Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper Senior Apt Bldgs
See JDLand's Capper Senior Apt Bldgs Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


78 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

I've added a graphic to my Capper/Carrollsburg page that shows the general outline of the plans for the area. (I realized that while I know what's going where, and have mentioned it from time to time on my site, perhaps not everyone can read my mind and so might prefer an easy-to-read image that lays out the concepts of this 33-acre revitalization, rather than having to sift through piles of zoning documents or waiting for EYA to add a real "Site Plan" link to their Capitol Quarter page.) I also added a similar graphic and some detail to the Ballpark District page, while we wait to find out what the AWC has up its sleeve.
More posts: Capper, Capper Senior Apt Bldgs, Capitol Quarter, staddis
 

Today's DC Register has published an ever-so-slightly corrected version of the Capper/Carrollsburg first-stage PUD approval from 2004. Since the second-stage PUD should be coming before the zoning board in the near future (and is being discussed at the ANC 6D meeting on Monday 10/17), perhaps printing this is one of those arcane zoning rules I'm unaware of. Anyway, anyone interested in the plans for the Capper/Carrollsburg site should take the time to plow through these 40 pages.
More posts: ANC News, Capper, Capper Senior Apt Bldgs, zoning
 

It's been a busy busy weekend here at the Near Southeast page. To reflect the true boundaries of the area I'm tracking, the map at right has been expanded, to 11th Street to the east and to South Capitol and S Streets in the south. I've also added two new pages to the site: the New South Capitol Street Bridge page, and the Near Southeast East End page, both of which have lots and lots of photos, and links to information about what's happening in those spots. I've also finally made my Navy Yard page more than an afterthought, adding many more pictures (although not so many from inside the Navy Yard walls, I don't want a visit from the Homeland Security folks). I know this makes the map smaller and a bit harder to read, but I also needed to leave some space for when more projects get underway. And, in the midst of all that, I added new photos to many of the existing pages: check out the DOT HQ, Washington Canal Park, Capitol Hill TowerFlorida Rock, and WASA pages to see them. (You'll also find a few new pictures on some other pages, but it'd be embarassing to mention them here when there's only one new photo on a page.)

 

Some Capper/Carrollsburg items: I hear tell that the construction contract for Capper Seniors #2 will be awarded soon (once the money aspect of the project gets settled, also "soon"). Also, word is that the Capper Community Center is to be demolished, Any Minute Now (we have a lot of those type of items, don't we?). In zoning news, the October Voice of the Hill gives details on the Sept. 15 zoning commission Capper / Carrollsburg agenda items--in addition to a second-stage approval being sought for a three-acre section of the project (presumably the "ribbon" between 5th, 4th, I, and M, which was demolished nearly a year ago), the developers are submitting a new application with modifications to several aspects of the original plans: they are seeking to increase the residential density to 2.34 from 2.21, and at the same time are proposing to reduce the parking spaces per unit to 1.38 from 2.1--these changes are the result of efforts to preserve some of the existing private houses that had been slated for redevelopment, according to a DC Office of Planning staffer. No date is yet announced for the public hearing on this.
More posts: 400m, Capper, Capper Senior Apt Bldgs, zoning
 

I've been away for more than a week, so I apologize if my news items have been slow--I'm still catching up on some things, hope to get back up to speed soon. In the meantime, I'll pass along that the DC Zoning Commission approved the Capper Seniors #2 building, approved for setdown the Capper/Carrollsburg 2nd stage PUD (which I believe means that basically they've agreed that they should have a hearing at a later date), and deferred the final vote on the stadium text amendment to the Capitol Gateway overlay, presumably until their October meeting. I'd be able to give you more details on all this, but I mistakenly believed the DCOZ web site when it said that Zoning Commission meetings are streamed live, and, well, this one most assuredly wasn't. Waaah!

More posts: 400m, Capper, Capper Senior Apt Bldgs, Nationals Park, zoning
 

The DC Office of Zoning has posted its agenda for the Sept. 15 meeting, and it includes the stadium text amendment for the Capitol Gateway overlay, as I expected. But they're taking up other Near Southeast items as well, both having to do with Capper/Carrollsburg. I'm not 100% versed in zoning minutiae (I might have made it to the 30% mark by now), so I'll just parrot what the site says, that the Capper/Carrollsburg 2nd Stage Planned Unit Development (PUD) and Modification is on the agenda. I believe that a second-stage PUD means a specific, fully engineered, plan for the site is being submitted for approval. So I hope that's something we can get a look at pretty soon. I would also think that this submittal means that the project may be kicking into a higher gear soon, as also evidenced by 15 building permit requests submitted at the end of August for addresses within the Capper/Carrollsburg boundaries.

There's also an additional agenda item for "Capper/Carrollsburg Venture LLC -- Senior Building," which I believe is a revision of the design of Capper Seniors #2, because the design submitted in 2003 included a blank wall along M Street, which is a zoning no-no in this area. The need for this vote was discussed at the Jan. 12, 2004 meeting, and is probably why the project's building permit application has the zoning section marked "Hold for Correction." (Yes, my head hurts, too.)

Speaking of second-stage PUDs, while wandering around on the web trying to educate myself on this topic, I found this 1999 National Capital Planning Commission document, showing the detailed plans for Florida Rock. However, that was then and this is now, and in December the Zoning Commission will be again taking up Florida Rock's second-stage PUD. So we'll have to wait and see what changes have been brought by six years (and a baseball stadium next door).

More posts: 400m, Capper, Capper Senior Apt Bldgs, Florida Rock, zoning
 

A couple of items so small I can't actually believe I'm posting them, but here they are anyway:
· It's not on the schedule for this Thursday's meeting, but it's quite possible that the DC Zoning Commission will vote on final zoning approval for the stadium text amendment to the Capitol Gateway Overlay. UPDATE:  Okay, now it's on the schedule.
· A "notice of environmental cleanup" sign in front of the property acquired by JPI on I Street says that the project will be two 13-story buildings with 700 residences and 600 parking spaces. Also, despite the fact that signs on the lot say 70 I Street, and that the tax parcel information is for 70 I Street, and that the lot is west of 1st Street, and that there's not one but two other lots on I with the "100" address, JPI is insisting on calling this 100 I Street. So I give up. Uncle. I'll call it 100 I Street. Under protest.
· Fences have gone up around the remaining abandoned Capper/Carrollsburg buildings, between 4th and 2nd Streets. No sign of impending demolition.
· A reader reports that pre-construction sales at Capitol Quarter (i.e., Capper/Carrollsburg) are now being delayed until Summer, 2006.
· The demolition a few weeks ago of the retaining walls behind the Carroll Apartments was not the beginning of construction of Capper Seniors #2 (the "wraparound" addition to the Carroll Apartments)--DCHA is still looking for a contractor for the project, so this is not likely to begin before the end of the year.
· For those of you wanting to know about any progress on Washington Canal Park, I've checked and there's officially No Progress.
More posts: 400m, Canal Park, Capper, Capper Senior Apt Bldgs, Capitol Quarter, Nationals Park, zoning
 

Also from the July 29 Register.... On July 6, the DC Council approved the issuance of revenue bonds of up to $11 million for construction financing for the Arthur Capper Seniors Building II project. This was done on an emergency basis for reasons that make my eyes glaze over when I try to figure them out, having to do with the DC Council's summer recess butting up against the DC Housing Finance Authority's need to close on the project before September or else be penalized by HUD for not using the Hope VI funds in a "timely manner." The text of the resolution is here (go to page 30 in the PDF). UPDATE: Looks like you need to first visit the main DC Register site before the link to the text of the resolution will work.

More posts: 400m, Capper Senior Apt Bldgs
 

On May 16, a building permit request was filed with DCRA for 400 M Street, SE. This would appear to be for the planned major addition to the Carroll Apartments low-income seniors housing (scroll halfway down my Seniors Housing page for renderings and details). This is the second of the two seniors housing buildings slated to replace the huge Capper Seniors building at 7th and M; the other is in the early digging-the-hole stage, at 5th and Virginia. (All can be seen on my Seniors Housing page.) For those of you who don't maintain your own Requested Building Permit Toteboard, right now there are initial permits pending approval for 400 M, 20 M, and 1015 Half Street.

More posts: 400m, Capper Senior Apt Bldgs
 

I note here that on Jan. 21 a building permit was approved for the new Capper Seniors project, described as a $17.3 million 160-unit apartment building for seniors at 900 5th Street, SE, and fences have now gone up around its lot at 5th and Virginia. Could they finally be about to start construction?

More posts: Capper Senior Apt Bldgs, Capper Seniors/900 5th St.
 
78 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8