Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: CSX/Virginia Ave. Tunnel
See JDLand's CSX/Virginia Ave. Tunnel Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


125 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 13
Search JDLand Blog Posts by Date or Category

Some bits of tid for you:
* NEW PROJECTS STARTING SOON: Residents at Capitol Yards and at Velocity have received notices in recent days about the pending start of two residential projects outside their windows: a 275-unit building by Paradigm on the east side of 1st Street between K and L (the old Market Deli site, for you long-timers), and Tishman Speyer's 800-unit project with potentially more than 40,000 square feet of retail on the Square 696 parking-lot block bounded by I, K, 1st, and Half. There is precious little additional information about either development--when projects are "at right" and don't have to go through zoning approvals, easily grabbed details and renderings can be scarce, but hope springs eternal that more deets will pop up soon. As will the fences, pedestrian detours, and backhoes.
* ONYX SALE: It's been announced that the sale of the Onyx on First apartment building at 1st and L has closed, with local company UIP (Urban Investment Partners) structuring a $95.5 million deal for the building that is now 10 (!) years old. UIP owns and manages about 2,800 apartments in DC and Maryland, and is also behind a lot of local renovations, including the old Howard Johnson's across from the Watergate. What makes this sale a little interesting is that when the previous owners notified residents of an impending sale, they organized under the District's Tenant Opportunity to Purchase Act, and then chose UIP to take the tenant acquisition rights. The press release says that "UIP has committed to installing cell phone repeaters" and will also improve the roof deck kitchens, install dog runs, and undertake other "building enhancements."
* THE BLUE CASTLE: The Hill Rag has shared a neat documentary by the students of the Richard Wright charter school about their school's 8th and M location, entitled "9 Lives of the Blue Castle." Wright focuses its curriculum on journalism and "media arts," for students in grades 8 through 12.
* TUNNEL UPDATES: The presentation from the latest "Coffee with Chuck" has a lot of cool pictures from inside the new Virginia Avenue Tunnel(s), where the JDLand camera does not tread. There's also continuing updates of schedules for cross street closures as the temporary bridge decks get demolished and the roads get rebuilt. Be prepared that a multi-month closure of 4th Street is coming, once 3rd Street is reopened.
Comments (37)
More posts: Blue Castle, CSX/Virginia Ave. Tunnel, Development News, paradigm, Square 696 Residential, square 740
 

It looks as if Insignia on M has a tenant for the retail space at New Jersey and L, in the same block as the Metro station entrance. There's a placard now posted that Navy Yard Wine Merchant* has applied for a Class B liquor license, which allows the sale of beer and wine--and has also included a request for a tasting permit. ANC 6D's ABC Committee will be taking this up later this month, and the full ANC could be expected to vote on whether it will support the application at its February meeting.
In other tidbits I've been meaning to pass along:
* ZAC BROWN: Normally Nats Park hosts a big concert during the All-Star break, but the stadium will be otherwise occupied during that stretch, and so this summer's big show, the Zac Brown Band, will be on July 27. Tickets are on sale now. UPDATE: And I've been reminded in the comments that this is actually the second of the big summer shows, with the Eagles and James Taylor playing the night before.
* CHLOE: The Post's Tom Sietsema liked what he saw at Chloe, calling himself "bewitched" with the debut menu, and that "right out of the gate, Chloe feels like a keeper."
* TUNNEL: The next "Coffee with Chuck" status meeting on the Virginia Avenue Tunnel is on Wednesday, Jan. 24, from 8 to 9 am at the CSX office at 861 New Jersey Ave., SE. There is lots of work in the 300 block of Virginia Avenue these days to turn it back into an actual street, with the beginnings of curbs and sidewalks and preparations for drains and streetlights, as well as working toward returning the entrance to the Capitol Quarter driveway to its original path from Virginia.
* PSA 106: This month's PSA-106 meeting is Tuesday, Jan. 23, at 7 pm at the Capper Community Center at 5th and K, SE. MPD holds these meetings to discuss residents' concerns and questions about public safety issues.
I took a bunch of pictures this weekend, but will write about that when I recover.
* I assume this is the actual name, but cannot say with 100 percent certainty.
 

I have been intending to write more substantively about a few of these things, but now in the interest of actually getting them posted, I'll go with abbreviated versions:
* DOUGLASS BRIDGE MEETING: DDOT is holding two public meetings to "discuss the current status" of the new Douglass Bridge project. There is one in Ward 6 on Tuesday, Nov. 28 from 6:30 to 8:30 pm at 1100 4th St., SW (DCRA conference room), and another in Ward 8 on Wednesday, Nov. 29 from 6:30 to 8:30 pm at the Thurgood Marshall Academy, 2427 Martin Luther King Jr. Ave., SE. See my project page and/or the official web site for details.
* DOUGLASS BRIDGE BLEATING: The Commission on Fine Arts says the new bridge design "lacks grace." (WBJ)
* 3RD STREET TWEAKING: Watch for the single travel lane on 3rd Street SE at Virginia Avenue to be moved off of the temporary deck and onto new pavement Any Minute Now. This is so the deck can be demolished and restoration work can then continue on both 3rd and Virginia. (CSX)
* BARRACKS EIS RELEASING: Remember those plans to build a new Marine Bachelor Enlisted Quarters, which ended up deciding that the new building would be built next to the existing building at 7th and L? There's actually some movement, with the final EIS expected to be released Any Minute Now, and the Record of Decision expected to follow. I'll write more when the EIS comes out, but in the meantime here's a newsletter from last month with the latest.
* ANC REP REPPING: Read more updates on neighborhood goings-on from ANC 6D07 commissioner Meredith Fascett.
* TASTEBUDS APPROVING: Ana, the restaurant at District Winery, gets good words from the Post's food critic. (WaPo)
Comments (11)
More posts: Barracks, CSX/Virginia Ave. Tunnel, meetings, Douglass Bridge, Traffic Issues
 

Time for my quarterly {ahem} update on all of the construction projects you are picking your way past when you walk/drive/bike around the Hood:
I'll start with the new openings and the coming soons, with both Due South Dockside and Morini Piccolo now operating (softly) on the Yards Park boardwalk, and Cava in the Homewood Suites at Half and M in Any Second Now territory:
As for buildings getting their faces on, I present Skanska's 99 M office building and the new DC Water headquarters:
There's also now two new arrivals above ground, as PN Hoffman's condo project The Bower has at last made its debut at 4th and Tingey, as has the DC Housing Authority's as-yet unnamed mixed-income rental building at 2nd and L, both of which are shot from the south instead of the intersection because it's now the time of year when anything shot to the south-southeast, south or south-southwest will look terrible, no matter what time of day:
Next on the assembly line, two more residential projects projects are likely to be making their above-ground debuts before the end of the year: JBG's West Half project directly north of Nats Park, and the McDonalds-slaying 2 I Street project:
Other holes in the ground I won't highlight this time around include the Bower's sibling rental project at 4th and Water, Toll Brother's Parc Riverside Phase II at Half and L, the Jair Lynch residential project at the Half Street Hole, and the combo project at South Capitol and M for the new National Association of Broadcasters headquarters and its next-door residential project labeled 10 Van.
Also, WC Smith has cleared the lot at 2nd and I to make way for the beginning of work on the Garrett, the third and final apartment building that makes up "The Collective" on that block. Plus, fences are up along 3rd Street for the next project in the Yards lineup, the 270-unit apartment building currently known as "Parcel L2." (Great, I have to update my Highlighted Projects map again.)
Just to make sure all ends of the construction spectrum are represented, one hole is even starting to get covered over, and that's in the 200 and 300 blocks of Virginia Avenue, where the Virginia Avenue Tunnel work is far enough along that you can actually start to imagine a street appearing again in those blocks in the coming months:
Finally, I'll close with a shot of a tearing down rather than a building up, and that's the pile of debris formerly known as 37 L Street SE--just in time to mark the 40th anniversary of the Cinema Follies fire, on Oct. 24, 1977.
So, while the neighborhood is taking a back seat these days to all of the excitement surrounding the opening of the Wharf down the road, there is still a fair amount happening. (And hopefully the neighborhood blogger will someday get back in the groove. Still riding the rollercoaster of my new not-yet-ready-to-call-it-normal.)
 

I start with this photo of some recently posted signage, which I'm pretty sure debuted at the top of the list of Most Ignored Signs in Washington. (No one ever believes me when I tell them that riding bikes isn't officially allowed on the Navy Yard portion of the Anacostia Riverwalk.)
And now to a way-too-long pile of tidbits:
* PLAYOFFS: I doubt anyone at this point needs to tell me that the first of what will hopefully be numerous playoff games this October at Nats Park is tonight (Friday), when Game 1 vs the Cubs starts at 7:31 pm. They'll play again tomorrow at 5:38pm, and would return on Thursday Oct. 12 for the fifth game of the series, if necessary. Here's a rundown from the BID of playoff-related festivities and deals that might be of interest.
* WILLOW: I have been remiss in not passing along that DC-based clothing and gift shop Willow is going to be opening a second location in the ground floor of Arris, at 4th and Tingey in the Yards. As described in the BID newsletter, "The store brand adds a distinctive local twist with DC neighborhood-inspired gifts and clothes designed in-house by members of the Willow team."
* DOCKSIDE?: I have not confirmed this personally, but a reader reports being told by workers putting out tables on Thursday that the new Yards Park boardwalk kiosk outlet of Osteria Morini is expected to open this evening. UPDATE: Reader now says that no, it's Due South Dockside. But that's what I get for not reporting it out myself. {hangs head in shame}
* BYE BYE 37 L: Photographic evidence on Twitter of the demolition of the Empire/DC Flyer Cab company building, which is making way for a new residential building. It becomes the 175th entry in my Demolished Buildings Gallery (up a spot from its brief designation as #174, after a reader pointed out that I had neglected to add, of all things, the McDonald's, though I will give myself a break on that one, given the maelstrom in my life at the time).
* THIRD STREET CLOSURE UPDATE: Flashing signage north of 3rd and Virginia says that the four-month-ish-southbound closure is now scheduled to begin Oct. 11. (After the first two games of the playoffs, I might add.) I saw from the freeway yesterday that the huge reinforcing beams (more like tubes) that were installed across the footprint of the two tunnels are being removed between 2nd and 3rd Streets, and there's even now some small square footage where both tunnels are covered with dirt. (UPDATE: The sign was changed this morning to read "On or About Oct. 10," and now the latest VAT newsletter says "as soon as Oct. 9.")
* GARRETT TEA LEAVES: The building permits have been approved, and construction trailers arrived within the past few days at the staging lot on the former trash transfer site at 2nd and K, and so signs are pointing to work getting underway on The Garrett, the last of WC Smith's "Collective" troika. Joining siblings Park Chelsea and not-yet-open-but-newly-landscaped Agora, the Garrett will have about 375 rental units, and ground-floor retail. (No, I don't know when Whole Foods is opening.)
* PARC RIVERSIDE PHASE II: A reader who lives at Velocity says that management informed residents that work is expected to resume Any Second Now (or maybe already has) on the excavation for what will be the second phase of the Parc Riverside residential project, at Half and K.
* BOWER FLOOR PLANS: If you have been desperately awaiting the condo project known as the Bower to start selling, well, that hasn't happened yet, but floor plans are finally available on their web site. (h/t RMP)
Comments (49)
More posts: 37l, CSX/Virginia Ave. Tunnel, The Garrett Apts., morini, Retail, riverwalk, Parc Riverside Apts, willow
 

In what could be considered the first hint of the proverbial light at the end of the Virginia Avenue Tunnel project, CSX has announced that starting sometime in the next few weeks--perhaps as early as October 2, though one might wonder if playoff baseball might impact the timeline--it will be closing the southbound lane of 3rd Street at Virginia Avenue for approximately four to five months, just as it did for a shorter period of time back back in March of 2016.
This closure is to allow for the demolition of the temporary deck over the still-under-construction north tunnel, which will then allow the roof of that tunnel to be built. Then work can begin on "installation of the new, final roadway features" on Virginia Avenue itself, first in the blocks just east of 2nd Street and then working eastward (which will mean more deck removals and temporary traffic flow changes/closures in coming months).
Traffic coming south down 3rd Street north of the freeway will still be able to make the right onto the freeway entrance ramp.
As with the previous closures, pedestrian access along 3rd Street will be maintained, as will access to the driveway to the Capitol Quarter houses on the front lines.
Fourth Street will be the main southbound route from north of the freeway down into the neighborhood.
Enjoy my map (sorry, CSX, my maps are easier to read than yours), and read the CSX presentation for more information.
Comments (32)
More posts: CSX/Virginia Ave. Tunnel, Traffic Issues
 

Some brief items while I continue to be more or less on sabbatical:
* 1ST AND K SLIVER? Urban Turf reports that the owner of garage on the northeast corner of 1st and K has finally sold his lot, and a developer is planning a 12-story 34-unit residential building. Urban Turf has a rendering, but I prefer looking back to December 2004, right after the garage building was rehabbed and opened as A1 Tires. JPI attempted to buy the site back when planning 909 New Jersey, but the owner was, shall we say, not interested. (The expletives still ring in my ear from when I asked him about it a decade ago.)
* YARDS PARK KIOSKS: With the return finally of the approved building permits feed, I was able to report in the comments a few days ago that the construction visible in the kiosks along the boardwalk at the Yards Park were for ventures from the owners of Lumber Shed tenants Due South and Osteria Morini (along with what I believe is office space for the marina). I posted last year about the possibility of "Due South Dockside," but Eater has now reported that the Morini kiosk is not going to be the long-ago announced pizza joint Nicoletta, but a "summer sister spot" for Morini that could open late this summer. "Details about the offshoot are limited, but expect a bar serving draft beer and wine, as well as a pared-down menu of what’s available at the flagship restaurant. That includes made-to-order salads, the New York-transplant’s iconic meatballs, and simple desserts," Eater says.
* FED WAREHOUSE: Another twist in the long-running saga of the warehouse at 49 L Street: There is now a sign up announcing that the site is up for sale, and a commenter found the GSA listing.There was talk a few years back of this building being traded to the city, but that apparently is not coming to pass. (Nor apparently did the city choose it as the site of a homeless shelter.) And once upon a time a group of residents wanted it to become the Half Street Market.
* ROSE PT: The BID Newsletter reports that Rose Physical Therapy Group is now open in the ground floor of 1015 Half Street.
* ROOFING: The first "roof cap" on the rebuilt original Virginia Avenue Tunnel was pored last week, in the 200 block of Virginia Avenue. It seems odd to say these words, but the project is expected to be completed next year. (Time flies.)
* YOU'RE AN ALL STAR: The preparations and publicity for the 2018 MLB All-Star Game at Nats Park are now underway, with the unveiling of the logo and also information on how one might actually procure tickets.
Comments (23)
 

Hope everyone enjoyed that 45-second snowstorm this morning!
Here's a roundup, mostly from the running linkage I've been posting in the comments. And the photo at right has nothing to do with any of the tidbits--it's just from 11 years ago today. A little different.
* STYMIED: The developers of the proposed large residential project at 1333 M are asking for a two-year extension on their zoning PUD, citing beiing "stymied" in finding financing. (Capitol Hill Corner)
* UNVEILED: Forest City has shown ANC 6D the first renderings of its planned hotel at 3rd and Tingey, SE, on the north end of "Parcel L," where they are already planning a large residential building as well. (Urban Turf)
* TUNNELED: In Virginia Avenue Tunnel news, next week or thereabouts, watch for daily closings of 4th St. SE between I and Virginia, as well as the return of two (shifted) lanes on the 6th Street exit ramp. Also, the portion of 5th (or is the 6th) Street immediately south of Virginia is now closed for seven weeks or so. And the next "Coffee with Chuck" update is at 8 am on Feb. 22 at 861 New Jersey Ave., SE.
* FLICKED: Vote on the lineup for this summer's Thursday Outdoor Movie Series.
* PROMOTED: The 2017 Nats gameday promotions and giveaways lineup is now available.
* SALTED: Ryan Zimmerman is an investor/part-owner of The Salt Line, opening this year across the street from his place of employment. (City Paper)
* STUFFED: Five Guys is back.
Given this weekend's forecast, I may try to get out to take some photos, if the stars align.
 

My focus is elsewhere these days, but I haven't completely stopped keeping an eye on things. Just not any real big news to report. So here's some little news:
* INAUGURATION: It might be a challenge heading north out of the neighborhood on Jan. 20. Here's DDOT's page on the inauguration, with a map of the close-in detours and closings, and the pedestrian routes, and more.
* TUNNEL OPEN HOUSE: The next Virginia Avenue Tunnel open house is Thursday, Jan. 12 (tomorrow), from 6 to 8 pm at the Courtyard Marriott at New Jersey and L, SE. "A brief presentation and Q&A session with residents will be held at 7 p.m., in response to requests from neighbors." Also, CSX says it expects to reopen 3rd Street at Virginia during the week of Jan. 23-27. After that, there will be another temporary closing of 4th St. SE at Virginia to move a utility manhole. And 7th should be reopening at Virginia Any Minute Now.
And, a tidbit that is neither traffic nor tunnel, but is welcome:
* A BRIGHT LIGHT IN THE DISTANCE: Nationals pitchers and catchers report to the new West Palm Beach spring training facility on Feb. 14, with position players arriving by Feb. 17. (WaPo)
What else is going on these days?
Comments (15)
More posts: CSX/Virginia Ave. Tunnel, inauguration, Traffic Issues
 

At 8 am on Friday, Dec. 23, the first double-stacked train passed through the newly built southern tunnel under Virginia Avenue, SE, marking the official completion of that phase of the Virginia Avenue Tunnel project.
(Alas, the photo at left shows a train coming through the old tunnel, before the rails were laid into the new one, but whaddyagonnado.)
Now Phase II of the project is kicking into gear, which is the rehabilitation and expansion of the existing 100-plus-year-old northern tunnel. That work is expected to be completed, along with the streetscape restoration improvements to Virginia Avenue, in mid-2018.
If you want to see some photos from inside the new tunnel as work was being completed, CSX has them in this presentation.
As part of the work on the northern tunnel, the intersection of 7th and Virginia is expected to close Any Minute Now for about two weeks. Of course, 3rd Street remains closed at Virginia for similar work of demolishing the temporary deck over the now-completed new tunnel and rebuilding it over the northern tunnel; it is expected to reopen in January.
Comments (12)
More posts: CSX/Virginia Ave. Tunnel, Traffic Issues
 
125 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 13
Search JDLand Blog Posts by Date or Category