Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Development News
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


331 Blog Posts Since 2003
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 34
Search JDLand Blog Posts by Date or Category

From today's print edition of the Washington Business Journal (subscribers only), news that two as-yet-unoccupied office buildings in Near Southeast may be close to securing tenants. WBJ says that Monument Realty is "in discussions" with Booz Allen Hamilton to lease more than 30,000 square feet of space at 55 M (currently home to Artomatic), though Booz is apparently also looking at Lerner's 20 M across the street and the under-construction 1015 Half a block to the north.
The article also says that an "undisclosed federal agency is on the cusp of announcing" a 100,000-sq-ft lease at 20 M. I have heard murmurings of some outfit moving to 20 M--if someone wants to whisper in my ear who it is, I'm listening!
 

The city's building permits feed hasn't been working with perfection of late, so I'm only now seeing some recent permits of interest:
* As many folks have seen (and as I Twittered last week), the asphalt is being pulled up on the southern end of Canal Park (here's a photo from last Friday, taken at Second and M). Two building permits have been approved for the southern two blocks, allowing for "interior cleaning [...] to remove pavement import top soil and plant grass." Hopefully the northern block will get a makeover too. (UPDATE: Commenter Scott says that work on the northern block is already underway.)
* Monument Realty has gotten a six-month extension on the raze permit for the Domino's at South Capitol and M. And, though it's outside my redrawn boundaries, I'll mention that 1244 South Capitol (home to the stalled Camden Development apartment building) got a final six-month extension on a raze permit for that site. (Though I was bummed to see on Opening Night at the ballpark that the little red brick building that had been left standing for so long was finally gone.)
* A final (belated) reminder that the latest Anacostia Waterfront Forum is tonight at 6:30 pm at the MLK Library. The topic is "Waterfronts and the World's Great Capital Cities," with office of planning director Harriet Tregoning.
* The Post wrote a piece in the Sunday Business Section about Bo Blair, the Georgetown Events "restaurateur / entrepeneur." Fun fact: he's paying $25,000 a month in rent for the space on Akridge's land at Half and N.
 

Don't know if the work started on Friday or today, but a late-evening drive down M Street brought the surprise news that demolition is now underway on the old WMATA Southeastern Bus Garage at Half and M. The demo is starting at its southeastern end (closer to N Street), and I can't imagine it'll take too long to dismantle the building. There's scaffolding now in place for a pedestrian walkway along the garage's M Street face. This is the first demolished building of 2009 in the neighborhood, and the 154th since I started photographing the neighborhood. (Browse the previous 153 via my Demolished Buildings gallery.) The bus garage site, now owned by Akridge, is slated to be replaced with 700,000-sq-ft of office, residential, and retail offerings, with construction perhaps beginning in 2010.
When I was circling the block to check the extent of the demolition (made more difficult by Half Street currently being closed so that infrastructure work can be done), I drove past the Center Field Gate at the ballpark and saw that the blank concrete wall that used to be the northern face of the Red Porch restaurant is now floor-to-ceiling windows, looking onto the plaza.
Comments (0)
More posts: West Half St., Development News, Metro/WMATA, Nationals Park
 

I was remiss in not mentioning earlier this week that I also posted updated photos on Saturday of the construction underway at 1015 Half Street (you old-timers can enjoy the shots of Nation one more time) as well as the all-but-completed 55 M Street (though the utilty work on Half Street prevented me from getting any photos other than of the northern part of the building).
For additional photos other than the ones on the project pages, check the Photo Archive for Half and I, K, L, and M, Van at M, and Cushing at L and M (which will also show you updated pics for other nearby projects, like Velocity).
Comments (0)
More posts: 1015 Half, Development News, officespace, square 697
 

With thanks to the folks at Akridge, I at last have some renderings of their planned 700,000-sq-ft mixed-use project on Half Street, which I've added to my project page and paired with the "before" photos of the same location. These are the plans that were approved by the Zoning Commission last month, and you can read my more detailed description of the project for additional information. Construction could begin in 2010.
Comments (0)
More posts: West Half St., Development News, zoning
 

On Monday night, the Zoning Commission gave final approval to the Capitol Gateway Overlay Review of Akridge's Half Street project, on the site of the old WMATA bus garage at Half and M. Normally this would be where I would link to my entry with a detailed description of the late January hearing on this review--except that I couldn't find it. And as I thought back, it then dawned on me that I didn't actually write one. I think I was waiting to see if maybe I could get some renderings (which I've failed at), and then life sped onward. Oops. Feel free to ask for your money back.
But at least I wrote a long description of the project when it was presented to ANC 6D in December--or, if you really want to know how the hearing went, here's the transcript. (Though it will be pretty hard to follow along without any drawings to look at.)
The 700,000-sq-ft mixed-use project could get underway in early 2010. The bus garage will probably be demolished pretty soon, to clear the space for stadium parking.
Comments (0)
More posts: West Half St., Development News, meetings, meetings, Metro/WMATA, zoning
 

Thursday (Jan. 29) at 6:30 pm is the Zoning Commission Capitol Gateway Overlay Review for Akridge's planned 700,000-sq-ft mixed-use project along Half Street. You can read my summary of the project plans as presented to the ANC a few months back for details; the ANC voted to support this plan at their January meeting. (I still don't have any renderings--I hope to soon!)
There's also the Office of Planning's hearing report for the project, which was prepared a few weeks ago; it says that OP is "very supportive of the project" but was unable to make a recommendation at the time of the report because it required additional information. I believe there's been some back-and-forth between Akridge and the planning office since then, but details will have to come at the hearing. The OP report is a good offering if you want a pretty detailed analysis of how the project stands up against the CG Overlay requirements as well as explaining the various exceptions and variances being requested.
If you don't feel like schlepping down to the Zoning Commission offices at 441 4th St., NW at 6:30 pm (and there's no one who understands that more than me), you can watch the proceedings on live webcast (no archived offerings, though). I imagine I might send a Tweet or two, if there's something worthwhile.
Comments (0)
More posts: West Half St., Development News, meetings, zoning
 

It's been more than a year since WMATA first awarded the Southeastern Bus Garage property at Half and M to Akridge (and almost six months since the suit brought by Monument Realty over the bidding process was settled), and at Monday night's ANC 6D meeting there was a first public peek at the designs for this central site being called 25 M Street, on the block just north of Nationals Park bounded by Half, M, N, and Van. And clearly Akridge is taking this project very seriously, as they arrived at the meeting with an army of people, including heavy-hitter architects Bill Hellmuth of HOK (who designed the office portion), Philip Esocoff of Esocoff and Associates (designers of the residential portion), and Jon Eisen of StreetSense (the group working on the retail).
I don't have any renderings yet (hope to within a month or so), but the ones displayed showed buildings with what Hellmuth described as "much more active facades" that "are not like a K Street monolith." There will be three buildings: two office buildings totaling 363,000 square feet, and a 276-unit residential building at N Street with roof terraces from which residents can look into the ballpark and watch the games. The facades step "out" and "in" (far enough in some places to require a zoning special exception), including some spots in the M Street office building that will allow tenants to look south into the ballpark, too. The general feel is not unlike the Monument designs for the other side of Half. (And, with a raze permit already requested, none of this incorporates the existing bus garage building.)
There will also be 56,000 square feet of retail, with a mix of one-, two-, and 2 1/2-story spaces occupying 69 percent of the ground floor, which will require a special exception from the Capitol Gateway Zoning Overlay's requirement of 75 percent. They are expecting to have national retailers for the spaces along Half Street, but are planning to look for smaller local "service" retailers for the additional space along Van Street.
They are also creating what they call the "Via," a pedestrian-only "street" that runs from Half to Van between the two office buildings at the same spot in their block as "Monument Street" will be across the way (just south of 55 M). They are envisioning a "one-of-a-kind" DC destination: a marketplace with stalls and local vendors, where you could get fresh food, "quick-bite" carry-out, etc. (They mentioned Pittsburgh as an example, and I'm assuming they're referencing the Strip District.) The renderings also showed two glass-enclosed suspended walkways above the Via to connect the two office buildings.
The entire project will be LEED certified (as is now required in DC), though they aren't sure yet what level they'll be shooting for ("the goal is to get as high as we can"). Hellmuth said that HOK is not doing a single building in DC right now that isn't at least LEED Silver, and that all major tenants want to be in LEED buildings.
I didn't get the total number of underground parking spaces, but the residential will have three spaces for every four units. (Monument's project across the street, of similar size, would eventually have about 700 spaces.)
Akridge indicated that their "ideal start date" is January 2010, with construction of the entire 700,000-sq-ft project estimated at 22 months. But there is no firm commitment that it will start at that time (thanks to the Current Economic Situation), plus it could end up being built in phases.
The ANC commissioners seemed receptive to the plans (Bob Siegel said that it gave him a "nice, warm feeling"), though with the usual questions about employment for local residents and LSDBE considerations, and concerns about residents and tenants having to work around ballpark traffic.
Akridge was officially at the ANC to request its support for both the zoning overlay review and the special exceptions being requested. While some commissioners were ready to vote to give support immediately, others weren't, and so after a number of differing motions that all failed it was decided that representatives of both sides would work together to discuss "issues" so that the ANC can vote on the project at its Jan. 12 meeting. The Zoning Overlay Review hearing is on Jan. 29.
And, not that there's much to see yet, but I do know have an Akridge/25 M project page, mainly with views of the bus garage from various angles.
Comments (0)
More posts: West Half St., ANC News, Development News, meetings, Metro/WMATA, Retail, zoning
 

While we're all busy looking at the hole in the ground on the east side of Half Street, plans are apparently moving forward across the way: Akridge's 700,000-sq-ft mixed-use project on the old WMATA Southeastern Bus Garage site (just across from the Metro station entrance) is now on the Zoning Commission docket for a Capitol Gateway Overlay Review on Jan. 29, 2009.
This project will cover the entire block bounded by M, N, Van, and Half, which is the stretch along which fans walk to Nationals Park from the west entrance of the Navy Yard Metro station. (Akridge bought the southernmost parcel from Monument Realty back in late August, at the same time it finally closed on its $46 million purchase of bus garage site.) A raze permit application was filed for the bus garage building in September.
There hasn't been much made public yet about this development, other than it will be a mix of office, residential, and retail, and the hearing announcement says that the FAR will be 7.9 and the maximum building height will be 110 feet. In addition to the overlay review (which sets out some firm guidelines for projects along M Street and in the Ballpark District), Akridge is also asking for relief from roof structure requirements, loading requirements, ground-floor retail requirements, and step-back requirements.
It's been reported that Akridge is expecting to begin on the project in 2010; they've hired HOK (designers of the ballpark and the Plaza on K), Esocoff & Associates (Onyx) and StreetSense Inc. to design what an Akridge press release calls a "one-of-a-kind destination." Quoting further: "'Half Street is the city's newest and most unique urban destination,' says Matthew J. Klein, Akridge President. 'This stretch between the Metro and the ballpark has great energy and we look forward to capitalizing on that and other natural amenities like the river, to deliver the area's best urban living, working, shopping, dining, and entertainment project.'"
I've marked this movement by finally giving the site its own project page (now separate from the old "Ballpark District" page). Hopefully in the lead-up to the zoning hearing we'll get a peek at some renderings.
 

Now winding its way through the DC regulatory process is a raze permit for the former WMATA Southeastern Bus Garage, at 17 M Street (directly across from the west entrance of the Navy Yard Metro station and one block north of Nationals Park). The garage was purchased last month by Akridge, which has indicated that it is planning a 700,000-sq-ft mixed-use project on the site, perhaps getting underway in 2010. The permit request is currently under review by the city's Historic Preservation Office; ANC 6D would also have been notified.
Comments (0)
More posts: West Half St., Development News, Metro/WMATA
 
331 Posts:
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 34
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.