Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: F1rst Residential/Hotel
See JDLand's F1rst Residential/Hotel Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


40 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

With Florida Rock/Dock 79 having graduated from the lineup, the neighborhood now has "only" six holes in the ground, representing five residential projects and two hotels.
Photographic evidence obtained through cyclone fences shows that 800 New Jersey (at right), aka the building that's going to have a Whole Foods in the ground floor, is currently looking like it will be the next development to arrive at ground level, now a little over a year after excavation began.
The other five sites have at least partially gotten to the lowest part of their excavations, and cranes have sprouted at four of them.
From left, in order of time spent shoring and sheeting and excavating: 1111 New Jersey, 801 New Jersey, 909 Half, the Homewood Suites at 50 M, and the Residence Inn/F1rst hotel/residential project at 1st and M:
Which one will make it to ground level next? (Please, no wagering.)
 

"Honey, what do you want to do when you grow up?"
"I want to peek through construction fences to take pictures of huge holes in the ground!"
While I'm pretty sure this wasn't on my childhood list of aspirations, I'll still present to you the latest JDLand State of the Dirt report.
From oldest hole to newest hole, we have residential projects 800 New Jersey/Whole Foods*, Florida Rock/Riverfront, 1111 New Jersey/Galley at Capitol Riverfront, 909 Half, and 82 I, then the Homewood Suites at 50 M, and finally the F1rst/First residential and Residence Inn combo.
* If you are wondering about the new one-story structure at the far left of the above photo that has popped alongside the Park Chelsea and the 800 NJ excavation, which you can, it is the "covered vehicle court" that will serve the garage and loading docks for these two projects and the eventual third building on the block.
(Click to enlarge, as always)
If you wish for more context with any of these photos, follow the links up top to go to the project pages.
 

I see that the two new owners on Half Street decided it was time to clear away the traces of the previous occupants and introduce themselves to the neighbors:
Also now appearing on Half Street (below left) is a spiffy logo for Due South, the restaurant coming this year to the Lumber Shed at the Yards. (The restaurant is a Bo Blair enterprise, as is the Fairgrounds, hence the cooperative crossover deal.) And, one block to the east (below right), it didn't take long for Grosvenor to make its F1rst presence known.
(Yes, I finally went out and took pictures. Be prepared for the coming onslaught.)
 

We've been calling it Ballpark Square, but now the Grosvenor/McCaffery residential, hotel, and retail project along 1st Street SE between M and N has its official name:
F1rst.
(Yes, that's a numeral "1" in place of the "i".)
We also now have an operator for the 170-room hotel--it will be a Residence Inn by Marriott, joining the chain's Courtyard location that's been in the neighborhood since 2006.
The residential building will have 325 units--a mix of studios through 2 BR/den--plus a fitness center, club room, outdoor courtyard, garage with bike parking, and a rooftop deck with a pool, grilling stations, dog park, and an "outdoor multimedia theatre" on the building's southwest corner that will have stadium-style seating and a view into Nats Park.
It will take about two years for the buildings to be completed, though some retail tenants could move in starting in the first quarter of 2017.
And, as I reported a few weeks ago (even though nobody believed me), Taylor Gourmet and Chop't are already signed for some of the project's 25,000 square feet of retail.
The event today did not have shovels and hardhats--which made sense given that the ground has already been broken--but there were dignitaries and speeches, and a ceremonial throwing of baseballs into the construction footprint.
I took photos, of course, and here's the full gallery. A few snippets here, though:
Comments (12)
More posts: Development News, F1rst Residential/Hotel
 

The digging is already underway on the west side of 1st Street SE midblock between M and N, but that won't get in the way of a ceremonial groundbreaking scheduled for Wednesday, April 8, at 2 pm, that will celebrate the start of the 450,000-square-foot Grosvenor/McCaffery residential/hotel/retail project just north of the already under construction Hampton Inn.
This development has been referred to up until now as "Ballpark Square," but apparently its real name will be unveiled at this event.
The rendering above shows, from left, the project's two-story retail building at 1st and N, just across from Nats Parking Lot C, then a blank spot where the Hampton Inn is being built, then the 285-unit (or is it 325-unit) residential building, then the 170-room hotel (no operator so far named). At far right is the 233,000 square foot 99 M Street office building being developed by Skanska, which isn't technically part of this groundbreaking but which appears to be close to getting its own permits to start digging.

Comments (5)
More posts: Development News, F1rst Residential/Hotel
 

The second week in March started off pretty notably in Near Southeast:
First, the one that's probably of most interest, the arrival of Bonchon's signage, now hung outside of its space on the southwest corner of Half and K, inside 1015 Half Street.
I peeked in the door, and it appears to still be a few good weeks from opening, which would seem to jibe with the "early April" target date that the restaurant posted on its Facebook page back in February. So everyone will just have to look at these signs and dream for a little while longer.
One block to the south, fences and equipment arrived at the parking lot on the northeast corner of Half and M, and this morning ground was being broken (for real, not ceremonially!) for what will become a 195-room Homewood Suites.
This will be another addition to the neighborhood's burgeoning lineup of hotels, with the long-established Courtyard by Marriott at New Jersey and L about to be joined by the under-construction 168-room Hampton Inn at 1st and N, plus eventually also the as-yet-unnamed brand in the as-yet-unnamed Ballpark Square project.
Speaking of which.... Fences went up Monday afternoon around the sidewalk on the west side of 1st Street south of M, generally along the boundary of the residential and hotel portion of the Grosvenor/McCaffery project currently referred to as Ballpark Square. No heavy equipment has arrived, and as I mentioned recently there's plans for a ceremonial groundbreaking in coming weeks, but fencing off the public sidewalk would seem to be a bit of a "tell."
This project will have a 285-unit apartment building alongside the 180-room hotel, and 45,000 square feet of retail that will stretch across these two buildings, the Skanska 99 M office building at the corner of 1st and M that is also expected to get started Any Minute Now, and a separate two-story retail building at 1st and N.
And, just to emphasize how many new projects have gotten underway in the past few weeks, here's official documentation (finally) of the work underway at residential projects 909 Half (left) and 82 I (right), which together will add another 615ish units to the neighborhood inventory when they open.
Having a hard time keeping all of this straight? Check out my refreshed-for-2015 What's New in the Neighborhood Since Last Season page, with handy maps of the restaurants that have opened or are coming soon, the new lineup of project plans just north of Nats Park, and the 10 (TEN!) residential projects currently under construction or starting momentarily. Be prepared for a lot of blocked sidewalks and a lot of construction vehicles on your way to the ballpark this year....
Comments (23)
More posts: 1015 Half, Homewood Suites, 801nj, One Hill South, bonchon, Development News, F1rst Residential/Hotel
 

If your tastebuds are on the lookout for additional options in the neighborhood, tell them that I am hearing that Taylor Gourmet and Chop't are slated to be tenants in the pending Grosvenor-McCaffery-Skanska mega project along 1st Street SE between M and N currently dubbed Ballpark Square.*
But said tastebuds will need to be patient, as the project is still a few weeks away from an expected ceremonial groundbreaking, and then it will take a while to construct the project's 285-unit apartment building, 180-room hotel, and 233,000-square-foot office building in the block just north of Nats Park.
All told, there will be about 45,000 square feet of retail across the project, with about 7,000 of it in the separate two-story 7,000 square feet retail building at the corner of 1st and N, also being developed by Grosvenor/McCaffery.
The rendering at right showing the 99 M office building, the hotel, and the residential building as seen from the northwest corner of 1st and M may help get your bearings on the location and plans.
No operator for the hotel has been announced as yet. (And note, as always, that this is separate from the Hampton Inn currently going up on the south end of the block.)
* I've also heard that "Ballpark Square" is actually not the final name of the development. This allows me to yet again point people to my June 2007 post, Name Your Own Near Southeast Development Project!
Comments (16)
More posts: 99m, Development News, F1rst Residential/Hotel, Restaurants/Nightlife
 

* 82 I GETS A PERMIT: Add another project to the ready-to-start-anytime lineup. In this case, it's the 234-unit residential project on the northwest corner of New Jersey and I, which as of this morning has an approved shoring/sheeting/excavation permit. They've looked ready for this moment for a few weeks now, so it'll be interesting to see when work gets underway.
* 909 HALF GETS A PERMIT: Late last week 909 Half Street got its shoring permit as well. This is a 380-unit residential building by Ruben Companies and the Related Companies, and at least one resident is sure that activity is already underway at the site on the southwest corner of Half and I, in the wake of construction trailers having arrived within the past few weeks.
This is the first time in my 12 years of JDLand-ing that a project has gotten this far along without making available a least a token rendering of what's coming, so I figured I'd just fill in the blank. Feel free to create your own.
* BALLPARK SQUARE TEA LEAVES: The parking attendant kiosks have disappeared, the gates have been locked, and cars have stopped parking on the former Nats Lot F along the west side of 1st Street south of M. The residential and hotel project known as Ballpark Square has had excavation permits in hand for the southern part of this lot since November--keep an eye out for the arrival of heavy equipment.
(Note that the north end of the block is going to be the 99 M office building--sort of part of Ballpark Square, sort of not. It doesn't have its excavation permits approved yet, though they are in process.)
* FOUR READY TO GO: If you are keeping track, there are now these approved excavation permits for 82 I, 909 Half, Ballpark Square, and the Homewood Suites at 50 M. That's a lot of new digging to kick off 2015--it's also another 940 residential units and 365 hotel rooms about to drop into the pipeline. Already under construction? Residential projects Park Chelsea, 800 New Jersey, Lofts at CQ, Arris, 1111 New Jersey, and Riverfront, plus the Community Center and a Hampton Inn, too.
* MONUMENT VALLEY TEA LEAVES: At Monday night's ANC meeting, a representative from Jair Lynch's development company was there to discuss the revamped plans for the Half Street Hole, aka Monument Valley, which Lynch and partners bought last year. According to reports from the meeting (I wasn't there), the plans are shifting to include 130 condos alongside the rental units, and to scale it all down because it was "too large." SWill was kind enough to tweet a cellphone grab of the design shown to the commission for the northeast corner of Half and N. This will need to go through a Capitol Gateway Overlay zoning review before moving forward, so there will be more opportunities to see renderings and get additional information. Lynch's rep told me after the meeting that the project is expected to be back in front of the ANC "in the very near future."
* THE DEVIL LIVES AT PARK CHELSEA: Curbed DC took a look at the pile of new renderings on the Park Chelsea web site (with a clock counting down to the start of leasing on July 1) and noticed a very familiar someone in a few of them. Clearly this is the week for having a bit of fun with drawings.
 

ANC 6D ventured across South Capitol Street into Southeast for its meeting on Monday night, with enough items of interest on this side of the street to draw even me to attend. The rundown:
BALLPARK SQUARE: Grosvenor and McCaffery Interests, developers of this hotel/residential/retail project along the west side of 1st Street north of N Street, say that they hope to start construction before the end of the year, though at this point the building permits are still pending. The 325-unit apartment building and 170-room hotel (operator not yet announced) are expected to take about two years to complete once construction gets underway. Their "intention" is to construct at the same time the separate two-story retail pavilion nestled between the arms of the Hampton Inn on the corner of 1st and N, with an eye toward completing it before the 2016 baseball season, though no tenants have been secured at this point.
Once construction begins, the existing sidewalk will be blocked, with pedestrian traffic expected to be moved to a covered structure in the 1st Street parking lane (and bike lane), though the final configuration is still under negotiation with DDOT, with the Nationals offering input as well, given the site's location just north of the ballpark.
Also, note that the 99 M Street office building planned for the north end of this block is being developed separately by Skanska and is on its own schedule, separate from these projects. (Building permits are filed, not yet approved.)
250 M: WC Smith is asking the Zoning Commission for a second third extension to the second-stage PUD for its long-planned 230,000 square foot office building, which was originally approved in 2007, then revised in 2008, and given its first extension in 2010 (and another in 2012). This would push the required date to file for a construction permit to Sept. 2016, with construction being required to commence by Sept. 2017. WC Smith's representatives noted the current state of office development basically requires a building to be 70 percent leased before financing can be procured, but that recent activity in the office leasing market "gives us hope" (especially with about 33 million square feet of GSA leased space turning over in the next few years.) Smith's Brad Fennell said that the company is "committed to the site," feels that office space "is the right use for this spot," and has been working hard to find potential tenants. (All of which is laid out in more detail in the zoning filing.)
The ANC supported the request for an extension 6-1, with Roger Moffatt voting against.
Fun fact for readers who haven't been around for this building's history: it is actually part of the Capper/Carrollsburg Planned Unit Development. It would only occupy about half of the block bounded by 2nd Place, 3rd, L, and M--the north end of the block is slated to someday be a Capper mixed-income apartment building.
(In other WC Smith-related news, I was told that the company hopes/expects to begin pouring the slab at the bottom of 800 New Jersey/Whole Foods in two months or so.)
1244 SOUTH CAPITOL: JBG came to the ANC looking for its support for this project's Capitol Gateway Overlay Review, which I wrote about in detail a few weeks back and which is scheduled for Nov. 13.
There have been some small tweaks to the design, along with now an additional variance request to have two 20-foot and two 30-foot loading bays, since original plans to have a 55-foot bay and two smaller bays has run afoul of the teensy width of the block's alley and of Van Street, where the bays will be located. Otherwise, this remains designed as an apartment building with 290ish units and about 26,000 square feet of retail.
The ANC voted to support the project 7-0.
Comments (7)
More posts: 1221 Van, 250 M/New DDOT HQ, Development News, F1rst Residential/Hotel
 

Even readers without untold millions available to invest might be interested to see Grosvenor's recently released solicitation for a joint venture partner to help fund the development of its portion of Ballpark Square, on 1st Street just north of Nationals Park.
Grosvenor's part of the project includes a 325-unit apartment building, a 170-room hotel by an as-yet-unnamed operator, and 22,000 square feet of retail, with some of the retail in a planned two-story building at the corner of 1st and N. (Skanska is developing 99 M, the office building at the north end of Ballpark Square; the under-construction L-shaped Hampton Inn toward the south end of the block is a separate development.)
There's a colorful brochure with highlights and renderings of the "shovel-ready" project (I especially like the fake "McCaffery's Irish Pub"), along with the basic information page, which has a gallery with a few not-quite-high-res renderings of the buildings' interiors. There's also the details on the amenities, which will include "a 5,000 sf fitness center, indoor/outdoor clubroom, multi-level rooftop amenity space with two pools, grilling stations, stadium seating and a dog run."
The documents say that Grosvenor is expecting to start construction this summer, which tracks with what I heard when doing my shoeleather parking lot reporting a few weeks ago.
Grosvenor also now has a page about the project on its own web site.
Let me look in my sofa cushions....
Comments (9)
More posts: Development News, F1rst Residential/Hotel
 
40 Posts:
Go to Page: 1 | 2 | 3 | 4