Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Development News
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


331 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category

For those keeping score at home, we have a new member of the above-ground-construction fraternity, with rebar now poking up at 1244 South Capitol Street, JBG's 290-unit apartment building on the northeast corner of South Capitol and N, immediately north of Nats Park.
(This is the site that has the tower crane with the lit crescent moon hanging from it, if you're someone who has gotten used to seeing that tableau from your seats at the stadium.)
The building is expected to be completed in late 2017ish, and will have 26,000 square feet of retail.
This lot is at the south end of the same block where the new National Association of Broadcasters HQ and its sibling 163-unit condo building 10 Van are expected to begin construction later this summer.
While I don't know anything specifically, I'm guessing that the owners of the Public Storage building that within two years or so will be sandwiched between two new luxury residential buildings get a lot of phone calls from developers.
Comments (43)
More posts: 1221 Van, Development News
 

I always say that I will never take another photograph of a person behind a microphone, but my resolve is weak, so I headed down to the southeast corner of South Capitol and M on this lovely Monday to document the ceremonial groundbreaking for the new National Association of Broadcasters headquarters at One M Street, SE.
While actual construction isn't underway just yet, the shovel-wielding VIPs did their duty. Mayor Bowser, Ward 6 councilmember Charles Allen, DC delegate Eleanor Holmes Norton, NAB chairman Gordon Smith, and other luminaries made remarks, and noted local radio personality Tommy McFly acted as master of ceremonies (his radio station is after all only a block away).
You can see all my photos here, if microphones and shovels are your thing. But here's a few, if that one extra click is more than you can handle:
It's expected that construction will get underway later this summer on both the 120,000-sq-ft NAB HQ (which will have about 4,800 sq ft of ground-floor retail) and a 163-unit condo building immediately to its south, also fronting South Capitol but with an address of 10 Van Street. Both are being developed by Monument Realty, and you can see my project page for more details. If both do get started this summer, the buildings would probably be completed in 2018.
Comments (5)
More posts: Avidian Condos, Development News, Nat'l Assoc of Broadcasters HQ
 

If you are wandering by the southeast corner of South Capitol and M Streets next week and are wondering about seeing a bunch of well-dressed VIPs wielding shovels, it's not a new job training program--it'll be a ceremonial groundbreaking for the new headquarters for the National Association of Broadcasters at One M Street SE, being developed by Monument Realty.
The real work of construction, I'm told, is slated to start later this summer, but the NAB bigwigs were apparently going to be gathering in DC for a board meeting this month and so will take the opportunity to mark the occasion.
(And of course there is no statutory requirement that ceremonial groundbreakings take place x number of days before or after the start of actual digging.)
This headquarters will be a 120,000-square-foot offering with about 4,800 square feet of ground floor retail, and is expected to open in 2018. NAB and Monument announced the deal in April of 2015, calling it the "culmination of a rigorous search for a location with easier access to Capitol Hill that will allow NAB to improve its advocacy efforts."
Monument also tells me that the current plan is to also start this summer on 10 Van Street, the NAB HQ's 163-unit residential sibling immediately to the south, which you can see here and on my One M/10 Van project page.
And the big news that I'm burying all the way down here is that Monument tells me that the decision has been made that 10 Van will be condos, with a mix of one-, two- and three-bedroom units as well as multi-level two-bedroom townhouses facing both Van and South Capitol.
Once it gets started, the NAB HQ would be the second office project under construction, joining Skanska's on-spec 99 M a couple of blocks to the east. The 10 Van project will become part of the long list of residential projects currently being built, and will be the second in this block of South Capitol Street, along with JBG's 290-unit rental building at 1244 South Capitol that is expected to be completed in 2017. These will also be the first projects to get underway in 2016, unless the Yards Parcel O condo and rental buildings get started first.
I guess we'll know for sure that NAB/10 Van construction is truly at hand when the surface parking lot there stops accepting Nats gameday parking....
Comments (8)
More posts: Avidian Condos, Development News, Nat'l Assoc of Broadcasters HQ
 

I wrote last week that Forest City was making its first steps into the public processes for a new 270-unit residential building on the block along 3rd Street south of Tingey known as Parcel L.
On Monday night, there was an initial presentation to ANC 6D about the project, and some renderings were shown to the assembled masses, shots of which have arrived in JDLand's inbox.
I think there is still some tweaking going on--6D was not asked to approve these specifically and there is as yet no zoning filing--but the general idea of a terraced building that would be a large focal point from the Yards Park just to the south probably won't change.
The top image, obviously, is that Yards Park view. These others are the view looking west on Water Street and then looking southeastward from Tingey Street.
Note that this building would not front Tingey Street--there are eventual plans for a hotel to be built along Tingey to the north of the residential project.
Forest City told me last week that a 2019 completion date is the target for this Parcel L project.
As for what used to stand on this site, the old Southeast Federal Center Building 159 was in residence until about 2000, long enough for me to remember it but not long enough to have photographed it with the JDLand camera. (Waaaaaaah!) However, a few years back I did uncover this photo, taken in about 1992, as part of the Library of Congress's Carol M. Highsmith archive. Building 159 is the white building directly between the DC Water Main Pumping Station and what's now the Foundry Lofts building. (You can also see two low red brick buildings fronting M Street next to Spooky Building 213 that I also didn't get to photograph, along with a little red brick annex on the north side of the still-empty Building 170 at 3rd and Tingey.) If you want to see more photos of the neighborhood taken from above in the early 1990s, check them out.
Comments (12)
More posts: Development News, The Yards, Thompson Hotel/Estate Apts./Yards
 

The grapevine informs me that Forest City is moving forward with plans for a new residential building on "Parcel L," the site at the Yards along 3rd Street south of Tingey between DC Water and the Foundry Lofts where a parking lot currently sits.
It would have 270 rental units and two levels of underground parking, and currently has a targeted completion date of 2019 (which just isn't as far away as it used to be).
No renderings are available for public (or blogger) consumption, but my understanding is that it has a "terraced" design, and will be a U-shaped building with a courtyard that opens southward toward the Yards Park and the river. There will be retail along 3rd Street, but I don't know the exact amount.
Also, it should be noted that for the very north end of this parcel, along Tingey, there are also plans to have a "boutique" hotel, but there's no time frame for that.
Forest City is on the agenda for next Monday's ANC 6D meeting to give an initial presentation on the residential plans, in advance of heading off to Zoning Land later in the year.
This is not the only Yards residential project in the near-term pipeline, as the condo and apartment projects two blocks east on "Parcel O" at 4th Street are expected to begin construction in coming months. These projects would join the lineup of already completed Yards residential buildings Foundry Lofts, Twelve12, and Arris. It's also expected that there will be additional residential buildings along 1st Street SE near the planned movie theater.
Comments (17)
More posts: Development News, The Yards, Thompson Hotel/Estate Apts./Yards
 

JDLand has received word that a plan is in the works to replace Half Street's longtime resident Splash Car Wash with a 10-story, 200,000-square-foot self-storage building.
This will require a zoning variance, so that hurdle needs to be passed first, but Splash owner Tim Temple tells me the hope is to start construction in spring of 2017. Splash will remain open in the meantime.
This is a separate project from the plans to redevelop the McDonald's next door as a two-phase residential-and-maybe-more-residential project.
If you look at my favorite overhead photo of this area just south of the Southeast Freeway, you can see Splash's footprint to the north-northeast of the McDonald's and just to the west of the Capitol Power Plant operations.
More as I get it.
Comments (20)
More posts: Development News, splash
 

The rain has sapped my energy, plus I'm in just-back-from-vacation-mode (a short trip to Vegas, which means I'm currently wearing a barrel and standing on a street corner begging for money), but I'm trying to bring you tidbits anyway.
* 909 HALF: The Project Of Which Its Developers Don't Speak has apparently topped out, according to the architects, who I hope won't now be canned for daring to publicly refer to the 380-unit apartment building under construction at Half and I. They also posted a color version of the one rendering we've seen, showing the view up Half Street from south of K. There had been an additional post from the architects saying 909 Half would be opening in December, but that's now gone, probably because getting to completion seven months from now would be, shall we say, optimistic.
* NEW WEB SITES: Actual web sites are now up for both F1rst and ORE 82. (The former had just a placeholder and the latter's URL didn't actually work a few weeks ago when the fence signage went up.)
* JOY EVANS: ANC 6D Commissioner Meredith Fascett has an update on last week's meeting on Joy Evans Park, with a deadline of today (oops) for any comments you might have.
And, a few meetings this week to mention:
* COFFEE WITH CHUCK: The Virginia Avenue Tunnel project has hit the one-year mark this month (only 30 more months to go!). The monthly Coffee with Chuck meeting is on Wednesday, May 18, from 8 to 9 am at the CSX Community Office trailer at 861 New Jersey Ave., SE. RSVP here if you plan to attend.
* PUBLIC SAFETY: The monthly meeting of PSA 106 is Wednesday, May 18 at 7 pm at 200 I St. SE. MPD holds these meetings to address any public safety-related questions and concerns from the neighborhood.
* BIKE TO WORK: I'm too scared to look at the weather forecast, but Friday, May 20 is Bike to Work Day, and once again Canal Park is one of the pit stops.
Comments (1)
 

It appears that we can now add the second phase of Toll Brothers' Parc Riverside development to the lineup of projects that look likely to get underway in coming months, as evidenced from this page deep within a recent Toll Corporate Profile document that lists a 2016 start date and 2018 completion date.
This would be built just to the west of the Parc Riverside and Velocity, along Half Street SE between K and L.
The "Apartment Living" header does also seem to indicate that the planned 314 units will be rentals.
Just as soon as I found this, though, my digging was rendered unnecessary when representatives for Toll appeared at Monday night's ANC 6D meeting requesting support for a public space permit they are applying for.
I wasn't at the meeting, but my understanding is that while Toll said they are hoping to break ground in 2016, they are still in the design phase and are going to need a minor variance for some projected balconies and windows, which would then need to be followed by the usual building permit process.
As for the design, a rendering was shown that looks remarkably like the first-phase Parc Riverside. (I don't have permission to share it, alas.)
And there is apparently a fly in the ointment in that Toll is planning that the access to the Phase 2 underground garage will be through the Velocity garage, as was designed back when the entire block was going to be developed by its then-owner, the Cohen Companies. But Cohen, still the owner of Velocity, apparently disagrees that this access was part of the deal when Toll purchased this lot from Cohen for $14.5 million in 2012.
ANC 6D voted 6-0-0 to send a letter to DDOT recommending that the agency determine whether Toll should be able to use the Velocity garage entrance, but that even if it's decided that Toll does have that right, that "DDOT should still consider the traffic impact of allowing a large number of additional cars to use this garage entrance." The commission also supported the request for a curb cut for a loading dock, but "believes that K St. SE is a better location for a curb cut and loading dock because L St. SE already has numerous curb cuts," while recognizing that this switch "would require substantial redesign" for the project but with what it believes would be a "far superior outcome." (The letter also notes 6D's "general philosophical concern with projections into public space for bay windows.")
More information should be available once the variance is applied for, assuming that remains part of Toll's plan.
Comments (8)
More posts: Development News, Square 699n, Parc Riverside Apts, Velocity Condos
 

I suspect this will bring about some strong feelings, but it is still incumbent upon me to report that a raze application has been filed in recent days for the McDonald's at South Capitol and I Streets.
This is where RCP Development is planning a two-phase project that will start with a 380-unit apartment building.
I know nothing about any expected closing date for Mickey D's, which was just renovated in 2012. But I have heard rumors that the developers are looking to start construction on the apartment project late this year, and this raze application would certainly seem to be in line with that.
As a devotee of McDonald's fountain Diet Coke, I am willing to go on record in saying that this pains me.
Comments (26)
More posts: Novel South Capitol, Development News, mcdonalds
 

The apartment projects F1rst and the as-yet-unnamed building at 909 Half aren't even waiting to be topped out before starting to put their faces on:
There's also now plenty of windows on the Homewood Suites at 50 M, where there is clearly No Time To Lose if they are going to make that October 2016 opening date on the signage. And I bet there will be some windows on Insignia on M before too much longer.
I've also posted updated photos of Agora, ORE 82, the Bixby, and Dock 79, in addition to new shots at the links above.
And there's lots of Slider updates, too, a few of which are previewed below.
 
331 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.