Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper
See JDLand's Capper Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


376 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 38
Search JDLand Blog Posts by Date or Category

For close to 10 years, there has almost always been something going on to photograph between 5th, 3rd, L, and Virginia. Between 2003 and 2007 there was the boarding up and demolishing of the old Capper/Carrollsburg dwellings and the construction of the two new Capper apartment buildings. Then, in 2008, work finally began on Capitol Quarter's mixed-income townhouses, starting at 5th and L and working northward then back southward.
And now, as 2012 comes to a close, the final batch of homes, on the south side of L between 3rd and 4th, have been completed, and with the photos I took Sunday, my work in the Capitol Quarter blocks is done.
There will be more to come at Capper--apartment buildings are still to be built on the empty lots between 2nd and 3rd, and on the trash transfer site, and at the old Capper Seniors site at 7th and L, plus office buildings at 250 M and 600 M--but until those get underway (timelines all currently unannounced), my days of traipsing around the old Capper footprint with camera in hand are at an end.
I've taken more than 5,000 photos of just this portion of Near Southeast, and while not all of them are on the web site, if you go to the Photo Archive map and click on a star or use the search form, you can follow the progression I've witnessed at the 14 Capitol Quarter intersections (such as the one above, showing the southwest corner of 4th and L from 2006 to 2012, and the one below, showing the northeast corner of 4th and K from 2004 to 2009).
The photos, of course, mostly just track the physical change, and don't really reflect how these blocks now have so much more foot traffic, so many more strollers, and so many more bikes (and so many more shades of pastels on the buildings!). The photos probably do hint at the, ahem, shift in demographics from a nearly 100 percent public housing community to a mixed-income area that includes some of those previous public housing residents alongside newcomers who've paid close to $1 million for their new homes, which probably still elicits a grumble here or there, though that's also an on-going discussion across the city, not specific just to Near Southeast.
But for those of us who saw what this area south of the freeway had looked like for so many years, there can still be moments of wonder that this redevelopment actually happened. It's been amazing to watch, and I'm so glad I got to see it up close from start to finish.
Comments (16)
More posts: Capper, Capitol Quarter, photos
 

A moment many people have been looking forward to (but which at least one person might be lamenting):
Yes, demolition has started on the smokestack at the DPW/Trash Transfer station at New Jersey and K. It'll take a few days, I was told, so you have a little more time to say goodbye.
Check back in a few, when I'll have some additional photos in the main photo archive (UPDATE: here's a few, from New Jersey and K). But here's a couple more showing the first bite taken out of the top of Ye Olde Smokestack:
 

A most interesting and welcome present arrived in my inbox recently: a reader passed along four photos taken in 1990 or 1991 shot from what clearly is the old Defense Mapping Agency/National Geospatial Intelligence Agency building at 1st and M, looking out over the streetscape of a veeery different neighborhood than what exists today. It was during the construction of the Navy Yard Metro station, and you'll see what a war zone M Street was for drivers and pedestrians.
There's familiar sites from the early days of my photo archive--Normandie Liquors, the On Luck Cafeteria, Capper/Carrollsburg, the school buses at Canal Park, and more, but there's also landmarks I either never got to photograph (like the old Tracks nightclub at 80 M) or only barely caught (like the Aamco station at New Jersey and M). The Ellen Wilson apartment blocks just north of the freeway on 6th Street are even visible.
But don't stop with the color photos at the top of the page. The rest of the page has a series of overhead images from the Library of Congress archive, taken in 1992, showing many of the same locations as the "new" color shots, along with some other spots, matched where possible with my images of the not-yet demolished buildings. I posted them almost two years ago, but I'm sure they're new to plenty of people.
If you happen to have taken any photos of the neighborhood from pre-2003 that you'd like to share, I'd love to see them. Feel free to pass them along via whatever venue you might prefer--Facebook, e-mail (dc at jdland dot com), Flickr link, etc.
Comments (4)
More posts: Canal Park, Capper, photos, Rearview Mirror
 

Sending the old trash transfer station building on New Jersey Avenue to the big trash transfer station in the sky that's been almost as anticipated among residents as the departure of the school buses from the Canal Park site a few years back, and action over the past few days seems to indicate that the end is almost upon us.
The glass blocks came out of the large window areas last week, and some big chunks came out of the building's north side this morning, though then the work came to a halt. But even if it's not gone within the next 24 hours, clearly the clock is finally ticking, as you can see in the photo at right (see enlarged version).
If you're already feeling nostalgic for the structure, my photos of the building's interior and exterior taken a few weeks ago could ease your pain.
 

On Monday night, the Zoning Commission voted 4-0-1 to approve DCHA's request for a second two-year time extension on the PUD deadlines to build the Capper Community Center on the now-empty lot on 5th Street SE between K and L. With this vote, building permits would need to be filed by July 1, 2014, with construction needing to be underway by July 1, 2015, provided another extension isn't someday requested and granted.
The extension received votes of support from both ANC 6B and ANC 6D, and a letter from a steering committee of Capper public housing residents also expressed support. Commissioner Peter May, referencing the "contentious" discussions in the past regarding this project and his own unhappiness about seeing it delayed, said it was "reassuring to know that key members of the community are supportive," otherwise he would be "similiarly unhappy." But he did vote in favor of the extension, as did Chairman Anthony Hood and commissioners Marcie Cohen and Michael Turnbull. (The commission's fifth seat is currently empty, with vice chair Konrad Schlater's recent decampment for a new job in Chicago.)
Included the paperwork provided to the Zoning Commission is a letter from DC Housing Authority executive director Adrianne Todman detailing the various high-finance moves over the past few years that have helped the overall Capper redevelopment move forward but that haven't trickled down to fund the community center. The letter says that the Housing Authority anticipates a $55 million bond issuance within the next year that will pay off the previous $29 million Bond Anticipation Notes and provide enough proceeds to continue the infrastructure work around Capper "and to construct the community center, which we estimate will cost $7.6 million." These moves require legislation, so we'll be able to cast an eye toward the DC council this fall to see if things are progressing as anticipated.
Also in that letter is this tidbit: "Lastly, DCHA is working with and soliciting a potential anchor tenant that will operate the community center and also contribute funding for the construction of the community center." Very interesting....
If you want to know still more about the history of plans for a new community center on this site (the old one was demolished in 2007), I point you to this pile of posts.
Comments (10)
More posts: Capper, Community Center, zoning
 

It's summer, and I'm trying to be on a Word Diet, so lots of links, but short and sweet:
* This week's Front Flick, O Brother, Where Art Thou?, tonight at Tingey Plaza.
* Another installment of Truckeroo on Friday.
* One potential candidate for Near Southeast's two ANC single member districts has already picked up nominating petitions: Ed Kaminski, who lives in 6D02.
* Washington Examiner is hot on the Hood. Times two. Shorter version: more people coming (like Nats fans). More stuff coming. But you knew this already.
* Miniature golfing in Canal Park, in a manner of speaking.
* Reunion of Arthur Capper residents last week at Garfield Park.
* There's now lane restrictions on M Street SE between 7th and 11th for the next, oh, 27 months or so, thanks to the DC Water Clean Rivers Project. (This is also why Water Street east of 12th Street is closed.) The work along M got off to a bit of a rough start last month when contractors took over the pocket park at 8th and Potomac without using a particularly light touch.
* Nats Park in the mix for the 2015 MLB All-Star game, but lots of other cities want it, too.
* Across the way: new DC United investors "should boost quest for stadium" at Buzzard Point.
* At least SOME major media organizations know how to credit scoops. {Said while glaring at WashBizJ, though not PhilBizJ}
* Folks at 909 New Jersey, and also 1980s DC nightclubbers, might like this WaPo photo. Especially when compared to this. (The railroad tracks are probably not missed.)
 

It's not exactly a palace, but it would have killed me had the old trash transfer station/DPW site at 900 New Jersey Ave., SE, been razed without my ever having gotten inside the fences with my camera.
Since the demolition countdown clock is now ticking (though no one wants to commit to an actual *when*, other than "near-term"), I finally got to traipse around the 1920s-era building on Tuesday.
I took far more photos than the building probably warrants, but the historical record must be served.
Out of the torrent of images, I bring you two galleries, one of shots from inside the building's two levels (including into quite a few spots that were pitch black until my flash went off. {shiver}), and one from the walk around the exterior, since I had never gotten fence-free access to it before.
I even got to peek down into the first of the five 60-foot shafts being dug along New Jersey Avenue and then beneath the eventual I Street footprint in order to move a very big and very deep pipe. That work has to be completed before construction can begin on the Park Chelsea apartment building just to the north of the trash transfer station.
As for the station's lot once razing is complete, it could be a temporary parking lot until the eventual construction of a mixed-income apartment building that's part of the Capper-Carrollsburg redevelopment. All of this presuming that no one decides to lay in front of the bulldozers to prevent the building from being torn down.
 

(This should definitely be filed under Information That Would Have Been More Useful Two Days Ago, but it's not like it's not still hot and won't get hot again.)
I figure that most parents of small children in the Near Southeast/Capitol Hill/Southwest metroplex are already aware of this, but it's still worth mentioning that DC Parks and Rec's Lincoln Capper Children's Pool at 555 L St., SE, is open again this summer, offering splashing opportunities from 10 am to 6 pm Wednesday through Friday (with a half-hour break from 2:30-3 pm), and on Saturdays and Sundays from noon to 6 pm.
The fountains and wading pool at the Yards Park are now probably a bigger draw, but this additional offering brought to you by your tax dollars shouldn't be neglected, especially if it's too hot to walk down to 3rd and Water or if it's during the times each week when the fountains are off.
(There's also the pool scene at the Capitol Skyline Hotel, but that's slightly less kid-friendly than when I was a kid.)
Has anyone been to Lincoln this season?
Comments (1)
More posts: Capper, pools, recreation
 

Although the temperature was a bit high for my liking, it still felt good to take a walk with camera in hand for the first time since April around Canal Park and Capitol Quarter to get a new batch of photos. And, thanks to the planting of numerous trees along with other visible improvements, my months and months of complaining about not really having much to photograph during the park's construction have come to an end.
With the arrival of the trees and some initial streetscaping now in place on the portion of L Street that runs through the park, you can now see how narrow the street is going to be in order to work to slow vehicular traffic as it crosses the park. (The completed streetscape will also give a visual cue to Slow The Hell Down.) K Street will get a similar treatment.
So check out the slew of progress shots on my Canal Park project page. And I do also recommend a run through my Expanded Canal Park photo archive, to make a time-traveling virtual visit to the park's three blocks, which will get you comparison shots like these:
(Southeast corner of 2nd and K. I love the first shot, from nearly nine years ago, with lots of school buses and without USDOT.)
The official Canal Park web site can also give you more information, along with these slides from a presentation at last month's ANC 6D meeting. Though, judging from the people who chatted me up while I was poking my camera through the fences, we're long past the "what" stage and deep into the "when" ("WHEN!?!") stage. An opening in November is still the target.
Meanwhile, on Capitol Quarter's last block, framing has now gotten underway on 4th Street, with bricking and painting finished on the houses on the 3rd Street side. My suggestion is to scroll through the Capitol Quarter Phase 2 Expanded Photo Archive, because I can't imagine at this point the before-and-afters need much narration.
(Southeast corner of Third and L, in December 2004 [through the windshield!] and today.)
Comments (4)
More posts: Canal Park, Capper, Capitol Quarter, photos
 

The agenda for the June 11 ANC 6D meeting has been sent out (and hopefully posted soon). The big-ticket item is a vote on the Stage 2 PUD for the Southwest Waterfront plans, which I doubt will be a lightning-quick discussion--when the agenda has it budgeted for 90 minutes, you know it's gonna be long.
But there are also two Near Southeast items of interest listed: an update on baseball game-day parking from DDOT (first discussed at the May meeting) and the Capper Community Center PUD extension request (also discussed in May).
I'm not yet up to sitting through a meeting of that length (though I'm coming along), so if these items are of interest, get thee to 1100 4th St. SW at 7 pm on Monday.
 
376 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 38
Search JDLand Blog Posts by Date or Category