Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Trash Transfer Site/DPW
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


23 Blog Posts Since 2003
Go to Page: 1 | 2 | 3

Just arrived this morning is a copy of the raze permit application for 900 New Jersey Avenue SE, far better known as the trash transfer site, where the city's Department of Public Works has operated out of for many years. The block is part of the footprint of the Capper/Carrollsburg redevelopment, and is slated to eventually become a 320-ish-unit mixed-income apartment building.
Its demolition will allow for the construction of I Street between 2nd and New Jersey, which also paves the way for William C. Smith to be able to start on its planned residential project just to the north at 800 New Jersey.
The DC Housing Authority will be handling the demolition, which won't happen until a new DPW home is constructed in Northeast, though they are hoping that the move happens before the leaves start to fall. And then there will need to be environmental abatements on the site, which has had trash-related operations on it for a long long time.
And apparently ANC 6D07 commissioner David Garber won't be trying to landmark the smokestack after all. (Read this comments thread for the background on that.)
Comments (2)
More posts: Capper, Capper New Apt Bldgs, Trash Transfer Site/DPW
 

I'm back in DC, having spent 11 wonderful days in Madrid, Barcelona, and cruising across the Mediterranean to Pisa, Florence, Rome, the coast south of Naples, and Mallorca. Needless to say, while I checked in on the news back home from time to time and tweeted an item or two if the timing was right, I wasn't following developments closely, and I'm pretty out of the blogging groove at this point. So I'm going to start back slowly with some easy items.
* Redistricting: The city council voted Tuesday to approve a redistricting map that, as expected, keeps Near Southeast in Ward 6. This continues to make Marion Barry extremely unhappy, and the Examiner reports that he'll be "asking U.S. Attorney General Eric Holder to open a Justice Department review of proposed new D.C. ward boundaries because, Barry says, they violate residents' civil rights." There's still a final vote to be had on the plan, probably on June 21. As for the last-minute changes that ended up keeping much of Ward 6 intact (moving Reservation 13 to Ward 7 instead of other areas), you can read Tommy Wells's blog for more details.
* Riverwalk: The Navy Yard announced last week that its portion of the riverwalk along the Anacostia River, running from the 11th Street Bridges to the Yards Park, will now be open from 5:30 am until "official sunset," seven days a week and including holidays; though there will still be closures as needed, which are announced on the Navy Yard Riverwalk Twitter feed. (I admit that I got a bit of a kick passing along this news via Twitter while riding on a train north of Rome.)
* DPW Move: The council passed emergency technical legislation on Tuesday that allows Capper PILOT funds to be used to build a new location for DPW operations in Northeast, which means that they should be moving from the 2nd and K site this fall (before "leaf season").
* Ward 6 Family Day: Tommy Wells's yearly event for Ward 6 residents will be held on Saturday, June 25, and will be at the Yards Park for the first time. It's from 1 to 5 pm, with "free food, live music, games and activities for the whole family as well as raffles featuring gift certificates from local businesses and sporting memorabilia from the Wizards, DC United and Washington Nationals."
* ANC 6D has its next meeting on Monday, June 13, at 7 pm at Arena Stage. The agenda is light on Near Southeast items, with only a resolution by David Garber about Near Southeast bike stations and requests by Cornercopia and Harry's Reserve to be exempted from the ban on the sale of "singles."
* Food Truck Festival: Bo Blair, the owner of the Bullpens and the organizer of Truckeroo on June 3, said in an e-mail that the event was a "massive, incredible success," with somewhere between 17,000 and 18,000 attendees and "zero problems." The next date for the event will be announced soon.
* Construction and Destruction: Construction has stalled on the Little Red Building v2.0 at 2nd and L, which ANC commissioner Garber says is a "building permit issue that is in process of being resolved - construction should start back 'soon.'" Meanwhile, the "re-dressing" of 225 Virginia is well underway, with the new exterior walls being hung on the north side of the building. And if it hasn't already happened, the trailer that was the original sales office for Capitol Quarter is being torn down, since construction of townhouses is now underway on that block. (Photos to come, at some point.)
* The Yards on Facebook/Twitter: I kind of stumbled across these (never saw any announcement about them), but the Yards now has an official Facebook page (which is available on Twitter, too) along with a separate one for the Foundry Lofts (its Twitter account is protected, though).
UPDATE: And, since this just came across Twitter: Dan Steinberg reports that Shake Shack and the other new Nats Park restaurants will open next Tuesday, the beginning of the homestand vs. the Cardinals.
 

(There were a number of Near Southeast-related items on Monday night's ANC 6D agenda, so I'm going to break up the reports into a couple of posts. One or two more to come over the next day or so.)
Representatives of the Capitol Hill Day School came to 6D to ask for the commission's support on a zoning case that would allow the school to erect "modular classrooms" on the empty community center lot at 5th and K while their current location at 2nd and South Carolina undergoes renovation. As I wrote last week, the school would occupy the lot starting in June, with the intent of returning to the Dent School building in January 2012. There were a few additional details given last night:
* CHDS has secured 29 spaces in the big parking lot at 7th and L for faculty.
* They will be requesting from DDOT that six of the street parking spaces (half the block) on the east side of 5th in front of the lot be changed to No Parking from 8 am to 6 pm weekdays, to act as a drop-off zone for parents and buses. They will ask parents coming from north of the freeway to drive south on 4th, turn left on L, and then turn left on 5th to pull into one of their four drop-off spots, where kids are guided quickly out of the cars. (You can see this in operation at 2nd and South Carolina.) Their school buses would also operate in those spots during the day. But the spaces would be available for resident parking after 6 pm, before 8 am, and on weekends, with a "minimal" number of nighttime events beyond a Back to School night.
* Headmaster Jason Gray said that the school wants to be "as minimally disruptive as we can, be good community members, and leave the site better than we left it." They'll be landscaping the site (and fencing it), and will clear the lot and clean it up once they move out.
* In return for using this DC Housing Authority lot, CHDS has agreed to fund three scholarships for public housing children to attend the school, though details on how the students will be picked are still being worked out.
The commission voted 6-1 to support the zoning request, with only Commissioner Roger Moffatt voting against. The BZA will hear the case on May 17. If you want to know more about the CHDS renovation project, you can check out their wiki, and they are also keeping a blog on the construction project.
There was also a general update on the progress of the overall Capper redevelopment given by David Cortiella of DCHA. Some bullet points:
* Construction on the second phase of Capitol Quarter is actually a bit ahead of schedule; Cortiella said the first move-ins are scheduled for July/August, but I've heard from EYA that it may be more like May/June.
* DCHA is in the process of building a new lot for DPW so that it can move out of the New Jersey & K site; Cortiella expects this to happen by August, at which time site remediation and demolition can begin, working toward the building of I Street through to New Jersey Avenue (along with all manner of infrastructure work). This would take about 18 months.
* The financing for the mixed-income apartment project on Square 882 (just south of the Marine barracks) has apparently proven difficult to secure, and is still being worked on, with Cortiella saying he "expects" it by the end of the year.
* The community center's financing is dependent on whether a second bond can be floated to get the rest of the $55 million PILOT monies; the $29 million bond sold in 2010 is paying for infrastructure work around Canal Park and the DPW site, and by spring of next year it should be known whether this second bond will be happening.
* The entire project is still on track to eventually provide the 707 units of public housing that were on the site before redevelopment; about 337 have already been delivered.
(Plus, it wasn't mentioned at the meeting, but there's a lottery of up to 11 Capitol Quarter workforce housing units coming March 26.)
 

It's more than 100 pages of high finance and headache-inducing legalese, but nonetheless I've gotten my hands on the "Preliminary Official Statement" for what is expected to be a $29 million PILOT bond sale to fund a series of infrastructure improvements for future phases of the Capper/Carrollsburg redevelopment. (This is the document written for investors to help them decide whether or not to purchase the bonds.) If you want to know all about how these bonds are being structured (with monies from the Downtown TIF playing a part), this is the document for you. It also has some good background on the Capper project if you're just catching up.
But it also has a few tidbits on the current and projected path of some upcoming parts of the overall project, starting on page 19. Here are the items that are probably of most interest, with the usual caveats that no timeline is written in stone anymore:
* Financing for the second phase of Capitol Quarter is being negotiated and is expected to close in mid-2010. Development work would then begin in August, and vertical construction in November. (Phase 2 covers the blocks between Third and Fourth and I and M, and will contain 116 new for-sale townhouses and 47 public housing rental units.)
* All but five of the 121 CQ phase 1 townhouses have sold, and two of those are being held back as model units.
* Financing is "being negotiated" for the planned apartment building on the northern half of Square 882, the site that's been the subject of my recent posts on the Marines coveting the site as well. That financing is expected to close in late 2010 according to this document, with an expected completion date of the apartment building in April 2012.
This $29M bond sale is not the last one for Capper infrastructure; the city council approved a total of $55 million in bond funding back in 2006, and the document says that the city "expects" another bond issuance for the rest of the money, "though the timing of such issuance is currently uncertain" (page 10).
As for what exactly the monies will be funding, the document lays out the following (page 22), though this is for the entire $55 million, so it can't be said that this current $29 million offering will cover all this (which will bum out the people who see the phase "community center"). Some of this work would also happen on the streets surrounding Canal Park:
* Repairing and replacing underground water and utility lines;
* Repairing streets and streetscapes and adding landscaping;
* Demolishing the DPW building (and smoke stack!) at 900 New Jersey, relocating DPW's operations, environmental site remediations (remember, that site was operating as a trash transfer site as far back as 1905);
* Building I Street through to New Jersey Avenue; and
* Constructing the new community center at Fifth and K.
It's expected that the bonds will be "priced" this week, with the sale closing by the end of the month.
I hear rumors that DPW could be out of their site by next spring, as the search continues for a new home for their operations (and maybe is getting close to a resolution).
 

A few articles I've recently pointed to from my Twitter feed that might be of interest but aren't necessarily "news":
* The Examiner says the city spent $115,000 to house snow plow drivers at the Courtyard on New Jersey Avenue during the record February snowstorms--what we always refer to as the "trash transfer station" is also the city's snow plow yard, and so the drivers were being put up close by. (Lots of money was spent at McDonald's, too, presumably the one within walking distance on I Street.)
* The Nats' Stan Kasten speaks to the DC Sports Bog on the rumors of the NHL Winter Classic coming to town. ("I think it's a fun rumor, it's a fascinating rumor, [but] I really do think you're jumping a little bit ahead.... I think it would be great for our city, and great for our ballpark, and together we'd do a hell of a job.")
* In Senate testimony, US DOT secretary Ray LaHood used "the area around the ballpark" as an example of "livability" during a sharp exchange with Sen. Kit Bond. You can see the video here (skip to the 92-minute mark), or read the story about LaHood's testimony on Streetsblog.
* Three Nats games -- April 3, 7, and 8 -- have been deemed "official events" in the National Cherry Blossom Festival. (via the Nats)
* The ANC 6D meeting tonight is at the Courtyard in Near SE, but SWDC Blog posted photos of the commission's new digs in the about-to-open Waterfront development.
* WashCycle thinks that the 10-block temporary tunnel CSX says it will build on Virginia Avenue when reconstructing the existing tunnel ought to be kept for bike/pedestrian use ("lighting would have to be a must", they say).
 

On the heels of the $9.5 million grant received from HUD last week to help kick-start the second phase of Capitol Quarter townhouses, the DC Housing Authority and the city are working on a plan to to help pay more of the start-up costs associated with phase 3 of the redevelopment of Capper/Carrollsburg, in which four mixed-income apartment buildings will someday be constructed on blocks surrounding Canal Park. (See my Capper map for details and locations of these various phases.)
This infrastructure work would be some as-yet-undetermined combination of underground work on the Second Street blocks, the relocation of the DPW operations at New Jersey and K and demolition of that block, and the construction of I Street between Second and New Jersey. These projects were originally expected to be funded by the sale of unrated municipal bonds, but the current Economic Difficulties have made those sorts of bonds all but extinct, and additional attempts to secure loans from banks for the money have been fruitless as well.
Now, a bill is expected to be introduced at Tuesday's city council session amending the 2006 Capper PILOT law to allow for bonds to be issued, guaranteed by the CFO's office (and thereby able to reflect the city's rating on the bond markets), which would be "supported" by real estate tax revenues being collected from various existing TIF projects in the city. If the expected timeline of council approval is met, the bonds--totalling somewhere in the neighborhood of $28 million--could be issued by the end of 2009.
(But don't look out your window on Jan. 1, 2010 expecting to see the trash transfer station's smokestack being smacked by a wrecking ball--they still have to find somewhere for the DPW operations to relocate to, which I'm guessing is more difficult than finding somewhere to move a bunch of schoolbuses, and everyone knows how long that took.)
The proceeds won't all be used for construction, since there are loans to be repaid and other high-finance maneuvers that are well above my level of understanding. But this influx of funding, along with the HUD grant, would give Capper's redevelopment a push forward at a time when few projects are seeing any sort of progress, and would get the money-hungry city closer to being able to start reeling in the property taxes from all these blocks that aren't currently generating any revenue.
UPDATE: Here's the text of the new bill.
Comments (0)
More posts: Capper, Capper New Apt Bldgs, Trash Transfer Site/DPW
 

A few people wrote in over the weekend about this, including one with actual video--apparently a beep of some sort has been emanating from the DPW/Trash Transfer building at New Jersey and K (or somewhere else close by) for at least a week now. I've passed the word to Tommy Wells's office (though I imagine I'm not the first).
Comments (0)
More posts: Trash Transfer Site/DPW
 

A number of readers wrote in over the past few days with news of a new fence that has gone up across Canal Street west of Second, just north of the DPW/Trash Transfer Building where I Street will someday be built to connect Second and New Jersey, as well as another fence across Canal at H, across from the Charley Horse Stables entrance. (The photos are from just a few minutes ago, showing both fences open.) After asking DDOT about it (they said it wasn't their fence, although they did say they are doing some work on the freeway bridge across New Jersey Avenue), I've passed along the news to Tommy Wells's office. Hopefully they'll have further information. Technically the land being enclosed by the fence is on Square 737, which is owned by William C. Smith Co. (I believe these "streets" were technically "closed" in late 2006 in council bill B16-0888.)
Comments (0)
More posts: Trash Transfer Site/DPW, WC Smith/Square 737
 

Some items from the past few days. Big ones first:
* It's probably been true for weeks, but I've just now been by Diamond Teague Park for the first time in a while and can confirm that construction is definitely underway there. Fences are up, cranes (three of them?) are in place, and workers were there. Pictures tomorrow. (Probably *lots* of pictures tomorrow from all over, as long as the weather stays reasonably clear.)
* City Paper got its hands on the letter Mayor Fenty sent to DC Delegate Norton about the city's priorities should the Feds decide to toss some stimulus package dollars in this direction. As I predicted, the two Near Southeast bridge projects were mentioned: "In particular, aspects of the Eleventh Street and South Capitol Street Bridge replacement projects could be undertaken immediately." He also mentions the city's backlog of maintenance projects, along with investments in Metro and the implentation of the streetcar project. And school modernization. And public safety issues.And environmental initiatives. And housing affordability. And health care. (And now here's the stimulus bill itself, though it doesn't get down into specific projects. On the other hand, considering these two bridges ease the commutes to and from the district of the House Majority Leader....)
* Back in mid-November, the transfer of the plot of land known as Reservation 17A from the Feds to the city finally took place; it runs between New Jersey Avenue and Second Street, and is straddled by the trash transfer station building. With this now under District control, various wheels can start turning in that area, including allowing the establishment of I Street between Second and New Jersey that will form the southern boundary of WC Smith's 800 New Jersey Avenue project. There's hopes that the trash transfer station could be demolished in 2010.
* Reader T. reported yesterday that a small bought-at-the-hardware-store For Sale sign went up at 10th and M yesterday, in front of the fence of the Exxon station. I'm not sure what the deal is, since the land is actually owned by the Exxon Corporation, and you'd think they'd have better methods of marketing the land.
* The public notice for the March 19 Zoning Commission hearing on various Capper PUD alteration requests is now available.
* WBJ reports that the Nationals have parted ways with Centerplate, last year's concessionare at the ballpark. This year it will be Levy Restaurants for the food and Facility Merchandising Inc. for the retail.
* More of the fences are coming down at 55 M, as you can see on the web cam. (Though it took me more than a month to notice that the plywood "tunnel" at the Metro exit had disappeared.)
* The Douglass Bridge will be closed at 5 am Sunday until 10am-ish to test the swing span.
 

A recent wander past the Office of Property Management page on 225 Virginia (aka the old Post Plant) brings the news that the deadline for proposals from entities interested in taking over the city's $500,000-a-month sublease has been pushed back to Oct. 15. The page has also been updated with a few other items of note:
* One of the results of the case that's coming before the Zoning Commission on Oct. 27 that seeks to add the plant's block to the Capitol South Receiving Zone would be to allow the property to receive transferred development rights, which allows for increased density (i.e., add some floors on top), though the page notes that "[a]dditional height is expected to be subject to some design review by the Office of Planning."
* The building is not a historic building, and the city will not be seeking any historic landmark designation for it.
There's also this: "The trash transfer station located at 900 New Jersey Avenue, SE is expected to be relocated by September, 2009." I get asked a lot about What The Deal Is with the trash transfer station, so here's a bit of a roundup:
The city is working on moving the current DPW operations out of the building to other locations around the area, with that September 2009 mentioned above now being the official timetable (though perhaps some of the functions will be gone sooner than that). In the meantime, the city is still waiting for the little plot of land on the edge of the transfer station known as Reservation 17A to be transferred to District control from the Feds. (That land will then be transferred from the city to William C. Smith to round out the land that will be home to their 1.1-million-sq-ft 800 New Jersey Avenue project.) This transfer has been hung up for almost two years (it's part of the same transfer that would give Federal land at Poplar Point and in Hill East to the city), but there may be some movement soon.
The next step once DPW has left and the land transfer is settled would be for the city to start the infrastructure work, environmental cleanup, and demolition around the trash transfer site (including the new section of I Street to be built between New Jersey and Second), which will be paid for via another PILOT (payment in lieu of taxes) plan that requires financing via the bond and credit markets--you know, those same bond and credit markets that are wheezing just a wee bit right now.
[All together now:] We shall see....
 
23 Posts:
Go to Page: 1 | 2 | 3




                  © Copyright 2024 JD.