Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Development News
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


331 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category

It was on March 5 that a large number of Very Important Persons gathered at 601 L St. SE to ceremonially break ground on the Lofts at Capitol Quarter, the 195-unit mixed-income apartment building that's the next step in the redevelopment of Capper/Carrollsburg. It's not unusual that there's a bit of a lag between the celebration and the actual start of work, but I admit my toes were starting to tap a bit as to when the real digging would begin.
And, lo and behold, this week the heavy machinery arrived, the northern half of Nats Lot W is roped off, and I witnessed with my very own eyes the breaking of ground. And there is plenty of ground to break:
PS: If folks have a minute and want to peek at the beta version of my Lofts at Capitol Quarter page, and report whether your browser freaks out--or if it doesn't--that'd be keen. (This includes mobile access.)
Comments (5)
More posts: Capper, Development News, The Bixby
 

Even readers without untold millions available to invest might be interested to see Grosvenor's recently released solicitation for a joint venture partner to help fund the development of its portion of Ballpark Square, on 1st Street just north of Nationals Park.
Grosvenor's part of the project includes a 325-unit apartment building, a 170-room hotel by an as-yet-unnamed operator, and 22,000 square feet of retail, with some of the retail in a planned two-story building at the corner of 1st and N. (Skanska is developing 99 M, the office building at the north end of Ballpark Square; the under-construction L-shaped Hampton Inn toward the south end of the block is a separate development.)
There's a colorful brochure with highlights and renderings of the "shovel-ready" project (I especially like the fake "McCaffery's Irish Pub"), along with the basic information page, which has a gallery with a few not-quite-high-res renderings of the buildings' interiors. There's also the details on the amenities, which will include "a 5,000 sf fitness center, indoor/outdoor clubroom, multi-level rooftop amenity space with two pools, grilling stations, stadium seating and a dog run."
The documents say that Grosvenor is expecting to start construction this summer, which tracks with what I heard when doing my shoeleather parking lot reporting a few weeks ago.
Grosvenor also now has a page about the project on its own web site.
Let me look in my sofa cushions....
Comments (9)
More posts: Development News, F1rst Residential/Hotel
 

Forest City Washington, desiring to begin development on the western portion of the Yards, is requesting a change to the Southeast Federal Center Overlay that would "align the height and density of any residential development in the Yards West with similar residential density to the west in the CG/CR Overlay and the south in the DC Water Sites PUD."
(And yes, this "Yards West" thing is new, but it does make some sense, given how the properties along 1st Street are mostly separated from the heart of the Yards between 3rd and 4th.)
As shown on the graphic Forest City provided to the Zoning Commission, the four parcels along N Street just east of 1st dubbed F, G, H, and I currently have a maximum allowed height of 110 feet, while to the north, south, and west there's a 130-foot maximum. (There's also a density difference that caps Yards residential development at 6.0 FAR versus 7.0-8.2 in the Capitol Gateway (CG) Overlay.)
This means that the SEFC Overlay permits less height and density than on the surrounding properties because, Forest City says, "no one fully anticipated the success of the tremendous public and private investment that is transforming the area."
Further proposed text amendments would "require Zoning Commission design review for any property utilizing bonus height and density for residential use" and would "authorize deviations from the ground-floor preferred use requirements, only after approval from the Zoning Commission."
During the zoning hearings a few weeks back to allow some changes to the NGA building site (known as Parcels A, F, and G, but which for now I just call Parcel A because I'm lazy), it was mentioned that Forest City was in the process of hiring an architect to design a residential building on Parcel H, which is on the southeast corner of 1st and N, with hopes of beginning development in 2015. Though I'm guessing they'll want to find out whether they can build to 130 feet instead of 110 before finalizing that design.
More as it develops.
Comments (2)
More posts: Development News, The Yards, Parcel A/Yards, Yards/Parcel H, zoning
 

WBJ reports today that three developers have submitted proposals to WMATA for projects on what's known as the Navy Yard Chiller Plant site, on the southwest corner of Half and L, SE.
Sayeth Michael Neibauer: "Akridge wants to build office there. Trammell Crow has bid to construct a residential building, as has a joint venture of MRP Realty and CAS Riegler. All three buildings feature ground floor retail."
Apparently the next step will be public forums "to gauge community interest" in the proposals, and WBJ says that Metro is looking to make selections as soon as mid-summer.
This is not the first time that WMATA has looked to redevelop this 14,000-sq-ft parcel, but a two-year negotiation with Donatelli broke off in 2010 when the developer pulled the plug on a planned 84-unit condo building, saying that the neighborhood was "getting saturated" with residential and that "it didn't look like condominiums were a viable alternative."
WMATA has been looking to get this lot developed since 2006, and you can relive all the twists and turns through my many posts on the subject.
Most likely any developer chosen would buy the 7,700-sq-ft lot with the two-story building next door (which has a big For Sale sign draped on its western side) to expand the site. (That building has quite a history, for those who weren't around for my post on it back in 2010.)
Comments (9)
More posts: Chiller Site/WMATA, Development News, square 698
 

A clearly happy and relieved group of city officials, developers, and residents gathered this morning on the parking lot at 7th and L, SE, to ceremonially break ground on the Lofts at Capitol Quarter, the 195-unit mixed-income apartment building that marks the latest phase in the redevelopment of the Capper/Carrollsburg public housing project.
Mayor Vince Gray, DC Housing Authority director Adrianne Todman, Ward 6 council member Tommy Wells, and other speakers all discussed the importance of making sure that residents are not priced out of the District, focusing on the 39 units of public housing that will be included in this project. When this building is completed, DCHA will have replaced 61 percent of Capper's original 707 units of public housing.
A lot of cooks were in the Lofts's $42 million financial kitchen, since DCHA did not use any of the Capper Hope VI funds to get the project underway. Instead, DCHA is acting as a first-time co-developer alongside Urban Atlantic and Forest City Washington, apparently crafting a "unique and complex legal and financial structure" that involves low income tax credits, DC Housing Finance Agency debt purchased by Citi Community Capital, and a short-term loan made by Industrial Bank.
The building is expected to be completed by 2015. You can read more about it here, and on my project page.
And because I'm a sucker for photos of dirt being flung into the air, here's a gallery of images from the event, which included not only the usual lineup of officials but also former and current Capper residents.
As for when "real" groundbreaking will begin, let's just say Any Minute Now. (And Nats fans and commuters should be prepared that Lot W will be cut pretty much in half by this development.)
 

It's getting hard to keep track of all of the projects in the ground around the neighborhood, and now another one is about to be added to the list: the 195-unit mixed-income apartment building christened the Lofts at Capitol Quarter is having a ceremonial groundbreaking on March 5 at 10 am, with the mayor, Tommy Wells, and other luminaries expected to be in attendance.
This project, on the south side of L Street SE between 5th and 7th, is on the site of the old Capper Seniors building, and will displace the northern half of Nats Economy Lot W. It faces the Marine Bachelor Enlisted Quarters building that opened at 7th and L in 2004.
Of course, since this is a ceremonial event, we'll have to see when actual moving of dirt--other than by shovel-wielding VIPs--begins. But financing is in place, permits are approved, and the DC Housing Authority appears raring to go to get this project underway.
When completed, the building will be run by Forest City's residential management arm, and will have a fitness room, roof decks, interior courtyards, and meeting space. It's expected to take about 20 months to complete once construction begins.
This is the third apartment building to rise up as part of the Hope VI redevelopment of the Capper/Carrollsburg housing project, and the first to be mixed income, with at least 38 affordable units to be included.
The "Capitol Quarter" moniker comes from the rows of new townhouses built a few blocks away as part of the Capper redevelopment. In the original plans for Capper's re-do, this site (known as Square 882) was going to be townhouses as well, but was switched to an apartment building in 2009. The south half of the block, facing M Street and the Navy Yard, may someday be the 600 M Street office development, but that does not appear to be happening anytime soon.
 

According to the Washington Business Journal, the empty lot on the northeast corner of Half and M is now slated to become a 195-room Homewood Suites Hotel, with a deal having been reached between Hilton and the development group that bought the lot last year.
Back in the pre-ballpark pre-land rush days, a Sunoco station sat on this lot, known as 50 M Street, until 2006, and then the site was bought by Monument Realty in 2007.
The WBJ article says construction could begin on the 11-story building, one block north of Nationals Park, late this year or in 2015, with an opening in 2016. The hotel will have a mix of studio, one- and two-bedroom suites, and about 5,000 square feet of ground-floor retail, which will come in handy with its location directly across the street from the west entrance to the Navy Yard-Ballpark Metro station.
This hotel would join the Courtyard by Marriott at New Jersey and L and the just-getting-started Hampton Inn at 1st and N that is expected to open next year. There is also expected to be another hotel as part of the Ballpark Square development just a few feet north of the Hampton Inn on 1st Street south of M.
Note that this deal does not affect the red brick warehouse just to the north of the empty 50 M lot--that building is owned by the feds and is being salivated over by residents who dream of creating the Half Street Market there.
Comments (6)
More posts: Homewood Suites, Development News, homewood, hotel
 

The Washington Business Journal is reporting that DC Water has rejected the new spot proferred by the city for the relocation of some of the agency's operations at 1st and O SE, stalling forward progress on Forest City's plans for a 16-screen movie theater along with residential and retail offerings just east of Nationals Park.
Apparently additional relocation sites have been offered by the city to DC Water and are being reviewed, but the article says they have not been named. There's no real explanation of why the agency rejected the site east of 11th Street SE south of Water Street, except for this quote from Deputy Mayor Victor Hoskins: "They [DC Water] have criteria, and what you think works doesn't necessarily work. [...] We were very clear that the site worked, but they were clear that it did not work. They had the option to say no."
In addition to the movie theater, expected to be operated by Showcase Icon, Forest City has plans for 600 residential units in two buildings, along with around 50,000 square feet of retail on about five acres of land near (but not including) the historic Main Pumping Station between N Place SE and the Anacostia River.
While this relocation is getting sorted out, you can read my past posts about the DC Water site project, and check out the latest renderings of the theater and buildings planned for the site, some of which came along during my hiatus and so haven't officially been mentioned on the blog. Until now!
UPDATE, 2/20: There's now a follow-up WBJ story with DC Water's side of the story, saying that the 11th Street site was too small, too narrow, too difficult to navigate, located in a flood plain, in a heavily contaminated Superfund site, and has "tremendous traffic challenges."
It does quote agency head George Hawkins as saying that DC Water is not trying to drag its feet: "We're engaged, we're analyzing sites as fast as we get them."
The article also mentions that if a solution isn't found soon, the DC council may want to reallocate the $15 million it has budgeted for the land acquisition of a new site. "And that could potentially set the Showplace icon theater and associated development back a number of years."
Comments (4)
More posts: Development News, DC Water (WASA), The Yards, The Yards at DC Water
 

A looming snowstorm will always divert my attention, but before the flakes fly, here's a few tidbits:
* I was not there, but the developers of the Florida Rock site apparently told Monday's ANC 6D meeting that they are looking at a June start of construction for the project's first phase, a 350-unit residential building. However, no building permit applications have been filed yet, with one reason being the need for some curb cut approvals, which the ANC voted to support. So, We Shall See.
* SWill reports that a developer is in the planning stages for a 260-unit apartment building on South Capitol Street across from Nationals Park, just north of the Camden building that opened last year. There are older rowhomes on the north end of the block, some or all of which could be incorporated into the project in some way. However, this is technically outside of my boundaries, so other than snapping photos of what will come, I'll be leaving this to Will to cover.
* I feel like I've already mentioned this, but in case I haven't, a raze permit has been filed for St. Matthew's Baptist Church on the southwest corner of New Jersey and L, to make way for Donohoe's 1111 New Jersey residential project. UPDATE: And commenter Alan below adds the tidbit that the church's message board out front now says "Looking for our perfect home."
* Washingtonian had very good things to say about Osteria Morini, while the Post's Tom Sietsema waxes saltily on Agua 301.
 

During Monday night's Zoning Commission hearing on allowing the move of the trapeze school from "Parcel O" at 4th and Tingey in the Yards to another space at New Jersey Avenue, Forest City's Ramsey Meiser revealed that the company is planning to sell a portion of Parcel O to allow for the development of a condo project there.
Meiser explained that while Forest City doesn't do condo development, "we want to have for-sale product at the Yards," hence the potential deal. The zoning filings say that "Parcel O will be developed in 2014/2015 and construction on Parcel O is expected to be completed by 2016/2017."
I've asked for further detail on this, which I may or may not get anytime soon, and I will update when I receive more.
Other tidbits that came out of the hearing:
* Forest City is in the process of hiring an architect to design a residential building for Parcel H, which is the western half of the parking lot on the southeast corner of 1st and N, directly across from Nationals Park and north of DC Water. There appears to be a desire to develop that site within the next couple of years.
* The company expects the demolition of the NGA building at 1st and M to take approximately six months, and that the reconfiguration of the block to include the trapeze school, a new park on the north end, and a slightly shrunken parking lot would be completed by the end of 2014.
* The new park, which with the rest of the block would be a temporary use until office buildings are constructed, has enough open green space that Forest City expects to work with the BID to activate it for some sorts of smaller sports activities (bocce and kickball yes, softball probably not).
Oh, and the commission voted 5-0 to approve the special exceptions to allow trapeze school and parking lot on the south end of the 1st and M block, on the sites technically known as Parcels F and G. (The park would be on Parcel A.) There was some back-and-forth about the need for trees on the site--they weren't included in the plans because Forest City expects buildings to eventually replace the temporary uses, but Forest City has agreed to work with DDOT and the Office of Planning on the issue, and the zoning commissioners did not feel it warranted delaying their vote.
UPDATE: In my haste to get this posted, I should have mentioned that the original Yards plans did include a condo project--a plan to have PN Hoffman convert Building 202, the red brick building at 5th and M east of what's now Twelve12. But that project has seemed to stall.
 
331 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.