Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper
See JDLand's Capper Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


376 Blog Posts Since 2003
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 38
Search JDLand Blog Posts by Date or Category

With the opening of the 2010 season at the ballpark and lots of other interesting news of late, my blogging time and focus has been geared toward these bigger items. But there's a fair amount of little stuff that I point to every day on my Twitter feed (also available on Facebook), mainly news stories that might be of interest but that aren't really important or newsy enough to devote much more than 140 characters to. I may eventually transition to leaving those completely to Twitter, but I still feel guilty enough for now to round them up here on the blog every so often. But if you're wanting all news items at warp speed, best to start reading the Tweets.
* EYA has passed the news to me that all Capitol Quarter Phase I townhouse units are now sold. They are gearing up to begin sales of the Phase II houses, which will start "soon." (Though I wouldn't take your tent down to their sales office just yet.) I imagine they will do the releases of these next houses in groups based on location, as they did with phase I. It's still expected that the entire townhouse development will be built out by the end of 2012.
* Last weekend Bisnow took a walk around the neighborhood with a camera (a novel idea!), and gave their readers an update on some of the projects. The only section that I've not seen reported before is Akridge now saying that construction for their 700,000-sq-ft mixed-use Half Street project is now pegged at "hopefully before next baseball season," likely meaning 2011. But, "once shovels hit the dirt, the one residential and two office buildings will likely go up at once," Bisnow quotes an Akridge rep as saying. It also says that Forest City is "hoping" to get started on the Boilermaker Shops retail renovation at the Yards before the end of this year. (Lots of "hoping" going on!) There's even a picture of the Pillsbury Doughboy that gazes out over the neighborhood from Capitol Hill Tower.
* Voice of the Hill says there's a possibility of a temporary dog park being installed at the Virginia Avenue Park (Ninth and Potomac, SE), at least until CSX starts on its tunnel construction project (more on CSX coming in another post later today). This is coming to the forefront because the principal of Tyler Elementary has now banned dogs from the school's playing field.
* Some neat overhead photos from DDOT showing the progress on the 11th Street Bridges construction. I'm hoping to get some ground-level images myself before too much longer.
* CNN reports on how Nationals Park has become a very hot venue for political fundraising, actively pursued and encouraged by the team. "[F]ederal candidates, major political parties, and political action committees have spent at least $432,000 on fundraising events either at Nationals games or at their facility, according to campaign finance documents filed with the Federal Election Commission."
 

* The Marines have posted the slides and handouts from this week's workshops on potential sites for their new barracks. If you didn't see my update, here's Norm Metzger's additional take on Tuesday night's meeting.
* MPD's PSA 105 is having its monthly meeting on Saturday (March 27) at 10 am at the 1D substation at 500 E Street, SE.
* The Washington City Paper's annual "Best Of DC" issue is out, and Near Southeast gets a couple of nods: Cornercopia was given a Staff Pick for Best New Bodega, Capitol Quarter is the Readers' Pick for Best Designed Residential Development, and the 11th Street Bridges reconstruction gets a Staff Pick for Best Construction Project. Alas, this also means that now my year-long reign as Second Best Local Web Site (and "favorite nasty local blogger") has come to an end.
* The Washington Project for the Arts is holding its "WPArade" in Near Southeast, on June 5 at 12 pm along Half Street from M to N. This parade, modeled after similar events in other cities, "is an extravaganza of artists connecting with community to create a moving visual spectacle of art and culture." They've got a call for participants out, and it notes that "participants can traverse the route in any manner that is non-motorized (wagons, bicycles, walking, etc. are acceptable)." It'll culminate with a party at the Bullpen until 3 pm. Who will be the first to enter a giant papier-mache Stephen Strasburg?
 

A few days ago, WBJ reported Deputy Mayor Valerie Santos saying that Canal Park "will move forward" in June. With the previous comments on the park's timeline indicating a September start of construction, my curiosity was piqued, so I contacted the park association's executive director, Chris Vanarsdale, to find out the latest. To wit:
At this point, work is continuing on the design documentation, which is expected to be completed in June, and it's still expected that construction on the park itself will begin in September. However, the plans now also include $1.5 million of infrastructure work beneath Second Place (the road that runs on the eastern side of the park), which will be paid for out of the $29 million in Capper bonds that are hitting the market this week. (This wouldn't appear to be any sort of evil cost-shuffling by the city, since Second Place runs along blocks that will eventually house three Capper apartment buildings and WC Smith's 250 M Street office building that is also technically part of Capper's Hope VI redevelopment.)
The work on the utilities below Second Place, which are apparently quite a mess, will also allow the park to install stormwater management infrastructure to be in place for when the new apartment buildings are constructed, so that the park can capture water from those buildings' roofs to be used in the park for irrigation, fountain water, and whatnot. And, if there's any money left over after the infrastructure work, there's now streetscape designs for the east side of Second Place that complement the park's design, which would extend the "feel" of the park across the street.
It's this infrastructure work that will begin this summer, prior to the actual start of work on the park itself. The hope is to have a groundbreaking ceremony in July, though at this point all timeline forecasts are subject to the completion of the permitting process for construction, and we know how THAT can sometimes go. This also assumes that there aren't any (more) big surprises lurking beneath Second Place in terms of the existing water, sewer, and other utility lines.
The park's opening date is still pegged at fall 2011, since the work on the park itself is expected to take between 12 and 14 months. The design is still pretty much the one that we've been seeing for a while--there are a few renderings on my Canal Park page, and you can also visit the official park web site for more details.
 

I'm back from tonight's public workshop held by the Marines as part of the process they're currently undergoing to find a site for a new barracks. For those just tuning in, the Marines are desperately needing to replace "Building 20," their lovely barracks structure on the southeast corner of 8th and I, and the new building needs to meet the many security requirements that now exist for Marine Corps living quarters. In what they readily admit is a new approach, the Corps is going through this series of public workshops to gauge public reponse to various sites that they have identified as possibilities. (There is also a "community leadership group" that meets monthly.) They are hoping to find an existing landowner to partner with, instead of how they might have operated in the past (with, shall we say, a little less give-and-take with the community and a takeover of the land rather than a partnership).There could be additional components to any new location (like a daycare center) that could be shared with nearby residents.
For more background, you can read my recent posts and links, or better yet, check the project web site, where they're doing a good job of posting all the latest materials from the process. Hopefully the slides and notes from tonight's session and Wednesday morning's will be posted soon, because what follows is really just a few points among the many that were discussed. But, as always, JDLand is the site where you get what you pay for {ahem}, so this is my best cut at it:
The potential expansion sites discussed this evening were: the existing "Annex" that was built in 2004 (along Virginia Avenue west of Seventh Street); the large area by 11th Street dubbed the "Exxon site" but which also includes the Virginia Avenue Park; Square 882 (the old Capper Seniors site), just south of the Annex on L Street west of Seventh; the northeast corner of the Navy Yard, where the Marines already have some operations inside the walls, and Tyler Elementary at 10th and G, SE, though it was quickly acknowledged that the DC Public Schools folks (and the parents) aren't really interested in that notion.
There were a number of residents (some of whom you already know from my comments section) who spoke strongly in support of the Marines expanding south across L Street into the northern half of Square 882, especially when it was mentioned that this option would most likely include the closing of L Street to vehicular traffic, which these residents of Capitol Quarter say is a speedway of drivers avoiding M Street. (Whether it would also be closed to public pedestrian traffic is not yet decided.) This opinion was not shared by Jennifer Steingasser of the city's Office of Planning, who said that the city would be very much against this solution. (And the Housing Authority seems to be indicating that it isn't really interested in the idea, at least as of now.)
In fact, Steingasser made clear that the city is very concerned that years of planning for the revitalization of Near Southeast, both as a mixed-use neighborhood and as part of the broader Anacostia Waterfront Initiative, are in danger if the Marines create a larger "secure enclave." She said that the city's preferred choice is for the Marines to build inside the walls of the Navy Yard, or on the existing Annex site on Virginia Avenue, or at any of the other federally owned properties in the city, such as the Armory and associated lands at RFK.
The possible loss of the athletic field at the Annex site if a new barracks were added there concerned the residents in attendance, with a possible replacement field at Virginia Avenue Park not seeming to fit the bill. But there were others (including Michael Stevens of the Capitol Riverfront BID) who supported the idea of more density on the Annex site, including perhaps demolishing the existing three-story parking garage and perhaps gaining control of the community center site next to the garage for additional square footage. (Stevens said that the BID would love to see the very-much-needed community center perhaps combined with a public school offering on the current Van Ness Elementary site.)
The discussions of the Exxon/Virginia Avenue Park site included the possibilities of the Marines using the entire area between Ninth and 11th and Virginia and M, which does include some private residences (and the spay and neuter clinic and a couple small businesses). The concern about whether retail and the "vibrant Main Street" feel envisioned by the city would be part of the M Street landscape in this scenario was voiced as well.
Needless to say, there was no consensus, nor was there expected to be at this stage, and this is just a small subset of the 2 1/2 hours of discussions, so I'll link to the official notes from the meeting once they're posted. There will be two more workshops, and a charrette in September. Again, see the official web site for more details, and how to submit your own comments.
UPDATE: Another view of the meeting, from Norm Metzger, with a little more detail on Jennifer Steingasser's comments. And there was this: "Bruce Jackson, of the CIMP team, noted the essence of the problem: That there was no choice on giving up Building 20 as living quarters, and that the hope was to use the CIMP process -- unique, according to Mr Jackson in the annals of military-community development efforts -- to create a 'win-win' outcome. That was later amended to 'everyone is going to have to give up something.'"
 

It's more than 100 pages of high finance and headache-inducing legalese, but nonetheless I've gotten my hands on the "Preliminary Official Statement" for what is expected to be a $29 million PILOT bond sale to fund a series of infrastructure improvements for future phases of the Capper/Carrollsburg redevelopment. (This is the document written for investors to help them decide whether or not to purchase the bonds.) If you want to know all about how these bonds are being structured (with monies from the Downtown TIF playing a part), this is the document for you. It also has some good background on the Capper project if you're just catching up.
But it also has a few tidbits on the current and projected path of some upcoming parts of the overall project, starting on page 19. Here are the items that are probably of most interest, with the usual caveats that no timeline is written in stone anymore:
* Financing for the second phase of Capitol Quarter is being negotiated and is expected to close in mid-2010. Development work would then begin in August, and vertical construction in November. (Phase 2 covers the blocks between Third and Fourth and I and M, and will contain 116 new for-sale townhouses and 47 public housing rental units.)
* All but five of the 121 CQ phase 1 townhouses have sold, and two of those are being held back as model units.
* Financing is "being negotiated" for the planned apartment building on the northern half of Square 882, the site that's been the subject of my recent posts on the Marines coveting the site as well. That financing is expected to close in late 2010 according to this document, with an expected completion date of the apartment building in April 2012.
This $29M bond sale is not the last one for Capper infrastructure; the city council approved a total of $55 million in bond funding back in 2006, and the document says that the city "expects" another bond issuance for the rest of the money, "though the timing of such issuance is currently uncertain" (page 10).
As for what exactly the monies will be funding, the document lays out the following (page 22), though this is for the entire $55 million, so it can't be said that this current $29 million offering will cover all this (which will bum out the people who see the phase "community center"). Some of this work would also happen on the streets surrounding Canal Park:
* Repairing and replacing underground water and utility lines;
* Repairing streets and streetscapes and adding landscaping;
* Demolishing the DPW building (and smoke stack!) at 900 New Jersey, relocating DPW's operations, environmental site remediations (remember, that site was operating as a trash transfer site as far back as 1905);
* Building I Street through to New Jersey Avenue; and
* Constructing the new community center at Fifth and K.
It's expected that the bonds will be "priced" this week, with the sale closing by the end of the month.
I hear rumors that DPW could be out of their site by next spring, as the search continues for a new home for their operations (and maybe is getting close to a resolution).
 

After my post yesterday about the Marines continuing to eye various sites for their new barracks and their interest in Square 882 (site of the old Capper Seniors building and where the DC Housing Authority wants to build a mixed-income apartment building as part of the Capper redevelopment), I've found out that last week the DCHA board voted to authorize an application to HUD for a loan guarantee to build on the site. Also, design documents for the new apartment building are now approved (see earlier renderings from last year's zoning approvals), and other work is in progress to prepare for submittal of building permit applications. There's even a preliminary schedule to begin infrastructure work on the site after the Nationals' season ends and their need for Parking Lot W is over.
Does this mean the notion of the Marines getting the site is finished? Is it a high-stakes game of chicken? Will the guys with guns ultimately take control of the site from the guys with apartments? As always, we shall see.
 

I'm embarrassed to admit how long it's been since I've visited the roof perch along New Jersey Avenue to take new photos of the land down below, but I finally got back there on Friday and have eased my conscience (though I wish it had been sunnier), and you can see the results here.
I now have my first overhead shots of the townhouses at Capitol Quarter, seen here compared with the same view in March 2006:
There's also photos of the view to the west, showing the changes the past few years have wrought:
The entire batch is here, though be sure to look for the icon because I wasn't able to update every angle. Also, use the "See All" links if you want to see the "between" photos of each angle.
Comments (0)
More posts: Capper, Capitol Quarter
 

It's assessment season again, and the Examiner reports that, citywide, commercial property assessments are down 10 percent, with residential numbers dropping between three and four percent. So I fired up the database I keep of the numbers for Near Southeast, added the new data as I do each year when the new numbers come out, and came up with a total assessed value for all properties of just under $5.9 billion, which is a 1.8 percent drop from the $6.01 billion tally reported in March of 2009.
But, wait! As I dug a little further, I found a flaw in my methodology that hadn't quite occurred to me before this year (though it probably hadn't been an issue too often before now): 11 of the big commercial buildings in Near Southeast had apparently appealed their initial 2010 assessments (sent out last year), lowering their tax bills by between 2 percent and 38 percent, from a combined $1.13 billion in the initial assessments to $909.36 million post-appeals. (Ten other buildings are showing no change in those assessments, and one--909 New Jersey--actually saw an 8 percent bump upwards, which was probably more of a function of the initial estimate being from before the building was completed.)
Taking these changes into account, the total assessments for 2010 for the neighborhood is closer to $5.88 billion, meaning that tally of the 2011 numbers just released of $5.89 billion would actually be a 1.9 percent increase. Except that I imagine that some property owners will be appealing again (since some of the 2011 numbers go right back to the original 2010 numbers that were appealed), and the $5.99 billion number will come down again.
Not all property in the neighborhood took a hit--with the opening of the first portions of Capitol Quarter, the blocks between Fourth and Fifth Street saw an increased value of $33 million, and the completion of Velocity raised the assessed value of its block from $99 million to $162 million.
And, since everyone will want to know: the behemoth of the area--Nationals Park--has an assessment unchanged from last year, at just a hair under $1 billion.
I'll check the numbers again later this year to see how many proposed 2011 assessments get altered.
Here's a quick table of the big properties that saw their 2010 assessments change from the original number released early in 2009:
Property Original 2010 Revised 2010 % Diff. Proposed 2011
300 M $132.26M $82.00M -38% $74.69M
55 M $162.60M $110.66M -32% $110.66M
80 M $124.08M $92.75M -25% $111.27M
100 M $90.98M $68.18M -25% $90.98M
1201 M (Martime #1) $87.97M $72.57M -18% $64.74M
1100 NJ $142.79M $121.40M -15% $139.16M
100 I $85.20M $73.00M -14% $85.20M
70 I $132.28M $119.00M -10% $132.28M
1000 NJ * $84.46M $81.06M -4% $79.75M
770 M (Blue Castle) $23.93M $23.17M -3% $23.93M
1220 12th (Maritime #2) $66.99M $65.57M -2% $47.57M
909 NJ $68.05M $73.58M 8% $79.93M
* This is for the residential portion of Capitol Hill Tower; the 2010 assessments on the Courtyard by Marriott show no change.
Comments (0)
More posts: assessments, Capper, Capitol Quarter, jpi, Square 699n
 

The snowblown February ANC 6D meeting finally went off tonight, and here's the Near Southeast-related bullet points:
* The Bullpen will be back in action this season, in its same spot on the northwest corner of Half and N across from the ballpark. There were two requested changes to the voluntary agreement between the ANC and the owner: that the bar be allowed to operate until 1:30 am (with alcohol sales ending at 1:00), and that liquor in non-frozen form be allowed alongside the already approved beer, wine, and frozen drinks, both of which are already allowed under the liquor license. The discussion was more contentious about process than it was about content (with commissioner David Sobelsohn arguing strongly that the motion should be tabled until the next meeting, which none of the other commissioners were interested in), but in the end the commission voted 6-1 to approve the extended hours, and that mixed drinks could be served during private events. There were some concerns from commissioner Rhonda Hamilton about the noise at the bar on weeknights, but owner Bo Blair said that live music will always be cut off by midnight.
* There is a move afoot by commission Bob Siegel to carve out some of the curb space in front of Capper Seniors #1 at 900 Fifth Street (which it must be noted is also across the street from his house). The street, which is one way in the block in question (between K and Virginia) gets clogged on a regular basis thanks to shuttle buses, vans, trucks, and other vehicles double-parking while at the building, and the residents want a portion of the curb cut out to allow vehicles to pull out of the traffic lane (like the one in front of the Courtyard by Marriott entrance). DDOT initially rejected the request because it was called a "curb cut," which means something different in traffic parlance, but DDOT's Ward 6 planner Jamie Henson was in attendance and pledged to help the ANC work with the engineering side of DDOT to see what could be done without taking away the sidewalk or the ADA ramps to the building.
* There was supposed to be an update from the Nationals, but no reps from the team were there; ANC chair Ron McBee did report that April 23 will be "Neighborhood Night" at the ballpark, with the first pitch and national anthem being performed by nearby residents and other goodies as well. (I imagine discount tickets will be part of the deal, but nothing was said. The game is against the Dodgers.) McBee also said that the ANC has requested a meeting with DDOT about the Traffic Operations and Parking Plan for this season, to check on how it's all going, but no specific concerns were mentioned. (With the Nats Express no longer shuttling fans to and from parking at RFK, there probably will be a noticeable uptick in traffic this year, even if attendance remains steady.)
* The next 6D meeting will be on March 8 at 7 pm, and it'll be held at the Courtyard by Marriott at New Jersey and L, so if you've been dying to go to a meeting but haven't felt like venturing across South Capitol, you'll get your chance. It's also worth mentioning that ANC 6B's meeting the next night includes an update by CSX on the Virginia Avenue project on its agenda.
 

Voice of the Hill has just posted an informative article giving a lot more detail on the Marine Corps' plans to replace the aging barracks building "20" on the north side of the freeway at Eighth and I, along with their desire to build additional facilities, including a fire station, child development center, gym, pool, parking, meeting space, post office, basketball and tennis courts, an indoor parade field, and a new Marine Barracks Washington museum. All in all, the Marines are looking for 173,000 square feet of space, some of which would be accessible (they say) to Hill residents.
Possible locations they're looking at for the new barracks appear to be north of the freeway (and outside of my boundaries!), including the Potomac Gardens public housing project at 12th and G, SE, and the Tyler Elementary baseball field at 10th and I, SE, but they are also considering the Marine Corps Institute site within the Washington Navy Yard. Also shown on their maps as a possible site is Square 882 (across from the barracks annex built in 2004), currently Nats Parking lot W on the site of the old Capper Seniors building, but the Voice article says that the DC Housing Authority has taken that block off the table--I've been hearing that DCHA is close to securing financing for the mixed-income apartment building they intend to build on the north side of that block, and would possibly begin construction by the end of this year.
The article also says that the current owners of the Blue Castle, Madison Marquette, have expressed an interest in leasing space in the old trolley barn to the Marines.
The Marines' web site for the development project has been updated with the packet from last week's open house, an FAQ, and other materials. There apparently will be a series of community meetings, which are described by the FAQ thusly: "The current plan is for the first workshop (February) to focus on needs and goals, the second workshop (March) to focus on potential development sites, the third workshop (April) to focus on CIMP alternatives, and the fourth workshop (May) to focus on CIMP consensus elements. Additionally, a charrette focused on the CIMP way forward will be held in fall 2010." (If you're interested in these, you should plan to attend rather than waiting for a JDLand report--I tend to stay away from community meetings that are pure planning sessions, because, well, they drive me insane.)
And note that this is a *different* armed forces expansion plan from the one we heard about last week, where the Navy is looking for additional office space outside of the walls of the Navy Yard. Got to keep your service branches straight these days!
 