predicted, Gandhi said, which will drastically reduce the effect of reduced attendance." I wonder if the consultants factored in cold and miserable April weather? The Post's DC Wire has more on this.
* The Nats announced earlier this year that tours of the ballpark are available on non-gamedays; yesterday they sent out word that proceeds from those tours will benefit the team's Dream Foundation, which currently has a number of initiatives underway, including the Neighborhood Initiative that's providing three years of funding to the Earth Conservation Corps. Info about the tours is available here.
* My Ballpark and Beyond column in today's District Extra is short and sweet, with blurbs on the RiverFront/Florida Rock zoning approval and the almost-arrival of 700 new residential units at 70 and 100 I Street.
* Also in the District Extra is a big piece on whether the diversity of the Nats' roster, "combined with their state-of-the-art stadium, will be enough to attract young blacks and Latinos to the game in the District."
* DC United wants the city to pay $225 million for its Poplar Point stadium, which the Post says is "far more than some city leaders say they would support" and that "even the amount officials have considered, $150 million, has raised some concern with D.C. Chief Financial Officer Natwar M. Gandhi, whose analysis has concluded such a deal could push the government above a Wall Street debt ceiling that he recommended last year." In the meantime, Marc Fisher thinks it's all a bad idea.
 

With a unanimous 5-0 vote after a brief discussion, the Zoning Commission approved last night the plans for "RiverFront," the 5.8-acre mixed-use project on the Anacostia River south of Nationals Park, ending the decade-long trip through the zoning process for the site long known as Florida Rock.
Before the final vote, chairman Anthony Hood quoted from the recent ruling by the National Capital Planning Commission that the RiverFront project "would not adversely effect" any federal interests. Remarking that the passage "says it all," Hood read: "This project is expected to bring activity and amenities to the Anacostia waterfront and is respecting the planning for the South Capitol Street corridor and the new Frederick Douglass Memorial Bridge. Furthermore, it is enhancing the connection of the Nationals Baseball Park and surrounding district to the Anacostia waterfront, goals supported by the Anacostia Waterfront Initiative[.]"
Now it's onto construction drawings and a trip through the city's permitting process. It's not expected that work will begin until sometime in 2009 on the first phase of the site, which includes an office building with ground-floor retail and a public plaza across Potomac Avenue from the ballpark's grand staircase. [see update below for caveat]
If you want to know more (dear heavens, I'm not going to go through all the details AGAIN), look at my project page for renderings and also scroll through five years' worth of news items on it all. UPDATE: The press release is out, and I'll note that it gives no indication of when the first phase could start. Given the Monument Realty news of financing troubles, Camden's pause at 1345 South Capitol, and the commercial real estate biz in general, it's probably best to now be pretty skeptical of start dates until permit approvals start popping up and shovels start digging into the ground.
Comments (0)
More posts: Florida Rock, zoning
 

* Don't forget the Metro track work this weekend, and the impacts it's going to have on getting to the ballpark. Read Metro's press release for how it will handle getting fans to and from Saturday's and Sunday's games. (Dr. Gridlock's posted about it again this morning.)
* Now that the ballpark is open, some are wondering what the need is to keep the DC Sports and Entertainment Commission running; read this WBJ piece for a good overview.
* Today's Post has a big article on what DC is going to look like in the future, saying that "the overarching key to redefining Washington resides along the miles of undeveloped land that borders the Anacostia and Potomac rivers, terrain slated for at least four new neighborhoods that District officials and developers hope will be built during the next 20 years," and mentioning the Ballpark District, Southwest waterfront, Poplar Point, and Hill East as the new destinations that could "counterweight" the Mall. (A nice rendering of the vision for the Southwest waterfront is included, too.)
* Ballpark concessionaire Centerplate had a rough first quarter of 2008, reporting a net loss of $11.2 million.
* A columnist from Idaho likes Nationals Park.
* Patriot Transportation Holdings sent out its earnings announcement, which has a nice summary of where the Florida Rock project stands, mentioning that the National Capital Planning Commission gave its "no adverse effect on federal interests" stamp to the project at its May 1 meeting (here's the report). May 22 is the date that the Zoning Commission is expected to give final approval.
* Remember the Community Benefits Fund that was a big part of swaying council members to approve the financing for the stadium? City Paper takes a look at what Mayor Fenty is doing with the money.
* The Nats are holding a youth baseball clinic at the ballpark for more than 100 children from Prince George's County on Saturday morning (May 10) at 10 am. (No link yet.)
* I had to laugh when I read this Post article about the opening of the new Southern Maryland Blue Crabs ballpark last week, since it read an awful like what we all thought we'd see after Opening Night at 1500 South Capitol: "[A]n otherwise celebratory Opening Night last Friday was marred by traffic jams and a significant parking shortage that left some people to walk more than a mile to the new ballpark. 'It was horrible to get here,' said Jane Thomas, who parked on Route 488 and estimated it took her 45 minutes to reach the stadium from her La Plata home. 'They're going to have to figure out what to do about that traffic, because I want to come to games, but I won't do it if it's always this bad.'"
Comments (0)
More posts: Florida Rock, Metro/WMATA, Nationals Park
 

With the ballpark now humming along like it's been here forever (Tom Boswell has a litany of good things to say in today's Post) , interest is starting to turn toward what sort of retail/restaurant options are going to come to the neighborhood, and when. For your Friday time-killing pleasure, I've tossed together a quick a survey of what's either available now or will be coming within the next two years. (I'm not including already existing retail; I'm just looking at where new stuff could arrive.) As of now, I've seen no announcements of tenants for any of these spaces, but maybe if residents, workers, and ballpark fans clap their hands and wish real hard....
* 20 M - Completed in March of 2007, its 11,000 sq-ft of ground-floor retail space would seem to be an enticing location (just across the street from the Navy Yard subway station's ballpark exit), but so far there's been no takers. "Coming soon" signs that were in the windows last year for Wachovia and Kinko's are now gone.
* Capitol Hill Tower - A 7,000-sq-ft restaurant space in the ground floor of this co-op building has been advertised ever since the building opened in 2006, but no takers so far.
* 100 M - The 240,000-square-foot office building at First and M is scheduled to be completed later this year, and they're offering 8,500 sq ft of "corner restaurant/retail space" with "great ceiling heights, storefront and outdoor seating." (There's no ground-floor retail planned for Onyx on First in the same block.)
* 55 M - The first part of Monument's Half Street project is this 275,000-sq-ft office building now under construction at Half and M (it's the building on top of the subway station entrance). It has over 10,000 sq ft of retail spaces on Half, M, and Cushing, and should be completed by mid-2009. (See retail spaces 1 through 4 on this page at the official web site.)
* 909 New Jersey - For the folks who choose to walk from the Capitol South Metro station, the under-construction residential building at New Jersey and K is going to have 6,000 sq ft of ground-floor retail space when it's completed in summer 2009.
* Velocity - The ground floor of this 200-unit condo building at First and L will have retail (I can't find how much), and will be finished by late 2009.
* The Yards - By the end of 2009, the renovation of the old Boilermaker Shop at Third and Tingey into a 46,000-sq-ft retail space should be completed, and there is also 10,000 square feet of ground-floor retail space planned for the Pattern Shop Lofts building on the south side of Tingey, which should have its conversion into a rental building completed by the end of next year as well. Both of these are situated on the route that most Nats Express users walk along to get from the shuttle stop at 300 M to the ballpark. (But will the Nats Express run after this year?)
* Half Street Part 2 - The southern part of the east side of Half Street north of the ballpark is going to be a combination of a 200-room hotel and two residential buildings totaling 340 units, with about 40,000-sq-ft of ground floor retail to entice the throngs that walk along Half Street before and after games. (See retail spaces 5 through 8 on this page at the official web site.)
* 1015 Half - Opus East hasn't yet committed to whether there will be ground-floor retail in this 410,000-sq-ft office building at Half and L, though about 10,000 sq ft of space will be there.
* 23 I - If this 420-unit apartment building does indeed begin construction in September of this year, there could be 15,000 sq ft of retail available at Half and I by the end of 2010.
That's about 200,000 square feet of space to be filled within the next few years--and this doesn't include the retail spaces in the ground floor of the baseball stadium along First Street (who knows when those will be occupied). It's possible other buildings slated to have ground-floor retail could pop up between now and the end of 2010--1111 New Jersey and 250 M are the main candidates.
And there will also could be more offerings at the Yards by 2011 (including that grocery store planned for 401 M as well as the Lumber Storage Shed and other to-be-built pavilions at the Waterfront Park). And maybe the first building at Florida Rock, across from the ballpark's grand staircase, could be done by the end of 2011. But this is getting a little too far down the road....
 
142 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 15
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.