Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Development News
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


331 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category

With unanimous agreement that the need to get former public housing residents back to the neighborhood is paramount, the Zoning Commission on Monday gave first approvals to the DC Housing Authority's request for flexibility in how it allocates 206 affordable units still to be built within the Capper/Carrollsburg PUD boundaries, while still being required to have no fewer than 15 percent and no more than 50 percent of the units on any square be affordable.
ANC 6D remains adamantly opposed to the flexibility idea--or at least to the idea that this flexibility would then allow a possible all-affordable building next to a market-rate condo building on Square 767--saying it "would circumvent the theme of HOPE VI revitalization and the goal of the PUD."
But Zoning Commission vice-chair Marcie Cohen disagreed, saying that the success of Capper's revitalization is that "the area is mixed income, the neighborhood is mixed income," and that she doesn't have a problem "when public housing is a single project within a mixed-income neighborhood." Noting that some of Capper's previous residents were relocated from the site now more than 10 years ago, Cohen said that "the people who have been displaced have a right to come back"--and given that "financing vehicles are now driving housing policy," meaning that getting affordable housing units financed has become so difficult--the Housing Authority has in her view come up with a plan that is "satisfactory," and should be able to go ahead and "secure the proper financing, build the project, and get some of the people back if they choose."
Her fellow commissioners concurred, with both Robert Miller and Michael Turnbull also noting that all projects on the three remaining residential squares at Capper will need to come to the Zoning Commission for review before moving forward.
And in its response to the ANC 6D letter, the Housing Authority emphasized this point, saying that the concerns raised by 6D will be addressed at that time, and that the reviews "will also demonstrate that the design of the buildings and distribution of the units in those applications are consistent with the PUD's overall goal of providing a vibrant, mixed-use and mixed-income community."
This case also will allow 30 of the Capper affordable units to be relocated to Square 737, to be included in both the 800 New Jersey/Whole Foods building and the eventual third-phase residential building on the eastern portion of that block.
My previous post on this zoning case gives plenty of additional detail if you desire.
Comments (54)
More posts: Capper, Development News, sq767, zoning
 

On Monday night the Zoning Commission gave final approval to first-stage plans for the Cohen Companies' 1333 M Street residential project, along with second-stage approvals for the development's first phase, a 10-story 218-unit building.
The final approvals had been slowed by a number of items that concerned the commissioners. Among them:
* While a memorandum of understanding detailing benefits and amenities of the project had been worked out earlier in the process between the developer and ANC 6B, neighbors that live along L Street SE north of the project continue to have objections to various aspects of the project, such as there only being 220 parking spaces for a 673-unit development, as well as the impact of the standard hours of construction on their "quality of life," which Chairman Anthony Hood keyed on as an item where there could have been some "negotiating," though commissioner Peter May noted that the building is not particularly close to L Street SE (with the new Southeast Blvd. and the CSX train tracks separating the two).
* The lighting plan for the building, which had originally been shown with a fair amount of up-lighting but is now all down-lighting after the commissioners objected.
* The plan for a "place-making sign" on the building's penthouse had gotten Peter May up in arms at the Proposed Action stage, and so the developer came back with additional options. (If you click to enlarge the rendering at the top of this post, you can see up at the roofline a smidge of the BROOKLAND-like sign facing north.)
May and the other commissioners still sighed a bit over there being a sign up there at all, but did agree that Option 1 is a "more subtle" version that is an "improvement." I have a notion that some readers might disagree:
In the end, though, there were no showstoppers, and the commission voted 5-0 to approve both the first-stage PUD for the overall project and the second-stage PUD for the first residential building.
My 1333 M project page has additional renderings and information--and if you are new to the story and can't quite visualize where 1333 M even is, it's on the part of M Street that proceeds eastward underneath and past the 11th Street Bridges.
UPDATE: Forgot to include that the project made it past the National Capital Planning Commission as well.
Comments (3)
More posts: 1333 M, Development News, zoning
 

From WBJ: "D.C. developer Akridge has sold the majority of its Half Street parcel across from Nationals Park to The JBG Cos., which is expected to redevelop the site with two new residential buildings and a large amount of what one executive called "dramatic" retail."
JBG has acquired the southern two-thirds of the block, far better known as the shipper container-ringed location of the Fairgrounds, directly across N Street from Nats Park and also directly across Van Street from JBG's own under-development 1244 South Capitol residential project.
Akridge apparently is maintaining a minority stake in that portion of the site, but JBG will "take over day-to-day development duties." WBJ says Akridge is also apparently "under contract to recapitalize the northern third of Half Street."
After Akridge acquired the site in 2008--which was once home to WMATA's Southeastern Bus Garage--plans were run through the Zoning Fun Factory for two office buildings on the north end of the site and a 280-unit residential building on the south end (along with 55,000 square feet of retail), but WBJ says that JBG's portion of the block is now expected to include two residential buildings, with one office building on the land Akridge still owns along M Street. Plus "dramatic retail."
WBJ pegs the sale price for the JBG portion of the site at $45 million.
This is not unexpected, as news had surfaced back in September that Akridge was looking for a new partner to develop the site.
It also dovetails with the sale of Monument Valley on the east side of Half Street to the MacFarlane/Lynch development team, which is early in the process of bringing residential offerings along its own portion of N Street.
You can look at my Akridge Half Street project page for reminders of what had been planned for the site, though I look at that page (and my Monument Valley page) more as a marvel of the tens of thousands of words I have expended on plans for these sites over the past 10 years.
Comments (21)
More posts: West Half St., Development News, West Half St.
 

* 82 I GETS A PERMIT: Add another project to the ready-to-start-anytime lineup. In this case, it's the 234-unit residential project on the northwest corner of New Jersey and I, which as of this morning has an approved shoring/sheeting/excavation permit. They've looked ready for this moment for a few weeks now, so it'll be interesting to see when work gets underway.
* 909 HALF GETS A PERMIT: Late last week 909 Half Street got its shoring permit as well. This is a 380-unit residential building by Ruben Companies and the Related Companies, and at least one resident is sure that activity is already underway at the site on the southwest corner of Half and I, in the wake of construction trailers having arrived within the past few weeks.
This is the first time in my 12 years of JDLand-ing that a project has gotten this far along without making available a least a token rendering of what's coming, so I figured I'd just fill in the blank. Feel free to create your own.
* BALLPARK SQUARE TEA LEAVES: The parking attendant kiosks have disappeared, the gates have been locked, and cars have stopped parking on the former Nats Lot F along the west side of 1st Street south of M. The residential and hotel project known as Ballpark Square has had excavation permits in hand for the southern part of this lot since November--keep an eye out for the arrival of heavy equipment.
(Note that the north end of the block is going to be the 99 M office building--sort of part of Ballpark Square, sort of not. It doesn't have its excavation permits approved yet, though they are in process.)
* FOUR READY TO GO: If you are keeping track, there are now these approved excavation permits for 82 I, 909 Half, Ballpark Square, and the Homewood Suites at 50 M. That's a lot of new digging to kick off 2015--it's also another 940 residential units and 365 hotel rooms about to drop into the pipeline. Already under construction? Residential projects Park Chelsea, 800 New Jersey, Lofts at CQ, Arris, 1111 New Jersey, and Riverfront, plus the Community Center and a Hampton Inn, too.
* MONUMENT VALLEY TEA LEAVES: At Monday night's ANC meeting, a representative from Jair Lynch's development company was there to discuss the revamped plans for the Half Street Hole, aka Monument Valley, which Lynch and partners bought last year. According to reports from the meeting (I wasn't there), the plans are shifting to include 130 condos alongside the rental units, and to scale it all down because it was "too large." SWill was kind enough to tweet a cellphone grab of the design shown to the commission for the northeast corner of Half and N. This will need to go through a Capitol Gateway Overlay zoning review before moving forward, so there will be more opportunities to see renderings and get additional information. Lynch's rep told me after the meeting that the project is expected to be back in front of the ANC "in the very near future."
* THE DEVIL LIVES AT PARK CHELSEA: Curbed DC took a look at the pile of new renderings on the Park Chelsea web site (with a clock counting down to the start of leasing on July 1) and noticed a very familiar someone in a few of them. Clearly this is the week for having a bit of fun with drawings.
 

In a WaPo piece about DC budget wranglings, Mike DeBonis dropped this little tidbit:
"Several council members pressed [City Administrator Rashad M.] Young to unfreeze a $5 million grant to the Washington Humane Society, which contracts with the District government to handle its animal control functions. The grant would help the nonprofit group acquire property near the Washington Navy Yard for a new headquarters to replace its facilities on New York Avenue NE and Georgia Avenue NW."
And budget documents even tell us exactly where this property is--the 36,500-sq-ft lot on the northwest corner of 11th and M streets SE, where an Exxon station stood until 2008.
The Exxon lot also just happens to abut the Society's spay and neuter clinic. which has operated at 10th and L SE since 2007. The current appraised value of the Exxon site is a smidgen over $6 million.
The article also says that "Jack Evans (D-Ward 2) and Mary M. Cheh (D-Ward 3) told Young that the deal’s closing is rapidly approaching and could be jeopardized if the funds aren’t unfrozen."
Kittehs! Doggies!
Comments (14)
More posts: Development News, humanesociety
 

If you spend much time on 4th Street in the Yards, you can be forgiven for looking at the concrete skeleton rising up next to the Foundry Lofts and assuming that Forest City's Arris is going to just be another boxy DC apartment building.
And that is more or less true--for the five floors that have been built.
But there's for the next six floors, there's going to be a shift, as the design--by Robert A.M. Stern Architects--turns into a very angled, wavy, and even slightly off-centered ultra-modern offering. It's going to look like a glass tower was plopped not-altogether-carefully on top of a rectangular brick low-rise offering.
Look closely at the renderings (click to enlarge), which both show the building from Water Street, and compare them to the above photo, counting the floors already constructed to confirm that along 4th Street the construction is about to look very un-rectangular:
On the building's west side, next to the Foundry Lofts, there will be no glass top, but instead three eight-story mini-towers, with two private courtyards. It's not quite so easy to get photos that clearly show the "reverse-E" outline of the west side, but I did at least try.
The from-above rendering also gives a good view of the rooftop "amenities deck" on the glass tower.
One thing not readily apparently in the drawings is how much taller this building is going to be than anything nearby. So, get ready for a veeeeeery different skyline in the coming weeks.
Arris has 20,000 square feet of retail on three sides of the building's ground floor, facing 4th, Tingey, and Water streets, and the building is scheduled to open late this year or early next year.
There's more drawings and photos on my project page, including some "before" shots of the building's footprint that emphasize how much this block has changed, even before work started on Arris.
Comments (8)
More posts: Development News, photos, The Yards, Arris/Parcel N/Yards
 

Thankfully my camera shutter does not seize up in cold weather, because I spent more than two hours on Saturday wandering the neighborhood* to catch up on all of the latest doings, of which there are so many these days.
I looked at The Brig.
I looked at a few other spots that you'll hear about soon.
Unsurprisingly, I also looked up.
And what a sky to look up at.
(Just ignore all those dust artifacts marring the magnificent blue. Time to buy my own sensor cleaning kit.)
I looked up at the Hampton Inn at 1st and N, which now has most of its windows and appears to be about to get its facing. Maybe it looks a smidge less like a grain elevator now.
Then I looked up at the VIDA Fitness complex at Twelve12, originally to document the new Bang Salon and Penthouse Pool Club signs, but how I could resist yet another shot of the VIDA sign when I saw this?
I've mentioned the Banfield Pet Hospital sign before, but seeing it there reminds me that a reader passed along a Banfield tweet from early January saying that Banfield would be opening Feb. 7. Keep an eye peeled for the removal of the window coverings....
And finally, we have the Park Chelsea, which remains thisclose to getting its masonry completed, with the second photo included mainly to give me an excuse to sneak in a shot of the scaffolded Capitol dome.
If you like photos of vertical construction against a deep blue sky, stay tuned.
* But, hey, 11,000 steps!
 

The Capitol Riverfront BID held its annual meeting on Thursday in the PNC Diamond Club at Nationals Park, where Max Scherzer was not in attendance, though Matt Williams stopped by and spoke for a few moments.
The main purpose of an annual meeting--beyond the networking and schmoozing--is the unveiling of the Annual Report, which is worth digging into for all sorts of numbers and graphs and summaries, though note that it hides no truly bombshell pieces of news for loyal JDLand readers (whew!).
That said, there were some items I haven't passed along before, one being that Forest City is planning to build a 190ish-unit apartment building alongside the PN Hoffman condo building coming to 4th and Tingey on the current Trapeze School site, with construction expected to begin on both late this year or early next. Forest City is also apparently planning to begin work this year on the marina and piers at Yards Park, and expected 2015 start dates were shown for Skanska's 99 M Street office building and Ruben's 909 Half Street residential building, alongside the already expected pending starts of Ballpark Square, Homewood Suites, and 82 I.
Also unveiled was a spiffy new promotional video for the neighborhood, which I encourage all residents to watch mainly to see if you are in it anywhere (UPDATED with the link).
The featured speaker was Andrew Altman, who helped spearhead the Anacostia Waterfront Initiative during the Williams administration, then became the first chief executive of the Anacostia Waterfront Corporation before moving on to jobs that including helping London plan for the future of its Olympic Park and other sites after the 2012 summer games. A quick characterization of one aspect of speech--which included visuals of a lot of watercolor renderings and photos that took me down memory lane--could be something along the lines of "Wow, all this stuff we planned is actually happening!"
I took the opportunity of a visit to the ballpark to get a few photos, including one that may address the question many people have had: will any of the rooms at the new Hampton Inn have views of the playing field? I'm still not sure if the angle will allow unobstructed views of anything other than the center of the infield, but it is at least visual confirmation that the skyline outside the ballpark has changed for the first time in a few years.
In other news, fences went up this week in front of the Center Field Gate, leading some to hope that perhaps the planned move of the team store to its new home inside the stadium and the arrival of a restaurant in the N Street space might be moving forward. But apparently the work (which I captured sneakily from above) is to move the entrance gates a few feet closer to N Street.
I also had to get a shot I shall call Monument Valley in Winter, plus a decent view of the No Longer Spooky Parcel A at 1st and N. Forest City says that the parking lot planned for the near portion of the lot should arrive in late spring, with the sidewalks, grassy areas, and Trapeze School space coming later in 2015.
Comments (22)
More posts: Capitol Riverfront BID, Development News
 

I'm trying a visual approach to rounding up the goings-on in 2014 (see my 2014 Year in Review: Restaurants and Retail post as well), but I'm not sure quite how to replicate it when it comes to the mammoth rundown of everything that has happened from a development standpoint this year in Near Southeast/Capitol Riverfront/Navy Yard Territory/Near Capitol Ballpark River Yards.
But I'm giving it a shot, and at least you can quickly see the current state of all of them. Click to go to the project pages.
Completed/All-But Completed
Vertical (or About to Be)
Just Getting Underway
And we should also use this space to bid a final farewell to Spooky Building 213, which came down (sloooooowly) to make way for Forest City's "Parcel A" plans:
What big buildings are looking to be starting in 2015? More residential at New Jersey and I, a Homewood Suites hotel at Half and M, hotel/residential/retail on 1st Street (and maybe its office component, too). Late in the year, there could perhaps be the start of the first condo project at the Yards and a movie theater. And who knows what else.....
Comments (2)
More posts: Development News
 

Cleaning out the tidbit hopper with some new and not-quite-so-new items of note. I imagine posting will be light in the next few days, but you never know.
And so a Happy Holidays to all, from the entire staff of JDLand.com! Including from George, pictured at right.
* MOVIE THEATER LATEST: I mentioned this on Twitter last week, and appended it to my post on the subject, but I've heard kvetching from certain quarters that I did not specifically post anew that last week the DC Council passed the emergency versions of bills that among other things declare portions of the DC Water site at 1st and O as "surplus." This will allow the process of Forest City developing its movie theater there to move forward another step.
* VAN NESS KINDERGARTEN: I have been embarrassingly slow to report that earlier this month DCPS made known its decision that Van Ness Elementary will open next year with two kindergarten classes (in addition to PK-3 and PK-4). There will be 15 out-of-bounds spaces in these classes. The school system also released this FAQ about Van Ness's opening if you are just catching up.
* 100 M STREET SOLD: GlobeSt.com reports that Lionstone Investments and Hermes Real Estate have purchased the 100 M Street SE office building, with a source "pinpointing the purchase price at $78.9 million, or $324 per square foot." The building originally went up for sale back in 2012. This is the Gordon Biersch building, for those of you who don't look at address signs.
* METRO BALLGAME USE: WMATA's "PlanItMetro" blog took a deep dive into ridership patterns on Nationals game days at the Navy Yard-Ballpark and Capitol South stations. "Carrying an average of 11,000 riders to every Nationals home game, Metrorail maintained a 34% mode share to Nationals park in the 2014 season." There's also a good discussion of what the numbers may mean in the comments of this Greater Greater Washington post (along with chit-chat about the new Southeast Blvd.).
 
331 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.