Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Development News
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


331 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category

It's getting hard to keep track of all of the projects in the ground around the neighborhood, and now another one is about to be added to the list: the 195-unit mixed-income apartment building christened the Lofts at Capitol Quarter is having a ceremonial groundbreaking on March 5 at 10 am, with the mayor, Tommy Wells, and other luminaries expected to be in attendance.
This project, on the south side of L Street SE between 5th and 7th, is on the site of the old Capper Seniors building, and will displace the northern half of Nats Economy Lot W. It faces the Marine Bachelor Enlisted Quarters building that opened at 7th and L in 2004.
Of course, since this is a ceremonial event, we'll have to see when actual moving of dirt--other than by shovel-wielding VIPs--begins. But financing is in place, permits are approved, and the DC Housing Authority appears raring to go to get this project underway.
When completed, the building will be run by Forest City's residential management arm, and will have a fitness room, roof decks, interior courtyards, and meeting space. It's expected to take about 20 months to complete once construction begins.
This is the third apartment building to rise up as part of the Hope VI redevelopment of the Capper/Carrollsburg housing project, and the first to be mixed income, with at least 38 affordable units to be included.
The "Capitol Quarter" moniker comes from the rows of new townhouses built a few blocks away as part of the Capper redevelopment. In the original plans for Capper's re-do, this site (known as Square 882) was going to be townhouses as well, but was switched to an apartment building in 2009. The south half of the block, facing M Street and the Navy Yard, may someday be the 600 M Street office development, but that does not appear to be happening anytime soon.
 

According to the Washington Business Journal, the empty lot on the northeast corner of Half and M is now slated to become a 195-room Homewood Suites Hotel, with a deal having been reached between Hilton and the development group that bought the lot last year.
Back in the pre-ballpark pre-land rush days, a Sunoco station sat on this lot, known as 50 M Street, until 2006, and then the site was bought by Monument Realty in 2007.
The WBJ article says construction could begin on the 11-story building, one block north of Nationals Park, late this year or in 2015, with an opening in 2016. The hotel will have a mix of studio, one- and two-bedroom suites, and about 5,000 square feet of ground-floor retail, which will come in handy with its location directly across the street from the west entrance to the Navy Yard-Ballpark Metro station.
This hotel would join the Courtyard by Marriott at New Jersey and L and the just-getting-started Hampton Inn at 1st and N that is expected to open next year. There is also expected to be another hotel as part of the Ballpark Square development just a few feet north of the Hampton Inn on 1st Street south of M.
Note that this deal does not affect the red brick warehouse just to the north of the empty 50 M lot--that building is owned by the feds and is being salivated over by residents who dream of creating the Half Street Market there.
Comments (6)
More posts: Homewood Suites, Development News, homewood, hotel
 

The Washington Business Journal is reporting that DC Water has rejected the new spot proferred by the city for the relocation of some of the agency's operations at 1st and O SE, stalling forward progress on Forest City's plans for a 16-screen movie theater along with residential and retail offerings just east of Nationals Park.
Apparently additional relocation sites have been offered by the city to DC Water and are being reviewed, but the article says they have not been named. There's no real explanation of why the agency rejected the site east of 11th Street SE south of Water Street, except for this quote from Deputy Mayor Victor Hoskins: "They [DC Water] have criteria, and what you think works doesn't necessarily work. [...] We were very clear that the site worked, but they were clear that it did not work. They had the option to say no."
In addition to the movie theater, expected to be operated by Showcase Icon, Forest City has plans for 600 residential units in two buildings, along with around 50,000 square feet of retail on about five acres of land near (but not including) the historic Main Pumping Station between N Place SE and the Anacostia River.
While this relocation is getting sorted out, you can read my past posts about the DC Water site project, and check out the latest renderings of the theater and buildings planned for the site, some of which came along during my hiatus and so haven't officially been mentioned on the blog. Until now!
UPDATE, 2/20: There's now a follow-up WBJ story with DC Water's side of the story, saying that the 11th Street site was too small, too narrow, too difficult to navigate, located in a flood plain, in a heavily contaminated Superfund site, and has "tremendous traffic challenges."
It does quote agency head George Hawkins as saying that DC Water is not trying to drag its feet: "We're engaged, we're analyzing sites as fast as we get them."
The article also mentions that if a solution isn't found soon, the DC council may want to reallocate the $15 million it has budgeted for the land acquisition of a new site. "And that could potentially set the Showplace icon theater and associated development back a number of years."
Comments (4)
More posts: Development News, DC Water (WASA), The Yards, The Yards at DC Water
 

A looming snowstorm will always divert my attention, but before the flakes fly, here's a few tidbits:
* I was not there, but the developers of the Florida Rock site apparently told Monday's ANC 6D meeting that they are looking at a June start of construction for the project's first phase, a 350-unit residential building. However, no building permit applications have been filed yet, with one reason being the need for some curb cut approvals, which the ANC voted to support. So, We Shall See.
* SWill reports that a developer is in the planning stages for a 260-unit apartment building on South Capitol Street across from Nationals Park, just north of the Camden building that opened last year. There are older rowhomes on the north end of the block, some or all of which could be incorporated into the project in some way. However, this is technically outside of my boundaries, so other than snapping photos of what will come, I'll be leaving this to Will to cover.
* I feel like I've already mentioned this, but in case I haven't, a raze permit has been filed for St. Matthew's Baptist Church on the southwest corner of New Jersey and L, to make way for Donohoe's 1111 New Jersey residential project. UPDATE: And commenter Alan below adds the tidbit that the church's message board out front now says "Looking for our perfect home."
* Washingtonian had very good things to say about Osteria Morini, while the Post's Tom Sietsema waxes saltily on Agua 301.
 

During Monday night's Zoning Commission hearing on allowing the move of the trapeze school from "Parcel O" at 4th and Tingey in the Yards to another space at New Jersey Avenue, Forest City's Ramsey Meiser revealed that the company is planning to sell a portion of Parcel O to allow for the development of a condo project there.
Meiser explained that while Forest City doesn't do condo development, "we want to have for-sale product at the Yards," hence the potential deal. The zoning filings say that "Parcel O will be developed in 2014/2015 and construction on Parcel O is expected to be completed by 2016/2017."
I've asked for further detail on this, which I may or may not get anytime soon, and I will update when I receive more.
Other tidbits that came out of the hearing:
* Forest City is in the process of hiring an architect to design a residential building for Parcel H, which is the western half of the parking lot on the southeast corner of 1st and N, directly across from Nationals Park and north of DC Water. There appears to be a desire to develop that site within the next couple of years.
* The company expects the demolition of the NGA building at 1st and M to take approximately six months, and that the reconfiguration of the block to include the trapeze school, a new park on the north end, and a slightly shrunken parking lot would be completed by the end of 2014.
* The new park, which with the rest of the block would be a temporary use until office buildings are constructed, has enough open green space that Forest City expects to work with the BID to activate it for some sorts of smaller sports activities (bocce and kickball yes, softball probably not).
Oh, and the commission voted 5-0 to approve the special exceptions to allow trapeze school and parking lot on the south end of the 1st and M block, on the sites technically known as Parcels F and G. (The park would be on Parcel A.) There was some back-and-forth about the need for trees on the site--they weren't included in the plans because Forest City expects buildings to eventually replace the temporary uses, but Forest City has agreed to work with DDOT and the Office of Planning on the issue, and the zoning commissioners did not feel it warranted delaying their vote.
UPDATE: In my haste to get this posted, I should have mentioned that the original Yards plans did include a condo project--a plan to have PN Hoffman convert Building 202, the red brick building at 5th and M east of what's now Twelve12. But that project has seemed to stall.
 

UPDATE: I tried to hint with my wording down below, but the cat is now out of the bag, as it has been announced that the National Labor Relations Board will be taking 143,000 square feet of space at 1015 Half Street.
Original post: I don't have official confirmation, so the best I can do is be all cagey and say that word is filtering out that 1015 Half Street may finally be about to get a tenant for some of its 410,000 square feet, six years after construction started and nearly three years after it was finished. If this pans out, the newcomers wouldn't arrive before next year, since of course there will first be the inevitable labor to build out the tenant space.
I've also got a bit of non-Near Southeast content to pass along, as the Post's Capital Business section is featuring "A Walking Tour in Pictures: The Final Days of White Flint Mall," a gallery of photos I took as the go-to shopping destination of my Montgomery County teenage years prepares to close to make way for a 5 million-square-foot mixed-use development. (And because we all know I can't bear to be shackled by space constraints, here's some additional shots that didn't make the initial cut.)
This is the second one of these features I've done with Jonathan O'Connell and CapBiz, after my Buzzard Point photo tour last fall, and there will probably be more to come from other soon-to-change areas around the Metro area.
Comments (14)
More posts: 1015 Half, Development News
 

With newish Sigal Construction signs now up on the fences on 1st Street just north of Nats Park acting as confirmation, WBJ reports today that construction is going to start "any day now" on the 168-room Hampton Inn and Suites that was announced a little while back. A shoring/sheeting permit for a portion of the site was approved in late December, though the building permit itself is still in process.
The article says that construction is expected to be completed in the second quarter of 2015--perhaps the lack of underground parking for the project and the shoring permit only for one of the five lots the hotel will be situated on means that there won't be as much digging as one would normally see for a 13-story project, which would speed up the timeline.
This hotel, being developed by the Buccini/Pollin Group, is an L-shaped building that will be wrapping around a separate two-story retail project by Grosvenor right on the northwest corner of 1st and N. And Grosvenor has its own hotel (and a residential building) planned on the same block, just to the north of the Hampton Inn, though no start date has been announced.
The start of this project may be taking some parking away from the far southern end of Nats Lot F, though I have to admit that I'm not 100 percent sure that this portion of the lot was used last season. Rocklands BBQ had set up a food truck during games on the corner lot (where the retail building will go), but I don't remember if more fences went up a little north of that lot or not. Perhaps someone who parks in Lot F as a commuter can help with the timeline.
Confused? Don't worry, it'll all become clear, but perhaps checking out my Square 701 page--which covers the Hampton Inn, and the Grosvenor/Skanska Ballpark Square project--will help.
This is the first non-residential new construction building in the neighborhood since the 1015 Half Street office building was completed in 2011. And it is the second hotel in Near Southeast, joining the Courtyard by Marriott at New Jersey and L that opened in 2006.
Comments (1)
More posts: Development News, hamptoninn, hotel, lhotel
 

* TEETER AND VIDA: At last week's BID meeting, Michael Stevens said that Forest City would soon be "handing the keys" to Harris Teeter to begin their build out at the north end of Twelve12. And apparently the Vida Fitness space on the south end of the block will be turned over very soon to its tenants as well. Vida is looking at a summer opening, and Teeter in the fall. And leasing for the apartments themselves should start this spring.
* WHOLE FOODS: Meanwhile, at that other grocery store/residential site, I'm told that some initial infrastructure work is already underway (probably hard to really differentiate it with all the work going on at the Park Chelsea next door). The plan is still for 800 New Jersey/Whole Foods to officially get underway this spring, probably in March (which so often is the month that a developer's thoughts turn to excavation).
* A VIEW OF THE PARK: And, speaking of the Park Chelsea, I can now offer this high-speed photo of the construction from a different vantage point from usual (and no, I didn't walk up onto the freeway):
Of course, this view of the Park Chelsea will only last until 800 New Jersey starts sprouting in the spot in between this construction and the freeway.
* FREEWAY VISTAS: It's been a while since I've updated my skyline-from-the-freeway images, but I did get them this weekend. I would suggest taking a look at the whole lot, but this is probably the best comparison, of January 2005 to the present:
At center of the new image is the River Parc residential building speeding along next to Velocity. But these two don't even tell the entire story of the eight years that passed between them--check out the complete lineup of images from this angle to see the other buildings that went up since 2005 but are now obscured.
But really, check out all the before-and-afters I've taken from the freeway at South Capitol over the past 14 years, and click on the See All Photos of This Angle icons to see the progressions.
* THE CRAZY AUNT AND HER SLIDES: Sunday was the 11th anniversary of that fateful drive around the neighborhood that resulted in some photos on my web site, and then yadda yadda, here we are. So of course I have to point you to those pictures. (Though yes, technically I took my first photos of the area in fall 2000, but those were on bad film and I didn't even rediscover them until 2004.)
***UPDATE***: Adding on to this post with the news that Bluejacket and its much-touted head brewer Megan Parisi have parted ways, according to the Post.
 

The neighborhood appears to have (yet) another residential project likely to get underway in 2014, as the DC Housing Authority has finally gotten the financing together for the long-planned 195-unit mixed-income residential building at 7th and L SE, on the site of the old Capper Seniors building.
The building permit for the project was approved a few months ago, and with money now in place, it's expected that dirt should begin to move within a few months ("expected" as always being the key word). This building, which will face the Marine Bachelor Enlisted Quarters across L, will be all rentals, and will have 39 affordable housing units alongside the market-rate offerings.
Documents filed with the Recorder of Deeds refer to the project as "The Lofts at Capitol Quarter." The building will be run by Forest City's residential management arm, and will have a fitness room, roof decks, interior courtyards, and meeting space. It's expected to take about 20 months to complete once construction begins.
Nats fans may be a bit chagrined by this news, though, since the new building will take out a chunk of Economy Lot W, cutting the number of spaces down to 186 once the lot is reconfigured (hopefully by Opening Day).
Note that this building is only on the north side of the block, which is why Lot W isn't disappearing completely--yet. The south side is slated to someday be a sizeable office building, though no start date appears to be anywhere on the boards for that.
This will be the first mixed-income apartment building to come out of the Capper Hope VI redevelopment; the first two apartment buildings completed--Capper Seniors and 400 M--are both all affordable-housing units. Four (or maybe five) additional residential buildings, with another 900-plus mixed-income units including about 285 affordable units, are still to be built before Capper reaches full build-out of its residential component.
This project is now on the 2014 docket along with Forest City's Yards/Parcel N, WC Smith's 800 New Jersey (aka The Whole Foods Building), and Donohoe's 1111 New Jersey, if these developers can make it past my jaded skepticism about announced start dates (well earned during the Lean Years of 2008-2012) and start building.
Already under construction and expected to open in the next year or so are rental projects Twelve12, River Parc, and the Park Chelsea.
And, when the Lofts at Capitol Quarter are completed, the south side of L Street between 5th and 7th will look a little different from what was there before:
 

Trying to start 2014 off right--even if it means posting a few things I didn't quite get to in 2013.
* ANC: Ed Kaminski has resigned as Advisory Neighborhood Commissioner for 6D02, the area basically from the ballpark northward to the south side of I Street. A special election will be in the offing before too long.
* METRO: Via CapBiz, Metro has put out "development concepts" for the five station sites it is touting to developers. However, when it came to the Navy Yard/Chiller Plant site on the southwest corner of Half and L, there were no pretty drawings, just a suggestion to acquire the privately owned lot next door, and that maybe a project with ground-floor retail would be nice, too. If you want to know the increasingly long history of WMATA's attempts to find a developer for this land (and get a new chiller plant as part of the deal), here's some reading for you.
* BALLPARK SQUARE: New fence signage along 1st Street north of Nats Park touting the Ballpark Square residential/hotel/retail development, "delivering in late 2015." There do appear to be building permits for the residential and hotel parts of the development currently working through the pipeline, though there is No Time To Lose to hit that "late 2015" date (and co-developer McCaffery hedges a bit with "early 2016"). I will note, though, that there is something kind of missing in the rendering shown on the fence signage. (Hint: It's L-shaped, and is by a different developer, and is supposed to start soon too.)
* WAYBACK: The Hill is Home's "Lost Capitol Hill" series looks at the Anacostia Engine House, located at 8th and Virginia for most of the years from 1839 until the glorious arrival of the Southeast Freeway in the 1960s.
* NO, REALLY: My latest excuse explanation for my decreased blogging output. (Though if you follow JDLand on Facebook or Twitter, you already know this.)
 
331 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.