Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper Senior Apt Bldgs
See JDLand's Capper Senior Apt Bldgs Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


78 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

You can't tell from the street, but there is some demolition-like work underway today on the roof of the old Capper Seniors building at 7th and M. However, the showy stuff with a wrecking ball will probably start later in the week, perhaps on Wednesday. It would be fab if folks who have a birds-eye view of the building could drop me a line if you see the wrecking-ball-crane getting into place, since the building is out of range of any handy web cams.
More posts: 600 M/Square 882/Old Capper Seniors, The Bixby, Capper, Capper Senior Apt Bldgs, The Bixby
 

As I posted a few days back, the old Capper Seniors building across from the Navy Yard is in its last days, and with hazmat abatement having been completed, the Housing Authority is on schedule to start demolition on Monday. And while I'm sure they had far better things to do, the powers that be were nice enough to escort me up to the roof for a few minutes of camera time to document the skyline from that vantage point. I also took a walk around the block for some last shots of the building, which has stood in this location since the 1950s.
You can see all of the day's photos here, with the overhead shots starting about a third of the way down the page. Remember as always that I use a somewhat wide-angle lens (a Canon Digital Rebel XT with an 18-55 lens for you shutterbugs), so you get to see more in the images at the expense of everything looking smaller and farther away than it really is.
After the demolition is done--it's expected to take two months--there will be a temporary surface parking lot installed. Eventually a 500,000-sq-ft office building by Forest City will rise on the southern half of the site, and hopefully they'll be nice enough to let me go up on that roof when it's done.
(And I must say that all these roof sojourns are wonderfully ironic, given that my legs go gooey if I even try to walk down stairs that don't have a handrail. So be assured I'm never as close to the roof's edge as it might look in some of these shots. I'm a total chicken.)
More posts: 600 M/Square 882/Old Capper Seniors, The Bixby, Capper, Capper Senior Apt Bldgs, The Bixby
 

After being vacant since the beginning of the year, the old Capper Seniors building at 601 L Street is in its final days, with demolition scheduled to begin the first week in November. Once the hazmat cleanup that's been going on is finished, the building, which opened in the late 1950s, will be brought down floor-by-floor (no Vegas-style implosion). I was inside the fences yesterday and between the raindrops got a few pictures of this building, though I hope to get some more before the final curtain.
At the same time the old building is coming down, the 139-unit new Capper Building #2 at 400 M Street is going to be opening its doors to residents. Originally designed as a building for low-income seniors, its profile has been expanded to also include renters who earn up to 60 percent of the area median income (from $38,000 for one person to $54,000 for a family of four). I was given a tour yesterday and got photos of the inside; the first floor has a community room with kitchenette, and laundry, computer, fitness, and conference rooms, and the landscaped interior courtyard also serves as a stormwater management system. The two-bedroom corner units at Fourth and M have some pretty nice views of The Yards and DOT (but I think they're all already spoken for). Twenty of the one-bedrooms and one of the two-bedrooms are for the mobility-impaired. A web site for the building will be launched soon, and there will be a rental office on-site. With Building 2's opening, there are 300 new affordable housing units now available in the Capper Hope VI redevelopment (with Capper Seniors #1 having opened late in 2006), with another 400 to come as mixed-income Capitol Quarter gets underway early next year, and the other mixed-income Capper apartment buildings planned for Second Street loom farther at some unannounced date in the future.
 

My Ballpark and Beyond column in today's District Extra of the Post covers the recent departure of AnA Towing to make way for DRI's Square 696 development; the raze permits for the old Capper Seniors complex and the buildings just north of the stadium along First and N streets; and the planned opening in September of the new Spay and Neuter Center at 1001 L Street. (I can't believe I made it through a column without a single piece about parking!)
 

After a week of days that were either overcast and drizzly or ridiculously hot and humid, today's sunny-and-warm profile gave me no choice but to venture out for a reconaissance mission. My report:
The masses of workers and the well-positioned fences make it nearly impossible to take photos of the current state of South Capitol Street, but I have added a decent photo to my Douglass Bridge makeover page showing the new South Capitol and Potomac intersection, which appears very close to being ready for traffic. Streetlights are in place, curbs have been built, paving has begun, and the historic globe streetlamps are installed all along the length of the bridge.
I also snuck a peek into the huge hole where Monument Realty's Half Street project is underway, and from N Street you can see what appears to be vertical construction is already underway at the bottom of the hole. It's along the M Street portion of the site, which will be home to the 55 M Street office building, which itself will contain the expanded entrance to the Navy Yard Metro station. Because that Metro work must be completed by Opening Day 2008, I guess it shouldn't be surprising that they're already pouring concrete and working upward, eight months into construction. The office building itself and the rest of the Half Street Phase I won't be completed until 2009.
And I unexpectedly found Demolished Building entry #138, as the beige garage that has long sat on the northeast side of the Half and I Street intersection bit the dust today, which I'm sure JPI is happy to see, given that 70/100 I Street is growing like a weed right next door.
Speaking of 70/100 I, it got updated photos today, along with Onyx on First and 100 M Street. You can look at those project pages (and their accompanying expanded archives), or you can browse this page showing all photos I've posted from today, which includes a few new shots of Capper Building #2, which I believe is just minutes from opening. And I even finally added a photo of the "Starbucks Coming Soon" sign out in front of the DOT HQ, for the caffeine-deprived.
 

Along with the Square 701 buildings mentioned yesterday, there are still a few buildings to be razed in Near Southeast (though not many, with 136 of them having already been demolished in the past four-plus years). None of them, however, are as big as the old Capper Seniors building at 601 L Street. All of its former residents have been moved out, and preparations are being made to bring down this building late this year, which will certainly be the most striking of all the demolitions I've watched. In the meantime, as you can see from the latest Approved Building Permit, interior demolition will be starting soon so that asbestos abatement can be taken care of before the building itself can be demolished. In its place there will eventually be a 500,000-sq-ft office building by Forest City, though no timeline has been announced; you can see a rendering of it on my old Capper Seniors page. In the interim, look for a surface parking lot to help ease the Nationals ballpark parking crunch. (Oh, and check out the new photo on that Stadium Transportation and Parking page. I just couldn't resist. I'm sorry.)
More posts: 600 M/Square 882/Old Capper Seniors, The Bixby, Capper, Capper Senior Apt Bldgs, The Bixby, parking
 

The DC Housing Authority is having a groundbreaking ceremony on Tuesday (June 26) at 11 am for the first phase of the Capper/Carrollsburg mixed-income townhouses (i.e., Capitol Quarter), at 4th and L by the EYA sales office. This isn't a signal for the actual start of "vertical" construction, though--that won't begin until later this year.
And maybe this makes for a good time to have a refresher on what exactly "Capper/Carrollsburg" is:
In 2001, DC received a $34.9 million Hope VI grant to redevelop the 23-acre 700-unit Capper/Carrollsburg public housing project as a mixed-income development, replacing every one of the low-income units and then adding to them another 700-plus market-rate and workforce-rate rental and ownership units. The redevelopment project is being handled as a joint venture by Forest City Washington, Mid-City Urban LLC, and the Housing Authority.
The townhouse portion of the redevelopment, being marketed by EYA as Capitol Quarter, will have approximately 121 market-rate and 91 "workforce"-rate ownership houses; an additional 65 townhouses will contain 111 subsidized rental units and Section 8 ownership units. The market-rate houses are already being made available for reservations in monthly blocks, with the attendant tent cities popping up at the sales center as hopeful homeowners stake their claims. There was a lottery back in 2006 for the first 20 workforce units; I imagine another will be coming before too long.
Three hundred low-income rental units have already been completed (or are about to be) as part of the new Capper Seniors #1 and Capper Building #2 projects. The rest of the public housing rental units will be included in four mixed-income apartment buildings planned along Canal Park, three on the eastern side of the park between 2nd and 3rd and I and M, and a fourth on the site of the DPW Trash Transfer lot at New Jersey and K. None of these are anticipated to start construction before 2010, so in the meantime, temporary surface parking lots will soon appear on those blocks to help ease the expected Nationals stadium parking crunch.
Additionally, 700,000 sq ft of office space will eventually be built within the Capper redevelopment area; 250 M Street is a 190,000-sq-ft joint venture between William C. Smith and the DC Housing Authority, and although it now has all of its zoning approvals, we just learned a few days ago that Smith is going to wait until the building is 30 percent leased before beginning construction. There will eventually be another 500,000 sq ft of office space developed at 7th and M on the site of the old Capper Seniors building (itself scheduled to be demolished late this year), but with no current timetable for that project a temporary surface parking lot is coming to that site as well. There will also be another 30-45 townhomes built along L Street behind these new office buildings, but those are a long ways off.
Topping it all off, a new 28,000-sq-ft community center is planned at 5th and K, replacing the one demolished earlier this year. It could start construction in 2008, but those plans might change if, say, a developer or the Housing Authority manages to snag from DCPS the Van Ness Elementary School site at 5th and M, which was closed in 2006 and is now administrative space. A new elementary school could be then constructed to serve families as they move into the rebuilt Capper neighborhood, and the community center could be part of the school rather than being a standalone project. But with the changes in the structure of the public schools' governance, who knows when any decision like this could happen, if at all. Just some Sunday morning speculation for you.
(This info has all been available on my Capper overview page, but it's good to get it out front once in a while.)
 

If you are coming here after reading this week's Ballpark and Beyond column in the Post, here are my information/photo/news pages on Capper Building #2, Capper Seniors #1, the old Capper Seniors building at 6th and L, and the entire Capper/Carrollsburg Hope VI redevelopment. And if you liked all those purty stadium photos displayed next to the column in the print edition, here's my Stadium Construction Gallery for plenty more of those....
 

The final touches are starting to be put on Capper Building #2, the wraparound addition to the Carroll Apartments at 4th and M. It's expected that new residents will start arriving in July, with full occupancy by the end of the summer. While this was originally planned as a building for low-income senior citizens, there was a modification to its zoning back in March to allow younger residents with lower incomes as well. Seniors who have lived at Capper / Carrollsburg but chose not to move to the new Capper Seniors #1 when it opened in December get first dibs on units in this second building, followed by other former Capper residents who meet the requirements of having an earned income and having participated in their community supportive services program. Applications are also being accepted from non-Capper residents who have incomes between 50 and 60 percent of the area median income (just under $38,000 for a single person or $54,000 for a family of four). If you meet the income requirements and are interested in applying, you can visit the BallparkApts.com web site for more information, or call 202-546-1024.
As for the old Capper Seniors building at 601 L Street, it is scheduled to be demolished sometime this summer late this year. Temporary surface parking lots will be built on the site in time for the opening of the ballpark in spring 2008, but long-range plans call for office buildings to be eventually developed there.
UPDATED 6/19 with the revised timeline for demolition of the old Capper Seniors building; it's now scheduled to happen toward the end of 2007, thanks to hazmat abatement needing to take longer than originally planned.
More posts: 400m, 600 M/Square 882/Old Capper Seniors, The Bixby, Capper, Capper Senior Apt Bldgs, The Bixby, zoning
 

Let's go around the horn and see what happened at last night's various meetings.
* The Zoning Commission voted to give final approval to the plans for 250 M Street, William C. Smith's planned 190,000-sq-ft office building on M Street just east of what will be Canal Park. The building, which is actually part of the Capper/Carrollsburg Planned Unit Development (and will help fund all the redevelopment at Capper), is expected to start construction at the end of 2007.
* ANC 6D had three Near Southeast items on the agenda--unfortunately, I wasn't able to attend, so I'm giving you the quick and dirty results, and will hopefully have links later for additional details. First, they gave their approval (again) to the 276-unit residential building planned by Camden Development at 1325 South Capitol Street, but this was pretty prefunctory since they approved it a few months back and nothing has really changed except a bureaucratic need to resubmit the plan to the Zoning Commission in a different manner; the ZC hearing is on May 31. Second, they voted not to support Zoning Commission Case 07-08, the request to amend the city's zoning laws to allow temporary (no longer than five years) surface parking lots on certain squares in Near Southeast to help provide parking for the new stadium. There was also a presentation by the DC Housing Authority on what's been happening with Capper/Carrollsburg and the Capper seniors buildings, but of course you've been reading this site religiously and so know it all already.
UPDATE: Apparently the feelings against the parking case ran pretty strong; and I understand that Andy Litsky of the ANC will be testifying in opposition at the Zoning Commission hearing next Monday (May 21).

 
78 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8