Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capitol Quarter
See JDLand's Capitol Quarter Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


150 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 15
Search JDLand Blog Posts by Date or Category

Here's a bunch of little items and event reminders. Alas, next week's pile of happenings come at a bad time on my calendar, and I'm going to have to miss almost all of them, so this would be a good chance for everyone to attend these meetings themselves instead of sitting around waiting for me to tell you what happened at them. :-)
* ANC 6D (Southwest and Near Southeast) has posted the agenda for its November meeting, which includes an update on the plans for Canal Park. It's on Monday, Nov. 9, at 7 pm, at St. Augustine's, Sixth and M streets, SW.
* The next night, ANC 6B (Capitol Hill SE and Eighth Street) is having its November meeting, where there will be a presentation by CSX on its planned Virginia Avenue Tunnel construction. (Voice of the Hill recently wrote about the plans, and you can read my posts about them, which include links to some source documents.) ANC 6B's meeting is Nov. 10 at 7 pm at the Old Naval Hospital at 921 Pennsylvania Ave., SE.
* Plus, the Friends of Garfield Park are having their own informational meeting about the CSX plans, on Thursday, Nov. 12, at 7 pm at Capitol Hill Day School (Second and South Carolina, SE).
* The Lower 8th Street Visioning Process folks have posted the minutes, historical background, and main presentation slides from their two October sessions. They've also posted the agenda for their November meetings, scheduled for 8:30 am and 7 pm on November 17 at the People's Church, 535 Eighth St., SE.
* And, if these events aren't enough for you, you can also watch on Nov. 12 the city council's Committee on Finance and Revenue Hearing on the bill that would allow the sale of bonds via the city's CFO office that would pay for a considerable amount of "Phase 3" infrastructure work for Capper/Carrollsburg redevelopment, encompassing some as-yet-undetermined combination of underground work on the Second Street blocks, the relocation of the DPW operations at New Jersey and K and demolition of that block, and the construction of I Street between Second and New Jersey. (This is above and beyond the $9.5 million in federal stimulus funds that the city is receiving to allow Capitol Quarter's second phase of townhouses to go forward.) The council hearing is on the 12th at 10 am, and you can watch on DC cable channel 13 or via the channel's web site. Here's my post about this proposed bill, if you want to know more.
 

I played cat-and-mouse with the clouds today and took some photos of the progress in the third block of Capitol Quarter, where the townhouses have sprung up pretty quickly over the past six weeks, meaning that St. Paul's Church at Fourth and I (above) and the private homes along Fifth Street are no longer the lonely outposts they've been since late 2004.
So that your computers (and my server) don't collapse, here are the (separated) links of these new befores-and-todays, which take you on a walk around the block: Fourth and Virginia, Fourth and I, Fourth and K, Fifth and K, and Fifth and Virginia. You'll also see on the northwest corner of Fourth and I that the concrete foundations are now being poured for the fourth and final block of Capitol Quarter's first phase.
It will be five years ago next week that the demolition began on the blocks where all these new townhouses are going up; paging through the photos I took during November 2004 while the wrecking crews worked, it in some ways seems a lot longer than that. The eastward view along K at Fourth is a pretty good representation of what these blocks have been through:
See the whole batch here; you can click on any you see in the archive or use the Photo Archive Map Browser to track the fall and rise of any other location.
Comments (0)
More posts: Capper, Capitol Quarter
 

Yesterday the US Department of Housing and Urban Development announced the awarding of $500 million in stimulus-money grants to housing authorities around the country, with the DC Housing Authority receiving the $9.5 million it requested to help get the second phase of Capper townhomes at Capitol Quarter moving forward.
In my post on DCHA's application back in June, I explained it this way:

According to this "narrative and schedule" that DCHA included with its application to HUD, the money would finance both public infrastructure and private site improvements needed to begin the construction of the second phase of the Capitol Quarter mixed-income townhouse development (the blocks between Third and Fourth south of I), which will have 163 units, 47 of which are public housing rental units (along with 60 market-rate, 39 workforce-rate, and 17 public housing home ownership units). The narrative indicates that the $55 million Capper PILOT bonds approved by the city council last year that were to fund the new community center and infrastructure improvements not only in the Phase II blocks but also on the north and east sides of Canal Park and over to the DPW site never made it into the bond market; attempts to secure loans from both Fannie Mae and Wachovia also were fruitless.
There's a lot of detail in the narrative that I'm not going to try to summarize (I start to glaze over once I get to Low Income Housing Tax Credits [LIHTC] and anything having to do with "leveraging"):, but it does say that if awarded the HUD CFRC grant money, DCHA would immediately have its engineers complete permit drawings, which can then be put into the city's permitting process (estimated to last 90 days), after which infrastructure work can begin--the schedule at the end of the document estimates a start date of Dec. 1. This work would include repair or replacement underground water, sewer, and "dry utilities" lines, new streets, curbs, and gutters, additional lighting, and public landscaping.
The HUD funds would also be used to pay for the land preparation costs and foundation construction of the 47 public housing units, covering a $1 million gap that occurred in the planned Phase II funding thanks to problems in the LIHTC market.
From what I understand, DCHA is already talking to contractors, with hopes of being able to start delivering the first phase 2 townhomes by late next year; this would be in the blocks between Third and Fourth south of I.
There may also be some money coming for the other Capper-related improvements listed above that were to be paid for by the $55 million PILOT bonds, but not as part of this grant.
Comments (0)
More posts: Capper, Capitol Quarter
 

Even at my laziest, it's hard to not pull out my camera on a day like today and head to the Hood. But without a lot of projects going on, I had the chance to also wander by some locations I've not paid as much attention to as I should. Here's the highlights:
I stopped by 11th and 12th streets to get caught up on the RFK ramp demolition that's part of the 11th Street Bridges project. The ramps across M have been down for a while now, making M Street along this stretch seem slightly less claustrophobic. The remaining concrete pillars (like the one at left, and the stubs on the south side of M) make for some interesting sculptures.

Capitol Quarter continues to progress on its third block (between K, I, Fifth, and Fourth), with some houses now bricked and framing coming soon to the north side of the block, making St. Paul's church not look quite so lonely anymore. Plus, the first foundations are being poured on the fourth and final block of phase 1, along Virginia Avenue between Third and Fourth.
I even ventured down to the fences at the Park at the Yards to see what I could see, and on the west side of the footprint I could glimpse some of the work being done on the Canal Basin water feature at the foot of Third Street as well as some clearing of the area that will be the Great Lawn. Here's the latest photos, or check the Yards Park page to see some of them matched with the renderings of what the spots will look like.

This isn't the most earth-shattering shot of the day, but I did feel it necessary to finally get a shot of 900 M Street now that Domino's is open.

Last but not least, I wandered around Virginia Avenue Park, finally getting my set of "baseline" photos along Ninth Street (only six years later than I should have). I also took some photos of the park itself but I'm going to take a little more time and not do a rush-job on the park photos; the one above, of the community garden, will have to tide you over a little longer.
As always, on any of these pages, click on the icon to see a complete set of before-and-afters of the location you're viewing. (And boy, am I loving being able to post larger thumbnails of photos here in the blog entries, thanks to the redesign of the home page. But don't forget to click through to see the non-thumbnailed versions.)

 

More than five years after the first demolitions at the old Capper/Carrollsburg public housing complex, city officials, developers, and residents gathered at Fourth and L today for a ribbon cutting at what is now known as Capitol Quarter, the mixed-income townhouse development that's been under construction since last year. (Residents actually started moving in this spring, but let's not spoil the party.)
As most readers know by now, the old 707-unit Capper complex is being replaced with what will eventually include 1,500 residential units (with a one-to-one replacement of all 700 public housing units), 700,000 square feet of office space, and 50,000 square feet of retail. Two apartment buildings with 300 units for low-income seniors and moderate income residents--Capper Seniors #1 and 400 M--opened in late 2006 and 2007; four more mixed-income buildings will eventually be built on lots by Canal Park.
My photos of the festivities are posted--and enjoy them, because there aren't many ribbon cuttings in Near Southeast's near future!
I also finally updated my photos along Fifth Street this morning, and at Fourth and I and Fourth and K yesterday and today, making for a pretty striking batch of before-and-afters, especially since these are the first photos I've taken since the framing really took off on the north side of K. Also, digging is now getting started on the final block of phase 1 (Square 797, between Third, Fourth, Virginia, and I), and framing should begin in October or November, with those final first phase homes expected to be finished next spring. When will phase 2 start sales and pre-construction? As soon as they get some money, and everyone knows how easy that is right now....
I will be adding some new mid-block photos to my Capitol Quarter Phase I page, and freshening it up a bit, later today.
Comments (0)
More posts: Capper, Capitol Quarter
 

* A reminder that tomorrow (Wednesday) at 10 am the DC Housing Authority is holding an official ribbon cutting and grand opening at Capitol Quarter, Fourth and L, with the mayor expected to be in attendance. If the sun is out, I may use this as the motivation to finally get some updated photos of the construction, with the framing in block three (north of K between Fourth and Fifth) now well underway.
* The Post reports on how the many new apartment buildings in the area are aggressively competing for tenants, with the new buildings in Near Southeast apparently leading the way: "The ones around Nationals Park, for instance, collectively have offered the deepest concessions since Delta started tracking rents 18 years ago. Some of those projects gave away the equivalent of four months' rent in concessions, which helps explain why effective rents in the District plunged 7.8 percent in June compared with a year ago. Without the ballpark area, rents fell 4 percent."
* From the BID's newsletter last week: "Mark your calendars for September 19th for the FRONT Door Home Tour & Canal Park Picnic from 10 am - 2 pm. The FRONT Door Tour will feature a variety of unique residents' homes and highlight the Capitol Riverfront as a new residential neighborhood in DC. The event will include a community picnic at the future site of Canal Park (located at intersection of M St., SE and 2nd St., SE) with food, music, and lawn games. The FRONT Door Tour will be free and open to the public. More information to come soon."
And, two items about off-topic projects by Near Southeast developers:
* Monument Realty announced yesterday that its long-planned renovation of Potomac Place Tower on Fourth Street in SW is now going to move forward. From their press release: "Monument Realty acquired the Potomac Place project in 2001 and in 2005 completed construction of a new, 302-unit condominium adjacent to the existing Potomac Place Tower, which was built in 1959. In 2003, Potomac Place Tower was designated a historic landmark by the District of Columbia and in 2005 the residents of Potomac Place Tower elected to convert the property to a condominium. Monument Realty's longstanding history and commitment to the project gave the new lender the confidence to retain its services for the completion of Potomac Place Tower."
* Forest City Washington has been selected by the government of Puerto Rico as the program manager for the redevelopment of a 100-acre portion of San Juan's waterfront district. Residential, hotel, office, retail, public parks, and a marina--sound familiar? (I don't think I mentioned that a few weeks ago the District selected Forest City as an advisor for the redevelopment of Poplar Point.)
 

A slew of upcoming events to pass along:
* On Wednesday (Aug. 19), there's going to be an 11th Street Bridges Open House, billed as an update for Ward 8 residents about the status of the bridge replacement project. (But I'm guessing people from other wards can come, too.) It's from 7 pm to 8:30 pm, at the Union Temple Baptist Church at 1225 W St., SE.
* Thursday (Aug. 20) is the last night of the BID's 80's Outdoor Movies series, with "Ghostbusters" on the bill (rescheduled from a rainout earlier this year). Apparently the BID is planning a four-week fall movie series starting in September; I'll pass more along on that when I get it.
* Next Wednesday (Aug. 26) the DC Housing Authority is holding an official ribbon cutting and grand opening at Capitol Quarter, from 10 am to noon at Fourth and L, with the mayor expected to be in attendance. This is just a little over two years after the ceremonial groundbreaking, held on a sweltering day in June 2007.
* If you're desperate for something to do Wednesday morning but a ribbon cutting isn't your thing, the U.S. Navy Museum at the Washington Navy Yard will host "Pirate or Privateer? War of 1812 Day," a series of demonstrations and lectures on the War of 1812. The program, which runs from 10 am to 2 pm, includes Gun Drills in the replica of the USS Constitution and Sea Chanteys. The event is free and open to the public, though note that there's no parking available inside the gates for visitors.
* The National Capital Planning Commission again has the design of the 11th Street Bridges on their tentative agenda, for their Sept. 3 meeting. It had also been on the tentative agenda for the July meeting, but didn't make the final cut; hopefully that won't happen again, because NCPC always puts together such great reports on the projects it votes on (and posts them on their web site), so it's a good place to get details that have been hard to find elsewhere.
* This is still a few weeks away, but residents might want to mark their calendars that the next ANC 6D meeting, on Sept. 14 will be held in Southeast, at the Courtyard by Marriott at New Jersey and L. I've been attending ANC meetings off and on for six years, and this is the first one I remember that will be crossing South Capitol Street.
* The next day, Sept. 15, Urban Land Institute Washington is holding its third Urban Marketplace Conference and Expo, which brings together "the private, nonprofit, and public sectors to explore redevelopment opportunities and best practices in emerging neighborhoods and corridors across the Washington metropolitan region." One of the day's discussions, from 3 pm to 4 pm will focus on the ballpark district (and I'm one of the panelists).
All of these are of course on my Upcoming Events Calendar.
 

It's been a while since I've posted a big batch of new photos (and be assured that the guilt has been killing me), so I made a couple of quick runs today to rectify this. The showiest shots are to be had at Capitol Quarter, of course, with the houses on both sides of L between Fourth and Fifth now mostly occupied, and those up Fourth and on the south side of K now painted and landscaped. If you want an even fuller set of photos than what's on my CQ page, go to the CQ Phase I Expanded Archive to see all angles of the intersections where construction is either completed or still underway. (The multicolored houses up against the bright blue sky, lit by the summer-solstice-height-sun, show why I tend to wait for sunny days to update the photo archive. Well, that and I'm lazy and am always looking for an excuse to not go take pictures.)
Meanwhile, at Canal Park, I finally got some photos of the sod on the southern block, and the first hints of grass on the other two blocks as the seeding starts to grow in.
And, over at 1015 Half Street, the glass continues to be hung on the northern exterior, so I took some photos of that side of the building. (The southern side looks the same as it did in May, so I happily skipped those photos.) The block does now look a little different from when Nation was there.... (See the expanded archive for additional shots.)
Here's the complete batch of today's photos, but to see their "before"s, as well as the other photos along the way, click the icon. Or you can just browse the Photo Archive by street, direction, and/or date.
Comments (0)
More posts: 1015 Half, Canal Park, Capper, Capitol Quarter, square 697
 

On Saturday EYA will be opening its new Capitol Quarter Sales Center and two model homes, in the row of houses now being finished along Fourth Street just north of L. They were nice enough to give me a sneak peek this afternoon, and I've posted some very quick photos of the interiors. The models are the Addison II and Banneker II designs, with the sales center in the ground floor of the Banneker. (You'll have to march up to the Banneker's third floor to see all the finishes and options.)
My photos of Capitol Quarter itself are a little outdated (damn rain)--the houses on both sides of L between Fourth and Fifth are now done and owners are moving in, while the houses along Fourth will start having their closings next month. The houses along Fifth are framed but not yet bricked, and foundations are being built in the next block, north of K Street. There's currently 21 houses for sale.
The grand opening is from noon to 4 pm on Saturday, at 1020 Fourth Street, SE, for those of you who need an address for your GPS.
Comments (0)
More posts: Capper, Capitol Quarter
 

With thanks to Mom for decreeing that my Mother's Day responsibilities had been taken care of last week, I was able to take not one but two treks through Near Southeast on this beautiful Sunday, and have uploaded a pile of new photos. Some--like the ones I took at 909 New Jersey and 55 M--are the last ones I expect to take of certain angles for a long time to come, but I did get some good "change" shots:
There's now a sign up at "The Bullpen" at Half and N (opening Friday?), and I also snuck a shot of the tent and piled-up picnic tables, which you can see on my Akridge Half Street page (scroll down a bit if the link doesn't jump you down). You'll also see updated shots of the garage-less Half and M corner.
It's not very easy to take a picture that well-represents the lack of cyclone fences, but I gave it a shot with a few different angles of the south end of Canal Park. I have to admit that was I was surprised by how much wider the block now seems; when it becomes a real park, with tall buildings on all sides, that extra width will be welcome.
Next up is 1015 Half Street, the 400,000-sq-ft office building now topping out on the old Nation nightclub site. With Half, K, and L being so narrow, it's not a bad idea to step back a block or two to see 1015's impact on the skyline, so check out the Expanded Photo Archive. The next phase of construction should be the hanging of the exterior glass.
It's pretty hard to stay away from the goings-on at Capitol Quarter, as brickwork is all but complete along Fourth between I and K. The Expanded Archive shows all the CQ shots I took today, along with the ones from two weeks ago showing the first completed stretch of homes, on the south side of L between Fourth and Fifth.
You might also see a few new shots of Onyx, 100 M, and Velocity if you visit those pages, and some other images in the random shots at the top (and bottom) of the JDLand home page, since I took a pretty complete set of photos from New Jersey to Half and from M to I. And, without much new construction going on, I don't anticipate taking many photos other than at Capitol Quarter and 1015 Half (and I guess Teague and Canal parks) over the next few months. (I'll also be ready if/when Akridge demolishes the buildings along First between K and L.) So, enjoy these, and take the time to really compare them to their "befores."
 
150 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 15
Search JDLand Blog Posts by Date or Category