Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Development News
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


331 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category

Developer Jair Lynch's plans to finally get development going on the site at Half and N just north of Nats Park known in some parts as "Monument Valley" or the "Half Street Hole" went before the Zoning Commission on Thursday night for a Capitol Gateway Overlay Review.
I went into detail on the updated designs a few weeks ago, but the quickie summary is that there will be somewhere between 350 and 445 residential units (including condos!) in two buildings, and as much as 68,000 square feet of retail on two floors. (There could possibly be a small hotel as well, which would bring the residential count to the lower end of the proposed spectrum.) There would also be 231 parking spaces and bike parking in three underground levels, the hole for which, as we all know, has already conveniently been dug.
Both Jair Lynch and project architect Chris Harvey of Hord Coplan Macht talked about how the building is designed to bring the "indoors out, and the outdoors in," with huge windows for retail spaces and with the upper floors designed to take in views not of the surrounding skyline but of the street below, especially as the festive gameday atmosphere unfolds. "We believe it will define the ballpark entertainment district," Lynch said, calling it a "unique destination" for the three million people who visit the ballpark and the neighborhood every year.
The comments from the zoning commissioners were uniformly positive*, with the discussion going through especially zoning-y zoning issues, such as the design of the roof, the status of LEED certification (they're going for Silver, apparently), the lack of affordable housing (short version: this project is expensive!) and the location of a lobby entrance at the corner of Half and the new pedestrian-only Monument Place.
Much of the remaining discussion ended up centering around the streetscape plans, with commissioners agreeing that a curbless street being a wise decision with thousands of people walking through and not watching where they are going, but with DDOT needing to work with Lynch's group to decide exactly how to approach, since as of now DDOT really has no guidelines for such a design.
DDOT also appeared to be putting the kibosh on the idea of "catenary lights" across both ends of Half Street (which has been in the drawings for the site for many years), as well as wanting planned bollards ditched and wanting a different layout for sidewalk trees, since the lack of overhead wires on Half means that there could be a substantial tree canopy if the proper trees are used.
In response to a question from commissioner Robert Miller, who described the project as "very long-awaited and dynamic and exciting," Lynch said that the expectation is to break ground in 2016 and be finished in 2018 (presumably in time for a certain all-star event). Cushing Street would be used as the route for construction vehicles (though work would stop three hours before any Nats game), but Lynch also said that the fact that the excavation is mostly complete "should help tremendously."
With the Office of Planning and DDOT each supporting the plan as long as a few items are addressed, and with ANC 6D having voted to support it as well, there appears to only be the need for some mopping up submissions (renderings from street level for Cushing Street and Monument Place, better roof plans, the fixes for OP, yadda yadda), it sounds as if this project should be voted on favorably, perhaps at the June 29 commission meeting.
My page for this Half Street project gives additional details on the site, as do my previous posts.
And maybe before too much longer we'll see some details of JBG's plans for the other side of the street.
* Or, in the case of Peter May, not actually negative.
Comments (30)
More posts: 1250 Half St., Development News, zoning
 

With a May 28 Capitol Gateway Overlay design review on the calendar, the Jair Lynch/Half Street Hole project has within the past few days submitted additional materials to the Zoning Commission. And since I know how much everyone loves renderings....
The one I know will be of most interest is above left, showing what the new skyline would look like just to the northeast of Nats Park as seen from home plate, where Lynch's planned residential project will be situated. (They seemed to have tried to go for some sort of tilt-shift look, so it's not your eyes or my image file that's blurry, it's the original.) At right is a sharper/snazzier view of the building as seen from ground-level at Half and N, with the glass-walled corner portion of the planned 60,000-plus square feet of retail space a definite focal point. The darker façade facing N Street delineates the planned condo portion of the project from the rental units (and possibly a hotel, or possibly not) around the corner on Half.
I wrote in detail about the plans for the site a few weeks ago, or you can check my Lynch Half project page for additional details.
Meanwhile, in other Ballpark District 2.0 news, I see an indication of forward progress on JBG's planned 290-unit residential project just north of the ballpark at 1244 South Capitol: an application was filed last week for a shoring/sheeting/excavation permit (got to dig down before you can build up!). The company has said they are looking to begin construction in late 2015 or early 2016.
Comments (8)
More posts: 1221 Van, 1250 Half St., Development News, zoning
 

New renderings have been passed along today of the apartment building in the early stages of construction on the northwest corner of New Jersey and I Streets, currently known in the parlance as 82 I Street:
(Of course, that lush green field just across New Jersey is architectural license, since we know that space is not now, nor has it likely ever been, a grassy expanse. Instead, this building will be facing the Park Chelsea and 800 New Jersey apartment buildings, as well as the Whole Foods scheduled to go in on the ground floor of the latter.)
It's now confirmed that the building will have about 5,500 square feet of ground-floor retail (making a certain someone so very excited!), and the new drawings give a clearer view of the ground-floor spaces.
UPDATE, 5/5: With word of a ceremonial groundbreaking at the site today, within which the site is referred to as being at 801 New Jersey, I am going to make an executive decision and dispense with the 82 I stuff going forward. So say hello to 801 New Jersey!
Comments (33)
More posts: 801nj, Development News
 

With the late-winter flurry of new construction starts now over, and with so many projects now underway, I started to think about exactly how far along this whole Building of a New Neighborhood is, and how much is left to go.
So of course rather than looking at acreage, or square feet of build-out, I just made a goofy map, based on my now Google'd Neighborhood Development Map.
The filled-in blocks are projects that are now completed or currently under construction. (And, with the exception of Van Ness Elementary, the Carroll Apartments, and that big brown Navy Yard block, all of them have been built or "adaptively reused" since 1999.)
The dark blue squares are projects that would seem to have a pretty good chance of getting underway within the next year or so, though of course I retain my hard-won skepticism of not truly believing a project timeline until I see shovels in the ground.
Finally, the red circles are the locations where buildings are planned but don't at the moment appear to be close to getting started.
The tally?
* 21 new buildings completed, plus the seven-block expanse of townhouses at Capitol Quarter;
* Three buildings renovated extensively for new uses;
* Three parks completed;
* One baseball stadium completed;
* 12 buildings currently under construction;
and
* 36ish buildings to go, with nine of them looking to potentially be getting underway by mid-2016.
That would appear to place things at somewhere around 50 percent complete, it would seem, while keeping in mind all manner of caveats about changing plans, poor counting decisions on my part, and more.
I wouldn't want to begin to attach a timeline to when every project will be completed, but I'd note that we are 16 years into the razing and rebuilding of Near Southeast, a time frame which included not only the Housing Bubble and the stadium-related Land Rush but both the post-9/11 recession and the Great Recession of 2008. So, one might reasonably ponder that there could be another 15 years to go, with some "pauses" built in.
I might need a new camera at some point.
UPDATE: Of course, within seconds of posting this, I realized I missed creating a circle for one in-the-future project, so that ups the count to 36. {pause} Or 37. I totally meant 37.
Comments (27)
More posts: Development News
 

I imagine there's some sort of more official rollout to come, but I'll just jump the gun as I see evidence this evening that "Riverfront" isn't going to be the name for the apartment building currently under construction at the old Florida Rock site.
Instead, say hello to "Dock 79," now on Twitter at @Dock79DC.
It looks like there will be an official web site in the near future, but I don't think they are ready for company just yet.
Way (way!) back when, the project was christened "Riverfront on the Anacostia," so I admit to never quite being sure that the "Riverfront groundbreaking" was referring to the project or the building, but no one ever corrected any of posts here or in lots of other outlets using that name for this building.
But now we know.
And I now I must roam through my site to add the new name everywhere.
 

I already looked down this month, now it's time to look up.
* ARRIS: Let's start with the now-topped-out Arris apartment building at the Yards. In addition to its having reached its final height, the masonry work on the five lowest floors of the eastern portion of the site is pretty far along, and windows have started appearing in the second floor.
While the three "pavilions" on the western side (not seen real well in this shot, but check the rendering) will be brick-faced all the way up their eight floors, the east tower's upper façade will be all glass, with an undulation that's obvious even with just the concrete in place.
This building will have 325 rental units and 20,000 square feet of ground-floor retail and is expected to open in early 2016.
* PARK CHELSEA: It certainly won't win the prize as Speediest Construction Project Ever, and the countdown to the start of leasing has changed its target from July 1 to September 15, but work on the 430ish-unit rental building on New Jersey Avenue does continue. You may have seen the forms with the planets-and-the-stars design that have now been hoisted up to their final perches on the roof--I've been told this is based on Johannes Kepler's "star polygon tessellations," which I concede is way too much education for JDLand to normally pass along.
* LOFTS AT CAPITOL QUARTER AND CAPPER COMMUNITY CENTER: They may not be tall, but they are wide--as is my lens, thankfully. If you are wondering about the concrete portion on the western end of the Loft's construction, that's parking for residents of the building's 195 mixed-income units. The two projects, both along L Street between 5th and 7th, should be completed in 2016.
* THE BRIG: I certainly could have used a drink after the 11 miles of walking I did in two passes on Sunday to properly update my photo archive, but while work on the beer garden at 8th and L to be known as The Brig continues, it still has a ways to go before it begins quenching thirsts. But it's interesting to now start to see the outline of its contribution to the "skyline" along 8th.
The links above have lots more information on each project, of course. And I skipped the Hampton Inn in the roundup, but I wouldn't want it to feel left out.
 

"Honey, what do you want to do when you grow up?"
"I want to peek through construction fences to take pictures of huge holes in the ground!"
While I'm pretty sure this wasn't on my childhood list of aspirations, I'll still present to you the latest JDLand State of the Dirt report.
From oldest hole to newest hole, we have residential projects 800 New Jersey/Whole Foods*, Florida Rock/Riverfront, 1111 New Jersey/Galley at Capitol Riverfront, 909 Half, and 82 I, then the Homewood Suites at 50 M, and finally the F1rst/First residential and Residence Inn combo.
* If you are wondering about the new one-story structure at the far left of the above photo that has popped alongside the Park Chelsea and the 800 NJ excavation, which you can, it is the "covered vehicle court" that will serve the garage and loading docks for these two projects and the eventual third building on the block.
(Click to enlarge, as always)
If you wish for more context with any of these photos, follow the links up top to go to the project pages.
 

I see that the two new owners on Half Street decided it was time to clear away the traces of the previous occupants and introduce themselves to the neighbors:
Also now appearing on Half Street (below left) is a spiffy logo for Due South, the restaurant coming this year to the Lumber Shed at the Yards. (The restaurant is a Bo Blair enterprise, as is the Fairgrounds, hence the cooperative crossover deal.) And, one block to the east (below right), it didn't take long for Grosvenor to make its F1rst presence known.
(Yes, I finally went out and took pictures. Be prepared for the coming onslaught.)
 

It's a noteworthy enough event that Forest City has issued a press release this morning announcing the final pour of concrete that marks the "topping out" of its 327-unit Arris apartment building at the Yards, on the southwest corner of 4th and Tingey. (So if you see a bit of a celebratory-looking luncheon at the construction site today, that's why.)
The eastern side of the building, along 4th, is 11 stories high, while the three western wings reached eight stories a few weeks ago. When finished, Arris will have 19,000 square feet of ground-floor retail, and "some of the best waterfront views in the city."
It's now being said that the project will be "substantially complete" in early 2016.
An initial web site where you can sign up for information on leasing is at LiveArris.com.
Forest City tells me that work on the facade will continue through the next few months, with the expectation that the building will be completely enclosed by the end of the summer.
Also nestled into the press release about Arris is the statement that sometime this summer "development will begin on a 50-slip public marina as the newest addition to Yards Park," with completion expected by the end of the year.
(I was planning to get updated photos this weekend, so dang it, no up-to-the-second shots available. But you can see what it was looking like in late March.)
Comments (3)
More posts: Development News, The Yards, Arris/Parcel N/Yards
 

Word is hitting the streets this morning that Akridge has now sold its remaining holdings on the west side of Half Street just north of Nats Park, ending an ownership that began in 2008 but that saw the Fairgrounds as its only development.
Back in February, Akridge sold the southern two-thirds of the block-long lot to JBG, and at the time it was said that the company was also "under contract to recapitalize the northern third of Half Street." It turns out that that "recapitalization" was a sale to an affiliate of Brandywine Realty Trust for $20 million, according to WBJ.
Akridge's arrival on this lot began back in 2007 when the company won a WMATA bidding process for what was then the Southeastern Bus Garage site. But Monument Realty, expecting to have the rights to develop the site, was quite unhappy, and sued, which resulted in the settlement that awarded the bus garage site to Akridge for $46.5 million and the adjacent Metro parking lot across Van to Monument for $22.6 million. Monument then sold its holdings on the south end of the bus garage block to Akridge for $9.66 million.
The company got zoning approvals in early 2009 for its Half Street plans, as a 700,000-square-foot mix of two office buildings, one residential building, and 56,000 square feet of retail. But, of course, none of that ever happened, and in the meantime Akridge provided the space for first The Bullpen, then Das Bullpen, then the block-long Fairgrounds site.
Now we wait to see what the plans for the north end will be, now that JBG has said it will be building two residential offerings on its portion near the ballpark.
(And I know the web site response is atrocious this morning. Guess I'm going to have to stop just wishing it will get better, though the support people tell me that a lot of this is supposedly now the fault of another site on the same server, which has two more days to clean up its act or else it'll be shut down. We Shall See.)
Comments (14)
More posts: 25m, West Half St., Development News
 
331 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.