Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Development News
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


331 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category

In a big milestone for the continued transformation of the old walled-off Southeast Federal Center into the huge mixed-use development known as The Yards, pre-leasing has begun for the Foundry Lofts, which developer Forest City has been transforming from its previous incarnation as the historic Pattern Joiner Shop building in Navy Yard shipbuilding days into a 170-unit apartment building. (Pre-leasing was officially supposed to begin today, but with the leasing trailer on site and open to visitors for the past week or so, interest from potential residents overtook the planned launch and leasings actually have already started.)
The units will have 12-14' ceilings, exposed brick, and concrete beams (befitting the term "loft"), along with the hardwood floors, stainless steel appliances, and granite countertops that would be expected in this sort of building. Rents will start at $2,000 a month, going up to $3,100 a month for one of the 33 two-level penthouse apartments in the new floors added to the top of the original building. (There are also a small number of affordable units available as well, though I don't have details on those.) Forest City expects move-ins to begin in October.
And, as previously announced, a Potbelly Sandwich Works and Kruba Thai and Sushi will occupy ground-floor retail space early next year. Plus it's pet-friendly, too!
With its location on Tingey Street SE, immediately north of the Yards Park (and surrounded by parking lots used by fans heading to Nationals Park), the Foundry Lofts building is probably already familiar to many people who've come to Near Southeast over the past few years. It's the first residential component of the huge Yards redevelopment to be coming to completion, and will be the first multiunit residential building to open in the neighborhood since 2009. The renovation of what used to be known as Building 160 began in 2008, but was halted for well over a year at the height of The Economic Difficulties before work began again in August of 2010.
There is also plenty of construction activity right around the Foundry Lofts that will bring additional offerings to the Yards over the next two years. Just to the north, work has begun on the renovation of the Boilermaker Shops into a retail pavilion (to house a number of restaurants when it opens later in 2012), and soon work should get underway a block to the east on the second Yards residential project, the apartment building at 401 M Street that will have a Harris Teeter in the ground floor. Plus, construction on the Lumber Shed building in the Yards Park to make it a retail pavilion (and home to Forest City's offices, temporarily) should begin later this year.
For more information, you can visit the leasing trailer now open from 9 am to 6 pm at 3rd and Tingey, SE, or go to FoundryLoftsDC.com, which hopefully will have some more complete information soon. (There's also their Facebook page, or Twitter feed, if you're feeling particularly social media-y about it all.) I haven't made it to the leasing office yet, having been gloriously unplugged in Wyoming for most of early August, but I hope to get there this week. And my Foundry Lofts page gives additional before-and-during photos of the construction and a few additional renderings, including one of the building's interior courtyard.
Comments (5)
More posts: Development News, Foundry Lofts/Yards, Retail, The Yards
 

In a wonderfully short hearing on Thursday night, the Zoning Commission voted 5-0 to approve Forest City Washington's request for an amendment to the current Southeast Federal Center Zoning Overlay to allow the company to temporarily move its offices to the second floor of the historic Lumber Shed building at the Yards Park.
The company made the request because, while there has been "great interest" from potential retail tenants for the first floor of the building, the second floor has not as yet been as enticing, and filling the ground-floor spaces alone is not enough to get construction financing secured. Because Forest City is "anxious" to get the building started, their move to occupy the second floor can settle the financing issues and finalize deals with interested tenants, which means that construction on the 34,000-square-foot building could begin this year and be open by early 2013.
There had been some concerns at the setdown hearing back in April about the "temporary" request being for a period of 20 years, but Forest City's representatives emphasized (as they also did to the ANC in April) that their intent is to be in the Lumber Shed only until there is office space elsewhere in the Yards to which they can move. Alex Nyhan of Forest City explained that getting retail uses into the second floor is currently "challenging" because the building is "by itself" at the Yards (without much built out around it), which is exacerbated by the fact that it's a somewhat seasonal destination. But Forest City feels that once the other projects in the first phases of the Yards are built out, there will be a demand for the second floor, plus "the onus is on us" to make the Yards into a location where second-floor retail not only at the Lumber Shed but in other Yards buildings is attractive to tenants.
The discussion seemed to satisfy the zoning commissioners, and with the Office of Planning in support of the change and no voices in opposition, the unanimous vote came quickly.
Nyhan also gave the commission a quick update on the status of the other first-phase Yards projects, to help illustrate that "after many years of planning" things are starting to move:
* The Foundry Lofts 170-unit apartment building will begin pre-leasing in August, and will open in October;
* The Boilermaker Shops retail space has announced five restaurant tenants, and will begin construction this month, opening in Fall 2012;
* And 401 M Street, home to a planned Harris Teeter and 200ish-unit apartment building, is expected to start construction this fall.
If you want to give up 30 minutes of your time to check out the proceedings yourself, the hearing should be available for on-demand viewing sometime on Friday. My post from the ANC deliberations on the request also has more information.
 

Deeds have been recorded this afternoon indicating that the Ruben Companies has bought the two empty Exxon lots on South Capitol Street, at I Street SE and K Street SW.
The purchase of the 35,000-square-foot lot at South Capitol and I gives Ruben control of the entire block known as Square 697N; the company picked up the other 47,000 sq ft of the block back in 2009 after developer JPI defaulted on its loan for what was then the site of a Wendy's restaurant.
The other lot Ruben bought from Exxon, just south of the Capitol Skyline Hotel at South Capitol and K streets SW, is about 31,000 square feet and also gives the company control of that entire block, known as Square 648, after Ruben bought the other two lots in 2005 and 2007.
This now makes four sizeable sites that Ruben owns on this three-block stretch of South Capitol Street, since the company also owns 1100 South Capitol St. SE and 1101 South Capitol St. SW across the street, both of which are being marketed as office buildings.
The South Capitol and I Exxon closed down back in 2006, when the station's operator pleaded guilty to fradulently double-billing government contractors more than $120,000.
I don't know any more specifics about the sales at this point, and it's unlikely any buildings will be immediately sprouting on either site. But it is yet another bit of commercial development news that would seem to indicate that the worst of the downswing is past.
 

I wandered down to Nationals Park last night to take in the atmosphere of not only the four new eateries, but also the return of Ryan Zimmerman. It was a healthy crowd (26,700+), and only about half of them seemed to be in line at Shake Shack and the other new food concessions (though by later in the game, the non-Shake Shack options had no lines).
I took another slew of photos (since the original batch from Monday's preview event proved to be pretty popular) mainly trying to get shots of these new "iconic" ballpark features from various angles, along with a few other shots of interest. As you can see in the shot at right, you can look at Blue Smoke and Box Frites with the Yards Park "iconic" pedestrian bridge and Navy Yard riverwalk directly behind, or with an east-of-the-river vista. I also grabbed a view of the progress on the bridge between Diamond Teague Park and Yards Park, my first shots of Das Bullpen, and both the sunset and the moonrise. And they would have all been even better if I had brought the official JDLand DSLR camera and not my less-than-fabulous point-and-shoot. Browse the gallery, and then mock me for leaving in the top of the 7th inning.
Other recently tweeted tidbits:
* The Yards' new Facebook page now includes a 2 1/2-minute virtual tour of what the neighborhood will look like when it's all built out. To see what it looks like now (and what it looked like a few years back), wander through my Yards project page.
* On Sunday morning a group of volunteers descended on the empty lot just east of the Velocity condo building to turn it into a demonstration rain garden. It's a project of the DC chapter of the Surfrider Foundation, and is being funded by REI and the Cohen Companies (developers of the block), among others. They are having a meeting at Velocity on June 20 at 6 pm to discuss the project, and there will be another work day on the site on Saturday, June 25. The project's blog has photos and a lot of details; it's officially named the David Stemper Memorial Rain Garden, in honor of a Surfrider volunteer who passed away in 2010.
* The BID says that the next Truckeroo food truck festival at Half and M SE will be on Friday, July 15.
* Last week CSX sent a letter out to residents who live near Virginia Avenue introducing the plans to rehab the Virginia Avenue Tunnel. (It was probably quite useful for people who don't read JDLand!)
 

It's hard for me to believe that this week marks three years since the first Opening Day at Nationals Park, but time does march on. Wednesday evening's NatsFest followed by three games against the Braves (starting with Thursday's 1:05 pm season opener) will bring a lot of people back to Near Southeast for the first time since last summer.
If you're one of them, and you haven't diligently been reading my posts (gasp!), you might be interested in knowing what's been going on since the last time you ventured into this neck of the woods. Here's the big items:
Yards Park: In early September, the first phase of the six-acre Yards Park opened on the banks of the Anacostia, just two blocks east of the ballpark. It's a space unlike any in Washington, and is definitely worth a visit, perhaps even on your way to Saturday's afternoon game, since the park is holding a Family Fun Day that starts at 11 am. (Even if you don't make it to the park right away, you can easily see it from the ballpark's southeastern viewing platform.)
It will probably be a neat place to watch the Friday night post-game fireworks as well (UPDATE: waah! no fireworks this year!), a trip which will be made even easier when a floating bridge connecting Diamond Teague Park--just across Potomac Avenue from the First Base Gate--with the Yards Park is completed, perhaps by the end of the season.
Unfortunately, most people visiting the park in conjunction with a Nationals game won't get to walk along the river all the way to 11th Street: while the Navy Yard has announced that its stretch of the boardwalk is opening April 1, the initial hours will only be from 8 am to 5 pm Monday-Friday.
Foundry Lofts: Just to the north of the new park, work re-started last September on the stalled Foundry Lofts building at 3rd and Tingey, and it is expected to be completed this fall.
Bullpen: It may not be ready by Thursday, but the open-air bar and live music gathering place across N Street from the stadium known as the Bullpen is opening a gameday beer garden to the north of its current spot, on the corner of Half and M across from the west entrance to the Navy Yard Metro station. With close to 80 picnic tables, it will have a capacity of over 600 and will offer European beers, sausages and other like fare, and a quieter environment than the original Bullpen (which will be remaining open for this season as well). The name of the new spot? Das Bullpen. (Yes, that's the moniker I flippantly gave the project back when the news first broke, which the owners decided to go ahead and use. #winning!)
Capitol Quarter: If you park in lot T on 3rd Street, SE, you'll see new townhouses going up directly across the street as part of Capitol Quarter's second phase of construction.
200 I: Just to the north of lot T and right by the Southeast Freeway, you'll see the old Star/Post Plant at 225 Virginia Avenue in the process of losing its exterior "skin" as it moves toward becoming 200 I Street, a DC government office building that will be completed next spring.
Canal Park: Right in the middle of things, across from the Five Guys and Subway, you'll see construction at last underway on Canal Park, the stretch of 2nd between I and M that at one time was a schoolbus parking lot and which has been plain open space for the past two years. The park is expected to be open by spring of next year, and so during the next 12 months expect there to be almost no parking along 2nd; the eastern part of the street is closed altogether. Also, note that L Street is closed for this one block, so you can't use it to get from New Jersey to 3rd or vice versa.
Harry's: If your path to and from the ballpark includes a walk down New Jersey Avenue (perhaps from the Capitol South Metro station), and you find yourself in desperate need of adult beverages, Harry's Reserve has now opened on the southwest corner of New Jersey and I, in the ground floor of the 909 New Jersey apartment building.
Florida Rock: While it hasn't happened yet, plans are for the concrete plant just south of the ballpark to be razed sometime this year, bringing unobstructed views of the Anacostia River to the southeastern viewing platform and clearing the Florida Rock site until the proposed 1.1-million-square-foot RiverFront project can get some financing and get started.
Getting Here: I've got my Stadium Parking map ready to go for 2011, though I've made no additions or deletions on it yet for the new season. I'll wander around this weekend and see if any new lots have popped up or old ones have gone away, though first impressions are that there are no major changes, certainly not in terms of the official Nats lots. (If you see any new lots or old ones that have gone offline, let me know so I can update the map.)
But with this area being a multimodal paradise, your better bet is Metro, or the Circulator that runs from Union Station and Eastern Market, or even Capital Bikeshare, now that there's a station at 1st and N. UPDATE: Forgot to mention the water taxi running from Alexandria, and it's possible that the new American Water Taxi service may get started up soon.
Retail? Eats? Unfortunately, if you were expecting this post to include a litany of new food and retail offerings, you will be just as disappointed as the residents and officeworkers currently are with the continuing lack of options beyond Subway, Five Guys, Justin's Cafe, and Cornercopia. There could be at least two additions before the end of the season, however: another beer garden (separate from Das Bullpen) is under development at 8th and L, SE, and the old "Little Red Building" site at 2nd and L is on its way to becoming "Lot 38 Espresso." Neither project has an announced opening date.
There is also lots of under-the-radar chatter of various restaurateurs starting to look at the area (which I haven't bothered posting, because a) I don't do rumors and b) it shouldn't really be news that they're looking in such an underserved area). With the above projects underway, along with DDOT and the FAA soon moving into 55 M, 20 M now 97 percent leased, and 100 M off the DL thanks to its foreclosure sale, there is a definite shift in the economic winds, and it would not be surprising to get some announcement of some new retail before the end of this season.
For more information on what's changed and what might be changing, check out my 2011 State of the Hood. The BID also did a recent roundup of changes.
If you want to relive the glory days of the ballpark's construction, you can wander through all my exterior and interior photos from that heady time, along with my many photo galleries from ballpark-related events over the years, from the groundbreaking to the topping out to each Opening Day. You can also check out what that part of the neighborhood looked like before the stadium's arrival. (Yes, I'm wallowing in nostalgia. It was a fun time.)
(UPDATED headline, because I can't count.)
Comments (20)
 

Today the head of the National Community Church is announcing to his parishioners that a deal has been struck for NCC to buy the People's Church at 535 8th St. SE in the middle of Barracks Row.
With their home base at Ebenezers Coffee House near Union Station overflowing and any completed construction on their new Virginia Avenue footprint probably 3-4 years away, this gives the church an instant "phase 1" building with more than double the capacity of Ebenezers.
Mark Batterson tells me that the first service on 8th Street will be on Palm Sunday, April 17. They'll have one service a week there until the land deal is completed in early June, after which more services and events will be held at the new location, but they'll continue to meet at Ebenezers as well. In time, they are looking at converting the building back to its previous life as a movie theater: it opened as Meader's Theater in 1910, then became the New Academy Theatre before being converted to a church in the early 1960s. (If you've been inside the church, you certainly would recognize the seats and layout as vintage movie theater design.) NCC may even reopen the balcony, which has been closed off as a separate meeting space. They also hope to adapt the stage so that the space can be used for community events; and they're open to suggestions and ideas if you have any.
The People's Church will be moving to Maryland, where most of their members now live.
This gives NCC a bit of breathing room for designing and getting through all the bureaucratic hoops of building at 8th and Virginia, but Batterson considers 535 8th to be a "stepping stone" to the new location. And you can see how excited he is in his recent tweets hinting at the deal, which described to me as a "double miracle for both churches."
UPDATE: Here's Batterson's blog post on the news, with some cool vintage photographs of 535 8th.
Comments (3)
More posts: Development News, 8th Street, Nat'l Community Church, square 906
 

I've gotten a bit more information about the raze permit application at the Florida Rock site, the concrete plant on the banks of the Anacostia directly across from Nationals Park.
According to Florida Rock Properties, the owner of the site, the tenants are building a new plant on land also owned by FRP down South Capitol Street on Buzzard Point (at S and Water streets near the Pepco plant and the Coast Guard building). Once that new site is completed, the existing operations on Potomac Avenue will be shut down and the structures will be razed, which should happen sometime this summer (though timelines on these sorts of projects are never written in concrete, ha ha).
The plant is one of the last specimens of the ballpark area's previous life as an industrial zone, and has housed a gravel/stone/concrete operation since the 1920s, when Smoot Sand and Gravel operated there after moving from what is now the Yards Park site when the Navy Yard expanded its boundaries during World War I. I have taken scads of photos that have included it over the years, and should probably thank my lucky stars that I was never mowed down by any of the trucks coming in and out of there during all my photographing of the ballpark's construction. There was certainly a close call or two.
As I've noted about a billion times over the past eight years, the site's redevelopment plans call for a 1.1-million-sq-ft mixed-use four-phase development, but Florida Rock Properties does not as yet have any deals in place to get this new "RiverFront" project started. In 2009 they received a time extension on their zoning PUD, and are not required to file building permits until June 2012. The site will probably remain fenced and unused in the interim, but at least the dismantling of the tower will finally allow unobstructed views of the Anacostia River, the Douglass Bridge, and the east bank of the river from the ballpark's southeastern viewing platform. Not to mention nicer views of the ballpark from the river, for boats such as those using the Diamond Teague Piers next door. At least until the new development goes up....
Comments (1)
More posts: Development News, Florida Rock
 

With an instruction to residents to Please Don't Panic, I'll pass along the news that Onyx on First, the 266-unit apartment building at 1100 1st St. SE, is up for sale. With a brochure touting "Excellent Transportation Infrastructure, Phenomenal Employment Opportunities," and "Shopping and Entertainment Options Abound," the sellers look to be trying to get in on what is clearly a rebounding multifamily market in DC.
Apparently there's no price set for the sale, and with a building that's 92 percent occupied with what looks like pretty high average rent numbers, I imagine investors will be taking a close look. The eventual sale (should there be one) could also be an interesting barometer of how "the markets" view the neighborhood. Proposals are due April 14.
The building, originally planned to be condos but converted to apartments during the construction phase, was developed by Faison and the Canyon-Johnson Urban Fund and completed in 2009. It was built the same time as its neighbor 100 M, the office building that recently bought for $57 million in a foreclosure sale. Onyx is on the same block as the New Jersey Avenue entrance to the Navy Yard Metro station, two blocks north of Nationals Park, and one block west of the Courtyard by Marriott that is being bought for $68 million. And, of course, just across the street from the Market Deli.
You can see my Onyx project page for photos and more information.
Comments (6)
More posts: Development News, Onyx, Square 743N
 

Tucked away in today's DC Register is a zoning request by Forest City Washington to allow the second story of the currently de-skinned Lumber Storage Shed at the Yards Park "to be used for general office purposes, on an interim basis, for no more than 20 years." The filing says that Forest City wants to temporarily relocate "in order to facilitate the leasing of the ground floor and to finance the building's restoration."
The intention has been for the shed to be given glass exterior walls and be a retail space--this new plan would still include ground-floor retail (in a very picturesque location at the Yards Park, right by the 3rd Street Plaza and the overlook). There are two other retail pavilions planned for later phases of the park as well, on the open spaces just to the east of the shed.
Comments (0)
More posts: Development News, Lumber Shed/Yards, Retail, The Yards
 

Last night the National Community Church held its "All Church Celebration" at the Lincoln Theater, and, while I wasn't there for the "big announcement," I do know that lead pastor Mark Batterson told the assembly that the last of their land acquisitions on Square 906 (bounded by Virginia, 7th, 8th, and L) have been finalized.
As I've been conjecturing, this includes the auto garage on the corner of 7th and Virginia. But it also includes a contract for the two small apartment buildings at 716 and 718 L Street, just west of the alley. Batterson tells me that they are leasing back the garage to the current occupants until July so that they can find a new location.
Combined with the Miles Glass site that started it all and the empty lot on 7th, this now gives NCC (the folks behind the successful Ebenezers coffee house near Union Station) over 26,000 square feet of land on a somewhat T-shaped footprint on which to build their combination coffee house/performance space/offices. As I've mentioned previously, Batterson wrote on his blog in mid-February that they are now "full-steam ahead with designs" now that the footprint is finalized, and that he is "looking forward to initiating meetings with Historic Preservation, ANC, Riverfront Bid, Barracks Row Main Street, Office of Planning, etc." It wil be interesting to see if the zoning and height changes that business owners are looking for along lower 8th get through, and whether NCC would be taking advantage of being able to build a bit higher as a result.
Of course, this isn't the only new activity on Square 906, since it's on the south end of the block where the beer garden at 8th and L is supposed to be going in once the design gets through its historic preservation review, a process NCC will have to undergo as well since the block is within the Capitol Hill Historic District. This Saints and Sinners stretch of 8th is definitely going be a focus of activity in 2011.
Comments (0)
More posts: Development News, 8th Street, Nat'l Community Church, square 906, zoning
 
331 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 34
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.