Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Development News
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


331 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category

Today was the annual preseason media tour at Nationals Park, and while I did attend, I think it has been better covered elsewhere, so I am just going to stick to my wheelhouse and let folks know what they will see *outside* the ballpark when they venture to Half Street for the first time in 2018, whether it's for tomorrow's signs-point-to-frigid exhibition game at 4:05 pm against the Twins, or for the official home opener on April 5 against the Mets.
I've put together my annual What's New page with an overview of the latest on construction, development, and food offerings, but of course I must give an overview of the overview:
I think it's safe to say that even the less observant fans will notice that Half Street is now undergoing the change that has been expected for a decade, since the ballpark opened officially on March 30, 2008. Two residential projects that will eventually offer a combined 850-plus units and more than 120,000 square feet of retail are now sprouting vertically, with West Half edging out 1250 Half for the lead at this time.
But these are just two of the seventeen projects currently underway or about to be, which you can see on the map at the top right of each page, or on the full JDLand development map. Once again, driving/walking/biking/scootering in the neighborhood requires vigilance to one's surroundings with all of the activity. If you like to see photos of skeletons or holes in the ground, just start clicking on that map to get your fill.
As for new food options since the end of last season, we'll start with a headline that came down the pike today, which is that All-Purpose has announced it will open on April 3 in the ground floor of Dock 79, just across Potomac Avenue from the ballpark. (Here's Eater's preview of the place.) There's also rumors afoot that two more pizza places--Declaration on 1st south of M and Oath Pizza at 110 M--are targeting April 5 for their own Opening Days. And summer is expected to bring another pizza offering, as Wiseguy Pizza arrives at Canal Park with not only pies but also gelato.
There will also be a milestone of sorts later this season if/when the 10,000-square-foot Mexican restaurant Mission Dos becomes the first outlet to open on N Street, in the ground floor of the new 1221 Van apartment building that opened to residents earlier this year directly across from the ballpark (well, directly across from one of the garages, but you get the idea).
As for eateries that have opened since the end of last season, you can now add Chipotle, Roti, Rasa Indian Grill, Cava, and Chloe to your options if you're looking to get food and/or drink before and/or after a game.
Plus there's also the added riverfront options of District Winery, Due South Dockside, and Morini Piccolo if their mid/late-season arrivals last year didn't make it onto your radar.
See the JDLand food map for the full lineup of current and anticipated outlets east of South Capitol. It's come a long way from 2008.
There's also some other items to be anticipating, such as the start of construction on the new Douglass Bridge and other improvements to South Capitol Street on both sides of the river. There's also the no-really-it's-coming-we-just-don't-know-when opening of Whole Foods at New Jersey and H, which should be by the end of the year, but {insert shrug emoji}. Plus there's the impending arrival of Audi Field up Potomac Avenue, but it's in Southwest and so is outside of my purview (though I couldn't resist sneeking a peek today).
And I imagine I'll being doing something like this again in July, when the masses really descend on Natstown.
Play Ball!
UPDATE: I should have mentioned that I have made a very preliminary update to my Stadium Parking Map, but it's hard to really know the state of affairs until the season starts.There is one big change that is definite--the large surface lot at Half and I is no more, since construction is supposed to start Any Minute Now on a block-wide project there. There is underground parking across the street at One Hill South, though. But it's likely that parking is going to be a little tighter this year.
UPDATES II AND III: It's been announced today that the Aslin Beer Company will be creating a pop-up beer garden in the empty lot between the wings of the Hampton Inn at 1st and N, immediately north of the ballpark. It will first be for home games only, then may expand in May to other days as well. Also, it's being reported that Declaration has a sign in its window announcing that it will open on April 5.
Comments (25)
More posts: allpurpose, Development News, Restaurants/Nightlife, Nationals Park
 

Some stories people have been waiting to hear about for a while:
* MOVIE THEATER MOVING FORWARD: WBJ reports that "D.C. Water, developer Forest City Washington and the District government have settled all outstanding business tied not only to the parcel needed for the long-planned 16-screen, 1,500-seat movie theater, but other sites surrounding it that are similarly planned as part of The Yards."
Forest City should receive the movie theater land in late spring, apparently, with the other residential-planned parcels to come probably over the next five years.

* LERNER BUYS 49 L: The General Services Administration announced this morning that the sale closed on Feb.22 for the one-story brick warehouse on the southeast corner of Half and L, SE.
Property records show that "Half Street Partners, LLC" paid $31 million for the site. And that LLC happens to have a mailing address of 2000 Tower Oaks Blvd., Eighth Floor, which happens to be the address of Lerner Enterprises.
No word yet on the plans for the site, which is (sort of) across the street from Lerner's 20 M office building, and also creates a sort-of Lerner-owned triangle with...

* 1000 SOUTH CAPITOL MOVING FORWARD: Lerner officially announced this week its plans to build the 250-unit 13-story residential building at South Capitol and K that has been working its way through the design and zoning process for the past few years. Designed by Shalom Baranes Associates, it will also have 10,000 square feet of retail along with the lineup of amenities befitting a new "luxury" building--fitness center with Pelotons, private dining room with demonstration kitchen, rooftop pool and entertainment center, and pet spa and bicycle repair offerings for residents. It is expected to get underway late in 2018.
UPDATE: And now we have one more piece of neighborhood news from WBJ today, which is that it has finally been officially announced that the new hotel at 3rd and Tingey in the Yards will be a Thompson boutique hotel.
(Though it must be noted that the WBJ story doesn't seem to quite realize that the hotel is already under construction, in a joint digging-and-building project with Forest City's next residential building, on Parcel L.)
The hotel will have 225 rooms, and the residential building will have about 270 units, and combined the two will have about 24,000 square feet of retail.
 

Getting in just under the wire before my assignment to the 60-day disabled list, the JDLand camera and I made a visit on Monday to 1221 Van, the 290-unit apartment building at South Capitol and N, immediately north of Nats Park.
Many photos were taken, and the most informative of them are in this photo gallery, but a sampling of the offerings are included below.
The official web site has more details on the building and its amenities, as well as the floor plans page that is filterable by price, size, etc. The monthly rents range from $1,725 for the smallest studio to $3,600 and up for penthouse-level 2BR/2.5 BA units (including a 1,638-square-foot unit for $8,200, at least according to their web site).
The building has more than 20,000 square feet of retail, and word came out in late January that Mission Dos will be taking the two-story corner space at Van and N.

But really, go check out the full gallery, which has many more photos.
With this, 1221 Van becomes the 45th project to be completed since I started watching the neighborhood 15 years ago, and the sixth within the past twelve months. So here's a final before-and-after, showing what corner of South Capitol and N looked like up until early 2007, and now:
And now I shall go silent for a bit as I get my hip socket resewn and shaved (not replaced!--yet), but hopefully I will doing some housebound blogging before too long. Might be a while before I take any new photos, since the JDLand camera has in its contract that it does not risk its life for use while on crutches. UPDATE: But I should have noted to keep an eye on my Twitter feed, where it's easier for me to pass along quick updates (like this morning's retweet that apparently the Five Guys is "closed for renovations" again, until baseball season).
Comments (36)
More posts: 1221 Van, Development News, photos
 

Some bits of tid for you:
* NEW PROJECTS STARTING SOON: Residents at Capitol Yards and at Velocity have received notices in recent days about the pending start of two residential projects outside their windows: a 275-unit building by Paradigm on the east side of 1st Street between K and L (the old Market Deli site, for you long-timers), and Tishman Speyer's 800-unit project with potentially more than 40,000 square feet of retail on the Square 696 parking-lot block bounded by I, K, 1st, and Half. There is precious little additional information about either development--when projects are "at right" and don't have to go through zoning approvals, easily grabbed details and renderings can be scarce, but hope springs eternal that more deets will pop up soon. As will the fences, pedestrian detours, and backhoes.
* ONYX SALE: It's been announced that the sale of the Onyx on First apartment building at 1st and L has closed, with local company UIP (Urban Investment Partners) structuring a $95.5 million deal for the building that is now 10 (!) years old. UIP owns and manages about 2,800 apartments in DC and Maryland, and is also behind a lot of local renovations, including the old Howard Johnson's across from the Watergate. What makes this sale a little interesting is that when the previous owners notified residents of an impending sale, they organized under the District's Tenant Opportunity to Purchase Act, and then chose UIP to take the tenant acquisition rights. The press release says that "UIP has committed to installing cell phone repeaters" and will also improve the roof deck kitchens, install dog runs, and undertake other "building enhancements."
* THE BLUE CASTLE: The Hill Rag has shared a neat documentary by the students of the Richard Wright charter school about their school's 8th and M location, entitled "9 Lives of the Blue Castle." Wright focuses its curriculum on journalism and "media arts," for students in grades 8 through 12.
* TUNNEL UPDATES: The presentation from the latest "Coffee with Chuck" has a lot of cool pictures from inside the new Virginia Avenue Tunnel(s), where the JDLand camera does not tread. There's also continuing updates of schedules for cross street closures as the temporary bridge decks get demolished and the roads get rebuilt. Be prepared that a multi-month closure of 4th Street is coming, once 3rd Street is reopened.
 

Another apartment building has officially arrived in the Hood, as this past weekend Agora at 800 New Jersey Ave. opened for both leasing and move-ins on its lowest residential floors.
(Yes, it's the building with the Whole Foods coming to the ground floor. No, there's no word on when it will open, but they have filed for their permits and are still waiting for the city to approve them.)
The JDLand camera was invited for a tour of the new digs, the second of the three buildings in WC Smith's "Collective" development, along with the already completed Park Chelsea and the just-getting-started Garrett.
The official web site has all sorts of information, such as floor plans and prices for released floors and such. It will likely be summer before all floors and the roof spaces are completed. Right now, the rents range from $2,260 for a one-bedroom to $5,040 for one of the three-bedroom corner units.
The amenities include not only the building's own offerings of a game room, demonstration kitchen, fitness center, rooftop pool and dog run, aqua massage chair, and even a golf simulator (no, really), but also access to the amenities at the Park Chelsea and the Garrett (once it's completed).
Here is a sampling of the photos from today, but be sure to check out the gallery to see all of them.
Comments (36)
More posts: Agora/Whole Foods, Development News
 

I somewhat unexpectedly found myself wandering around on Sunday, and though the official JDLand camera stayed home and drank hot chocolate, the JDLand cellphone (a Pixel 2, thanks for asking) stepped in to catch some progress pics.Here's a rundown:
* HELLO, AVIDIAN: After being burned multiple times over the years with projects being said to include condos during the design phase only to end up as rentals, it's nice to have confirmation via the purty new fence signage at South Capitol and M that not only that the corner will be home to the new headquarters for the National Association of Broadcasters, but that the sibling building immediately to the south that was oddly dubbed 10 Van is now known as the Avidian, and that it will be condominiums, "Selling 2018." The building should have 170ish units and will probably be completed in 2019.
* PEEKING OUT: We have three newcomers to ground level, as the 380-unit apartment building at South Capitol and I is now clearly visible from the street, as is the 190-unit rental sibling to the further-along Bower at Yards Parcel O on 4th Street. Plus, the 420-unit West Half building immediately north of Nats Park now has its first batches of rebar out of the ground, if your eyes know what to look for. (And yes, I'm still completely failing at catching the work underway on what's now known as the Emblem at Barracks Row, the 20-unit condo building at 8th and Virginia. One of these days.)
* ONWARD AND UPWARD: The new DC Water HQ continues to get its face put on, while the condo building known as the Bower at 4th and Tingey has completed seven of its 10ish floors, and at 2nd and L the next Capper mixed-income building is through Floor #4 of its own 10ish floors. {Trying to avoid any arguments about whether penthouses = floors.}
* DOWN ON THE CORNER: There's officially another project underway, as digging is now proceeding at 2nd and I for The Garrett, the third and final portion of WC Smith's "Collective" development that also includes the Park Chelsea and Agora (and this, of course). Meanwhile, there are still holes at the second phase of the Parc Riverside at Half and L (below), and at Monument Valley, which is impossible to get a shot of from street level so you'll just have to imagine it. And I forgot to look behind the fence at Parcel L.
There will probably be some new holes in the ground in coming months, as both the rumor mill and the permitting pipeline hint that at least three more projects will get underway: Dock 79's residential sibling at the old Florida Rock site, the large residential development on the old "Congressional Square" site at 1st and K, and Paradigm's 275ish-unit residential building on the old Market Deli site at 1st and L. (Though I'll note that each of these still do not have permit applications in the system yet beyond the initial shoring/sheeting/excavation step.) The number of still-empty lots keeps a'shrinking....
 

Late last week the developers of the apartment building at Half and I known as One Hill South filed with the Zoning Commission initial documents for a required design review for the project's second phase, a 300ish-unit C-shaped building fronting South Capitol Street.
While the existing 383-unit building (One Hill South One?) has about 22,000 square feet of as-yet-unspoken-for retail space, the developers (Related Companies and Ruben Companies) are not currently planning to use any of the second building's ground floor space for retail, unless the demand for retail along South Capitol Street increases in the future.
There is an alley (or, shall we say, "private drive") that separates the two buildings, but the new building will be built with connections above the drive, as shown in the rendering below as seen from K Street, which is paired with a shot of the alley/private drive from a somewhat similar angle.
The new building will have approximately 190 below-grade parking spaces, accessed via the existing ramp in OHSO.
It is designed by Eric Colbert and Associates, and Morris Adjmi Architects.
ANC 6D will be taking up the proposed design at its December meeting on Monday, while a Zoning Commission hearing date has not yet been scheduled.
Comments (26)
More posts: One Hill South, Development News, zoning
 

Time for my quarterly {ahem} update on all of the construction projects you are picking your way past when you walk/drive/bike around the Hood:
I'll start with the new openings and the coming soons, with both Due South Dockside and Morini Piccolo now operating (softly) on the Yards Park boardwalk, and Cava in the Homewood Suites at Half and M in Any Second Now territory:
As for buildings getting their faces on, I present Skanska's 99 M office building and the new DC Water headquarters:
There's also now two new arrivals above ground, as PN Hoffman's condo project The Bower has at last made its debut at 4th and Tingey, as has the DC Housing Authority's as-yet unnamed mixed-income rental building at 2nd and L, both of which are shot from the south instead of the intersection because it's now the time of year when anything shot to the south-southeast, south or south-southwest will look terrible, no matter what time of day:
Next on the assembly line, two more residential projects projects are likely to be making their above-ground debuts before the end of the year: JBG's West Half project directly north of Nats Park, and the McDonalds-slaying 2 I Street project:
Other holes in the ground I won't highlight this time around include the Bower's sibling rental project at 4th and Water, Toll Brother's Parc Riverside Phase II at Half and L, the Jair Lynch residential project at the Half Street Hole, and the combo project at South Capitol and M for the new National Association of Broadcasters headquarters and its next-door residential project labeled 10 Van.
Also, WC Smith has cleared the lot at 2nd and I to make way for the beginning of work on the Garrett, the third and final apartment building that makes up "The Collective" on that block. Plus, fences are up along 3rd Street for the next project in the Yards lineup, the 270-unit apartment building currently known as "Parcel L2." (Great, I have to update my Highlighted Projects map again.)
Just to make sure all ends of the construction spectrum are represented, one hole is even starting to get covered over, and that's in the 200 and 300 blocks of Virginia Avenue, where the Virginia Avenue Tunnel work is far enough along that you can actually start to imagine a street appearing again in those blocks in the coming months:
Finally, I'll close with a shot of a tearing down rather than a building up, and that's the pile of debris formerly known as 37 L Street SE--just in time to mark the 40th anniversary of the Cinema Follies fire, on Oct. 24, 1977.
So, while the neighborhood is taking a back seat these days to all of the excitement surrounding the opening of the Wharf down the road, there is still a fair amount happening. (And hopefully the neighborhood blogger will someday get back in the groove. Still riding the rollercoaster of my new not-yet-ready-to-call-it-normal.)
 

* AMAZON HQ2: Jonathan O'Connell reports on the announcement yesterday that DC has included Southeast DC in the four sites it plans to pitch to Amazon* in the company's quest for a location for its "HQ2," a second headquarters that will need up to 8 million (!) square feet of space. It would require the cobbling together of multiple parcels in Near Southeast, Buzzard Point, and Poplar Point, almost none of which are currently controlled by the DC government. Amazon is expected to make a decision amongst the many cities putting themselves in contention in 2018. For more information on the #ObviouslyDC pitch, go to AlexaWhyDC.com. (And yes, the movie theater site is among the highlighted parcels. But remember, this is the city highlighting which parcels are still available, not what might necessarily come to pass.)
* BOWER SALES: Readers report receiving e-mails from PN Hoffman saying that the sales center for The Bower is expected to open on Sunday, Oct. 29, with some "preview appointments" available for scheduling in the time span between now and then. This is the 138-unit condo project that has been under construction for what seems like forever on the southeast corner of 4th and Tingey at the Yards. The official web site now has floor plans available (which I think I already mentioned, but whatevs).
* CAVA PROGRESS: In response to a Twitter query last week, Cava Grill says that "they are working hard" to get their new location on M Street between Half and Cushing ready to go. "Stay tuned for updates."
* RASA PROGRESS: Eater DC reports on the progress at Rasa Indian Grill, on 1st Street SE between M and N, which the owners "hope" to open in November.
* CHLOE PROGRESS: The restaurant coming to the ground floor of Arris is having a hiring open house on Oct. 26 and 27.
* SE BLVD: No pressure, but today is the last day to make comments on the environmental assessment for Southeast Blvd.
* CONSTRUCTION UPDATES: The JDLand camera has been lazy of late. But, given the weather forecast, I expect that to be rectified this weekend.
* Full disclosure: I work for the Washington Post, now owned by Jeff Bezos, Amazon's grand poobah. But Amazon does not own the Post, it must always be emphasized.
Comments (26)
More posts: cava, Development News, rasa, Southeast Blvd., Bower Condos/Guild Apts/Yards
 

A raze permit has been approved, fences have gone up, and the two-story building at 37 L Street SE that has been home to the Empire and DC Flyer cab companies for a number of years is apparently in its final hours/days/weeks.
The site was purchased last year by DBT Development for $6.7 million, with plans for an eleven-story 74-unit building that apparently will be condos. DBT was also the developer of the condo building at 1350 Maryland Ave., NE.
I had hoped to get some renderings, but decided to stop waiting and get this post up, in case people wonder why fences are now in place.
It is a small site--less than 8,000 square feet--and does not include the WMATA Navy Yard Metro station "chiller" operations immediately to its east, on the corner of Half and L, though that site is also expected to be a residential building, by MRP Realty, if that project is still happening.
It will be interesting to see if it is demolished before October 24, which will be the 40th anniversary of the Cinema Follies fire, when a ground-floor explosion and the resulting flames blocked the exit from the 50-seat x-rated gay movie theater on the second floor, killing nine people with thick toxic smoke.
Comments (24)
More posts: 37l, Development News, square 698
 
331 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.