Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper
See JDLand's Capper Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


376 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 38
Search JDLand Blog Posts by Date or Category

Apologies for the torrent of words that follows:
* ANC Meetings: The agenda is now out for Monday's meeting ANC 6D meeting. In addition to the Capper apartments time extension request I just wrote about, there will be a discussion of the proposed Single Member District boundaries for 6D. (Ditto on both counts for the ANC 6B meeting the next night.) There is also an agenda item on the proposed renaming of both the Navy Yard and Waterfront-SEU Metro stations, with a DDOT representative. The 6D meeting is at 7 pm in the DCRA offices at 1100 4th St., SW, 2nd Floor.
* Changes to P1/P2/P6 Buses: WMATA has come up with a list of proposed changes to bus routes, and one of them would eliminate the P1 and P2 buses that run along M Street SE during rush hour and would re-route the P6 bus down M Street SE to 4th Street SW, away from its current route that runs along Virginia Avenue and through the southern part of Capitol Hill before heading to Federal Center SW and then across the Mall and into downtown. This could impact the residents of the Capper Seniors building at 900 5th St., SE, which has an eastbound stop right on its corner. (I'd also note that the planned closure of Virginia Avenue south of the freeway for two-plus years would necessitate a rerouting anyway.) And, in the interest of full disclosure, I'll say that this rerouting would have an impact on the JDLand household, since we often use this bus (which stops right at our corner) to get to and from downtown. This is not final yet, with public meetings on this and the other proposed changes still to come.
* NCPC Doings: Last week the National Capital Planning Commission approved by consent Forest City's plans to temporarily put their offices in the second floor of the Lumber Shed building at the Yards Park. NCPC also approved an installation of solar panels at the Navy Yard, while humminah-hummining that though the commission had said back in 2010 that "no future submittals at the Washington Navy Yard will be considered until an updated master plan is submitted," they decided that "this proposal is a minor one that does not increase the population at the installation, does not include any interior space, will have 'no adverse effect' on historic resources and is comprised of elements that reduce the installation's energy consumption." Plus, the report says the commission staff has been meeting with the Navy and expects a draft document for updating the Navy Yard master plan to be submitted to NCPC by the end of this year.
* Beer! And a Cookout: In tastier news, the folks at Harry's Reserve tell me they are now approved to sell single beers, and already are building their inventory of 32-40 oz craft beers, imports, and the like. Meanwhile, the Great Heartland Cookout is happening on Saturday at the Yards Park, benefitting the Fisher House Foundation, which donates "comfort homes" built on the grounds of major military and VA medical centers for families of hospitalized service members. Cookout tickets start at $40.
* Crime At Capper, Before and After: The Urban Institute has published "Movin' Out: Crime Displacement and HUD's HOPE VI Initiative" that uses the crime statistics around Capper and other DC rehabilitated public housing communities to show that crime not only remains low in the immediate area after a HOPE VI renovation, but is lower in nearby areas as well. The report is a bit hard to read (I have to admit I gave up pretty quickly), but MetroTrends gives a good summary. You can also look at the crime statistics I've archived since 2005 to see how crimes in the neighborhood have changed over the years, while keeping in mind that the initial move-outs began at Capper in 2003. (The huge spike in Theft from Autos in 2006 was mostly a result of the neighborhood being empty except for the cars of construction workers, which were then pretty easy pickings during the daytime when they were busy at Nationals Park or the other projects at the time.)
* Waah Waah Waah: And, speaking of the crime statistics.... I have been downloading those reports from the city's Data Warehouse on a near-daily basis since they were first made available as XML feeds. I've also been able to get Public Space Permit Applications and Approved Building Permit Applications via XML for a number of years, and the many data feeds that were created are something that the city received numerous accolades for during the Fenty administration. However, the Public Space Permits feed now has not been updated since mid-July, and the Building Permits feed hasn't been updated since August 23.
Multiple e-mails to the data warehouse e-mail address have gone unacknowledged (after years of pretty prompt response, even if it was just to say "we know, we're working on it"). The Twitter accounts for both the Data Warehouse project and for OCTO Labs are equally moribund. I've let DCRA and DDOT know about the problems with the feeds, since they are the originators of the data, but if these data feeds are going to go to seed it's going to be a real loss for having easy access to this sort of data (even if I'm probably one of the few people who's ever bothered to take advantage). And, if the data isn't dying and is just getting worked on, a little bit of communication would go a long way (like, say, replying to any of my e-mails). Hopefully the crime feeds won't suddenly stop working, since that one certainly gets the most interest of any of them. (My complaints about the loss of depth in the city's web site offerings after the big redesign are for another day.) Just wait until OCTO moves into 225 Virginia next year and I can start picketing out front.
 

The DC Housing Authority has filed a request with the Zoning Commission for a time extension to construct the mixed-income apartment buildings it has planned for the north half of Square 882 (the old Capper Seniors block along L Street between 5th and 7th, seen at right) and the north half of Square 769, between 2nd and 3rd on L just east of Canal Park (below, the building at left, next to the proposed 250 M Street).
When the plans for these two buildings were approved by the Zoning Commission in 2009 (see the zoning order), it was required that building permits be applied for by August of this year, with construction to begin by August of 2012. However, attempts at funding either the Square 882 189-unit building or 171-unit Square 769N building the have not thus far borne any fruit, and so a time extension is needed. Between them, the buildings would have 72 units reserved for households making less than 60 percent of the area median income, and the Square 769 building would also have just over 4,000 square feet of ground-floor retail space.
The Zoning Commission will hear this request at its meeting on Monday night; because there is no request to modify any portion of the PUD beyond the time requirement, this will most likely be handled as a consent calendar item. There will also be a presentation on this request and the state of the Capper redevelopment in general at Monday's ANC 6D meeting. (There was also one given at Tuesday night's ANC 6B's Planning and Zoning Committee meeting, but I had a baseball game to watch.) But since the Zoning Commission hearing is at the same time as the 6D meeting, it would seem that there is no anticipated opposition from 6D.
The Office of Planning prepared a short report recommending approval of the time extension, showing that the requirements for an extension have been met. It also quotes the development team as saying that there have been 75 outreach efforts for financing, all unsuccessful. "The inability to secure financing for residential projects, especially those including affordable units, is not unusual in the current marketplace."
If you want to know more about these two planned apartment projects, and the other three mixed-income buildings planned along the east side of Canal Park and on the DPW/trash transfer site, my Capper Apartments page has additional background, as do the scads of blog posts I've written on the various plans. And my main Capper page has the background on the entire redevelopment project.
UPDATE: And, of course, within seconds of my pulling the trigger and posting this entry, I've received a copy of the letter to the Zoning Commission requesting the PUD. Which I'm posting before reading.
 

I'm anticipating that the next couple of weeks will be pretty quiet, at least the Foundry Lofts start their pre-leasing on Aug. 15, followed by the Ward 6 Redistricting Task Force release of its first draft of proposed new ANC/SMD boundaries on or about Aug. 18. So here's a bit of a potpourri, and then I'm going to probably take a blog-breather unless really big news breaks. (As always, I'll still be popping up on Twitter or Facebook with tidbits here or there.)
A smidge belatedly, I've added the three garages demolished a week ago on the southeast corner of 1st and K to my Demolished Buildings Gallery, as entries 163, 164, and 165. (It might soon be time to create a Not Demolished Gallery, which would be far far smaller.) I was surprised when digging in my archives to find a couple of photos of the garages still in operation (above), from 2006 and 2007. You can also see how that stretch of 1st has changed since 2003, looking south from K and north from L.
I also grabbed a quick photo of the progress on the new bridge bring built by the city that will link Diamond Teague Park to the Yards Park, scheduled to be completed this fall. (And I guess it's time to also officially get rid of the "floating bridge" nomenclature, because, as we've seen for months, there are big ole' piles in the river.) It'll be interesting to see if usage of the First Base Gate at Nationals Park at 1st and Potomac increases noticeably next season with this new riverside walkway available. (It will also make arriving at Teague Piers via water taxi to attend events at the Yards Park involve a much more enjoyable walk, compared to schlepping up to N Street and over.)
And, with people now moving into the first completed houses in phase two of Capitol Quarter, I updated my photos of 3rd Street between I and K. And it reminded me how the intersection of 3rd and I has become quite an illustration of change in all directions, with not only new townhouses replacing old public housing but also seeing lots of new high-rises in the distance. (The White Monolith that was the old Post Plant on the northwest corner getting a facelift is an added bonus.)
If you're looking for other links to help kill time over the next few weeks, take a look at the JDLand Headlines to be sure you haven't missed any big items lately.
 

With raze permits for the old structures along 1st Street SE between K and L finally approved in mid-June, the days were truly numbered for the Market Deli and its neighbors, and today the demolition got underway, with most of the rear section of the Deli's structure knocked in. Fences are up all around the 1st Street structures, which are all owned by Akridge, and with this initial wrecking underway I imagine it won't be long until the five buildings are added to my Demolished Buildings Gallery, as entries 161 through 165.
There's a few more images here, showing that the demolition isn't quite so obvious from 1st Street (yet). Also, hopefully the folks who have been tending to the cats living in the abandoned building can report in as to their fate. (I heard a rumor that some kittens were removed today, but would defer to an update from anyone with more knowledge. UPDATE: In the comments of another post, reader jenniferp says that five very young kittens were indeed captured this morning, but there are several more still on the loose.) And, if you haven't been following along on the tale of the Market Deli for the past few years, here's some enlightenment.
And, because it would have been silly to wander down there in the ghastly heat and humidity and walk past a whole lot of spots where I needed to take updated photos, you can see the latest progress at 225 Virginia (aka 200 I Street) and the second phase of Capitol Quarter, where framing is being completed on the last portion of its first block, along Fourth Street.
 

Just arrived this morning is a copy of the raze permit application for 900 New Jersey Avenue SE, far better known as the trash transfer site, where the city's Department of Public Works has operated out of for many years. The block is part of the footprint of the Capper/Carrollsburg redevelopment, and is slated to eventually become a 320-ish-unit mixed-income apartment building.
Its demolition will allow for the construction of I Street between 2nd and New Jersey, which also paves the way for William C. Smith to be able to start on its planned residential project just to the north at 800 New Jersey.
The DC Housing Authority will be handling the demolition, which won't happen until a new DPW home is constructed in Northeast, though they are hoping that the move happens before the leaves start to fall. And then there will need to be environmental abatements on the site, which has had trash-related operations on it for a long long time.
And apparently ANC 6D07 commissioner David Garber won't be trying to landmark the smokestack after all. (Read this comments thread for the background on that.)
 

While the number of photos I took while in Spain and Italy should have been enough to tide me over for quite a while in the camera department, the guilt at not having taken Hood photos since APRIL (!) shoved me out the door on hot and hazy Sunday morning (ick) for a walk around the major activity zone between 2nd and 4th Streets.
The re-dressing of 225 Virginia/200 I/Old Post Plant/Old Star Plant continues, with most of the north face now sporting the building's new look; some windows have even been installed on the east front, facing 3rd Street. It's expected that the exterior work will be done by early 2012, with tenants from three city agencies starting to move in about a year from now. My 225 Virginia project page has a guided tour of the project, or you can take the virtual walk-around-the-block for a bigger batch of before-and-after photos to watch the building's transformation from Big White Monolith to 21st century office building.
In the meantime, work is speeding along at Capitol Quarter, where the block bounded by 3rd, 4th, I, and K (bisected by the soon-to-be-birthed 3rd Place) has construction in all phases, from the nearly completed houses at 3rd and I to the new framing at 4th and I, and foundations now poured at 4th and K. And, as briefly mentioned a few days ago, the trailer that housed the original sales center at 4th and L is now gone. If you just want the short version of Capitol Quarter's second-phase transformation, check out my Capitol Quarter project page, otherwise you can take the virtual walk around the blocks now under construction for a boatload of before-and-afters.
I also took some photos of the northern perimeter of Canal Park, but pictures of fences and digging equipment are never terribly exciting.
As always, remember that the Click to see all available photos of this location. icon on any page gets you to the full batch of photos I've taken at any location. Or, if you're interested in only a certain location, you can use my Photo Archive map to get right to it. The entire set of 178 photos I posted today can be seen all at once, too, if you're so inclined.
(And, as an aside, let me send my huzzahs to Microsoft for getting fixed in IE9 whatever it was in IE8 that would cause the browser to stop displaying local hard drive images after a certain amount of page loads, causing me to having to restart the dang thing eight or nine times during each photo archiving stint. [It's pretty much the only thing I still use IE for.])
 

I'm back in DC, having spent 11 wonderful days in Madrid, Barcelona, and cruising across the Mediterranean to Pisa, Florence, Rome, the coast south of Naples, and Mallorca. Needless to say, while I checked in on the news back home from time to time and tweeted an item or two if the timing was right, I wasn't following developments closely, and I'm pretty out of the blogging groove at this point. So I'm going to start back slowly with some easy items.
* Redistricting: The city council voted Tuesday to approve a redistricting map that, as expected, keeps Near Southeast in Ward 6. This continues to make Marion Barry extremely unhappy, and the Examiner reports that he'll be "asking U.S. Attorney General Eric Holder to open a Justice Department review of proposed new D.C. ward boundaries because, Barry says, they violate residents' civil rights." There's still a final vote to be had on the plan, probably on June 21. As for the last-minute changes that ended up keeping much of Ward 6 intact (moving Reservation 13 to Ward 7 instead of other areas), you can read Tommy Wells's blog for more details.
* Riverwalk: The Navy Yard announced last week that its portion of the riverwalk along the Anacostia River, running from the 11th Street Bridges to the Yards Park, will now be open from 5:30 am until "official sunset," seven days a week and including holidays; though there will still be closures as needed, which are announced on the Navy Yard Riverwalk Twitter feed. (I admit that I got a bit of a kick passing along this news via Twitter while riding on a train north of Rome.)
* DPW Move: The council passed emergency technical legislation on Tuesday that allows Capper PILOT funds to be used to build a new location for DPW operations in Northeast, which means that they should be moving from the 2nd and K site this fall (before "leaf season").
* Ward 6 Family Day: Tommy Wells's yearly event for Ward 6 residents will be held on Saturday, June 25, and will be at the Yards Park for the first time. It's from 1 to 5 pm, with "free food, live music, games and activities for the whole family as well as raffles featuring gift certificates from local businesses and sporting memorabilia from the Wizards, DC United and Washington Nationals."
* ANC 6D has its next meeting on Monday, June 13, at 7 pm at Arena Stage. The agenda is light on Near Southeast items, with only a resolution by David Garber about Near Southeast bike stations and requests by Cornercopia and Harry's Reserve to be exempted from the ban on the sale of "singles."
* Food Truck Festival: Bo Blair, the owner of the Bullpens and the organizer of Truckeroo on June 3, said in an e-mail that the event was a "massive, incredible success," with somewhere between 17,000 and 18,000 attendees and "zero problems." The next date for the event will be announced soon.
* Construction and Destruction: Construction has stalled on the Little Red Building v2.0 at 2nd and L, which ANC commissioner Garber says is a "building permit issue that is in process of being resolved - construction should start back 'soon.'" Meanwhile, the "re-dressing" of 225 Virginia is well underway, with the new exterior walls being hung on the north side of the building. And if it hasn't already happened, the trailer that was the original sales office for Capitol Quarter is being torn down, since construction of townhouses is now underway on that block. (Photos to come, at some point.)
* The Yards on Facebook/Twitter: I kind of stumbled across these (never saw any announcement about them), but the Yards now has an official Facebook page (which is available on Twitter, too) along with a separate one for the Foundry Lofts (its Twitter account is protected, though).
UPDATE: And, since this just came across Twitter: Dan Steinberg reports that Shake Shack and the other new Nats Park restaurants will open next Tuesday, the beginning of the homestand vs. the Cardinals.
 

On Tuesday morning the Board of Zoning Adjustment voted to approve three exceptions and variances that will allow the Capitol Hill Day School to use the currently empty lot at 5th and K streets SE as a temporary location for its operations while its Dent School building at 2nd and South Carolina undergoes renovations.
This move, which has the support of ANC 6D and the Capitol Quarter Homeowners Association, would bring a "modular building" to the site this summer, with the school's expectation that it will return to the Dent building in early 2012.
There will be no on-site parking, but the school is leasing 29 parking spaces in the big parking lot one block to the east, on the site of the old Capper Seniors building (Nats lot "W"). And the Office of Planning report on the application says that DDOT has "agreed to prohibit parking between mid-June 2011 and the end of January 2012 on school days between 7 am and 6 pm on the east side of the block [...] in order to facilitate the drop off and pick up of students." (I'll note that this 7 am start time is one hour earlier than what was announced at the ANC 6D meeting where this plan was discussed.) CHDS representatives also told 6D at that meeting that they will be asking parents coming from north of the freeway to drive south on 4th, turn left on L, and then turn left on 5th to pull into one of their four drop-off spots, where students are then guided out of the cars. (Buses will pull in and out of these spots as well.) The spaces will be available for parking after 6 pm and on weekends and holidays.
There were few questions from the board; Commissioner May did ask whether this plan will negatively impact the long-delayed plans for the new community center to be built on the site. The current requirements placed on the community center project by the Zoning Commission as part of the Capper PUD are that the Housing Authority must apply for a building permit by July 1, 2012, and that construction must begin no later than June 30, 2013, dates which are far enough in the future to not be delayed by the Day School's occupation of the site.
The commission then voted to approve the requested relief; but, after a representative from the city's office of the attorney general raised some concerns, the hearing then devolved into a long technical and legal discussion of defining which conditions of a previous order were being addressed, which I totally admit to bailing out of. But in the end the project was still approved. You can watch the video of the hearing when it's posted if you want more information; and the Office of Planning report is also a very good resource for the zoning issues, plus there's a drawing on page 3 that shows how the temporary building will occupy the lot.
The Day School has a blog with information about the renovation project, and I imagine they'll pass along soon more details about when work will start at 5th and K.
Comments (0)
More posts: Capper, Community Center, meetings, zoning
 

With the sun finally coming out, it shouldn't be surprising that I took camera in hand on both Saturday evening and Easter Sunday and did some wandering to catch up with the progress at two locations, and to get shots of a few new items I hadn't yet documented.
The old 225 Virginia, on its way to becoming 200 I (boo), is now almost completely disrobed. (I think I'll go with that from now on rather than "deskinned.") It's been such a monolith for so many years that it's strange to see it broken up. You can take a virtual walk around the block to see how the old Star/Post plant looked before along with its current state, and visit my 225 Virginia project page for more info and background. (If you haven't been following along, by this time next year 200 I is expected to be nearly complete, with three DC city agencies on the boards to move there.)
Just to the southwest, work continues on the first block(s) in the second phase of the Capitol Quarter mixed-income townhouse development, with bricking proceeding on the new houses along I Street while framing has made it around and up the new 3rd Place; plus, foundations have now been poured along 4th Street. Here's your walk around the block to be reminded of the old public housing units that stood there for a long time and to compare them with the construction going on now. For more information, see my Capper and Capitol Quarter project pages.
(If you want to see just the new photos taken Sunday, here they are in one batch.)
Meanwhile, down at the Yards Park, the flowers are in bloom, a geodesic dome that looks like the Earth is hosting foodies, and work appears to have begun on the floating bridge that will connect the Yards Park to Diamond Teague Park (right by Nationals Park) later this year. You can see my quick gallery of photos showing these items, along with a picture of the sign laying out the rules for using the Navy Yard portion of the riverwalk (since it was Saturday, I could only stand forlornly at the gate and look eastward), plus the progress on the Foundry Lofts building just to the north of the park. And some shots of the Navy Yard buildings that are adjacent to the park, just because I like being in a spot where I can take photos of them without having guards chase me down the street.
 

Saturday was a lovely day for taking a couple of walks with camera in hand, and with work underway at locations that couldn't be any closer to my out-of-neighborhood house, I had no excuse to not get some updated photos of 225 Virginia/200 I, Capitol Quarter Phase 2, Canal Park, and the Little Red Building. (It was also nice chatting with the folks who correctly guessed that the oddball standing in the middle of the street taking photos must have been me.)
The showy demolition work is now well underway at 225 Virginia/200 I, and if the few shots and renderings on the project page aren't enough for you, you can do a virtual walk around the block to see which walls and windows are blown out at this point and to compare the current images with their "befores."
No time is being wasted at Capitol Quarter, where framing has now wrapped around from I to 3rd to K Street on the first block of Phase 2. You can take a "walk" around that block, too, if you haven't lately, or wander through the project page, both of which have plenty of images of the old Capper public housing buildings that were on this block for a very long time. I also added to the database some photos of what will eventually be the intersection of 3rd Place and L, once the new street gets built through its second block south of K. If you're big on old Capper photos, there's a few "before" images of L Street buildings in that sent that haven't been displayed on the site before now.
If photographs of fences are your thing, take a "walk" around the Canal Park perimeter, to see many pictures of the "traffic control" now in place in advance of the start of construction on the park (presuming it ever actually comes). Those barriers are going to put a crimp in some of my standard shooting locations for the next year or so, including where I've stood for the past eight years to take photographs of the Little Red Building, which in its new incarnation is now more of a brick red than the beet red it used to be. ANC commissioner Garber posted on Friday that the roof is going in over the next few days, at which point work on the interior can begin, as it slowly progresses toward becoming "Lot 38 Espresso."
Remember that the Click to see all available photos of this location.icon on any page gets you to the full batch of photos I've taken at any location (which, since I'm getting into the eighth year of doing this, can be kind of voluminous in some spots).
(I know that It seems kind of odd to still be posting photos when so many readers now live in the neighborhood, which of course wasn't always the case. But it's my schtick, and so I continue onward! Plus. there are plenty of people interested in Near Southeast who don't wander around every day--or maybe some of the residents don't know what these spots used to look like before....)
 
376 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 38
Search JDLand Blog Posts by Date or Category